{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T05:43:44Z","timestamp":1725515024856},"publisher-location":"Berlin, Heidelberg","reference-count":16,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540728689"},{"type":"electronic","value":"9783540728702"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-72870-2_11","type":"book-chapter","created":{"date-parts":[[2007,6,25]],"date-time":"2007-06-25T12:53:10Z","timestamp":1182775990000},"page":"108-119","source":"Crossref","is-referenced-by-count":0,"title":["Releasing and Scheduling of Lots in a Wafer Fab"],"prefix":"10.1007","author":[{"given":"Subhash C.","family":"Sarin","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vinod D.","family":"Shenai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lixin","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"11_CR1","first-page":"47","volume":"24","author":"R. Uzsoy","year":"1992","unstructured":"Uzsoy, R., Lee, C.Y., Martin-Vega, L.: A review of production planning and scheduling models in semiconductor industry \u2013 part I: system characteristics, performance evaluation and production planning. IIE Transactions, Scheduling and Logistics\u00a024, 47\u201361 (1992)","journal-title":"IIE Transactions, Scheduling and Logistics"},{"key":"11_CR2","first-page":"44","volume":"26","author":"R. Uzsoy","year":"1994","unstructured":"Uzsoy, R., Lee, C.Y., Martin-Vega, L.: A review of production planning and scheduling models in semiconductor industry \u2013 part II: shop-floor control. IIE Transactions, Scheduling and Logistics\u00a026, 44\u201355 (1994)","journal-title":"IIE Transactions, Scheduling and Logistics"},{"issue":"2","key":"11_CR3","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1109\/66.492820","volume":"9","author":"Y.F. Hung","year":"1996","unstructured":"Hung, Y.F., Leachman, R.C.: A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing\u00a09(2), 257\u2013269 (1996)","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"3","key":"11_CR4","doi-asserted-by":"publisher","first-page":"713","DOI":"10.1016\/S0360-8352(97)00229-5","volume":"33","author":"Y. Lee","year":"1997","unstructured":"Lee, Y., Kim, S., Yea, S., Kim, B.: Production planning in a semiconductor wafer fab considering variable cycle times. Computers in Industrial Engineering\u00a033(3), 713\u2013716 (1997)","journal-title":"Computers in Industrial Engineering"},{"key":"11_CR5","unstructured":"Golovin, J.J.: A total framework for semiconductor production planning and scheduling. In: Solid State Technology, pp. 167\u2013170 (1986)"},{"issue":"3","key":"11_CR6","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1109\/66.4384","volume":"1","author":"L. Wein","year":"1998","unstructured":"Wein, L.: Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing\u00a01(3), 115\u2013129 (1998)","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"11_CR7","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1109\/66.661295","volume":"11","author":"Y. Kim","year":"1998","unstructured":"Kim, Y., Kim, J., Lim, S., Jun, H.: Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing\u00a011(1), 155\u2013164 (1998)","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"3","key":"11_CR8","doi-asserted-by":"publisher","first-page":"374","DOI":"10.1109\/66.311341","volume":"7","author":"S. Lu","year":"1994","unstructured":"Lu, S., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing\u00a07(3), 374\u2013388 (1994)","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"11_CR9","unstructured":"Sarin, C.S., Shikalgar, S., Shenai, V.: Modeling and analysis for the reduction of cycle time at a wafer fab. In: Proceedings of the International Conference on Semiconductor Manufacturing Operational Modeling and Simulation (2001)"},{"issue":"4","key":"11_CR10","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1016\/0272-6963(83)90004-9","volume":"3","author":"S. Graves","year":"1983","unstructured":"Graves, S., Meal, H., Stefek, D., Zeghmi, A.: Scheduling of re-entrant flow shops. Journal of Operations Management\u00a03(4), 197\u2013207 (1983)","journal-title":"Journal of Operations Management"},{"key":"11_CR11","first-page":"165","volume":"30","author":"S.V. Mehta","year":"1998","unstructured":"Mehta, S.V., Uzsoy, R.: Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions\u00a030, 165\u2013178 (1998)","journal-title":"IIE Transactions"},{"key":"11_CR12","volume-title":"Scheduling: Theory, Algorithms and Systems","author":"M. Pinedo","year":"1995","unstructured":"Pinedo, M.: Scheduling: Theory, Algorithms and Systems. Prentice-Hall, Englewood Cliffs (1995)"},{"key":"11_CR13","volume-title":"Introduction to Sequencing and Scheduling","author":"K.R. Baker","year":"1974","unstructured":"Baker, K.R.: Introduction to Sequencing and Scheduling. John Wiley & Sons, Chichester (1974)"},{"key":"11_CR14","unstructured":"Shenai, V.: Releasing and scheduling of jobs in a wafer fab. Master thesis, Virginia Polytechnic Institute and State University (2003)"},{"key":"11_CR15","doi-asserted-by":"crossref","unstructured":"Weiss, G.: On optimal draining of re-entrant fluid lines. In: The IMA Volumes in Mathematics and its Applications, Stochastic Newtorks, vol.\u00a071, pp. 91\u2013103 (1995)","DOI":"10.1007\/978-1-4757-2418-9_4"},{"issue":"1","key":"11_CR16","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/mnsc.27.1.1","volume":"27","author":"M.L. Fisher","year":"1981","unstructured":"Fisher, M.L.: The Lagrangian relaxation method for solving integer programming problems. Management Science\u00a027(1), 1\u201318 (1981)","journal-title":"Management Science"}],"container-title":["Lecture Notes in Computer Science","Algorithmic Aspects in Information and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-72870-2_11.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T05:07:10Z","timestamp":1605762430000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-72870-2_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540728689","9783540728702"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-72870-2_11","relation":{},"subject":[]}}