{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,1,19]],"date-time":"2025-01-19T05:16:07Z","timestamp":1737263767743,"version":"3.33.0"},"publisher-location":"Berlin, Heidelberg","reference-count":21,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540729853"},{"type":"electronic","value":"9783540729860"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-72986-0_7","type":"book-chapter","created":{"date-parts":[[2007,7,6]],"date-time":"2007-07-06T04:54:10Z","timestamp":1183697650000},"page":"73-84","source":"Crossref","is-referenced-by-count":7,"title":["Activity-Based Scheduling of IT Changes"],"prefix":"10.1007","author":[{"given":"David","family":"Trastour","sequence":"first","affiliation":[]},{"given":"Maher","family":"Rahmouni","sequence":"additional","affiliation":[]},{"given":"Claudio","family":"Bartolini","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"7_CR1","unstructured":"IT Infrastructure Library, ITIL Service Delivery and ITIL Service Support, Office of Government Commerce, UK (2003)"},{"key":"7_CR2","unstructured":"ITIL Change Management Maturity Benchmark Study, White Paper, Evergreen, http:\/\/www.evergreensys.com\/whitepapers_tools\/whitepapers\/cmsurveyresults.pdf"},{"key":"7_CR3","unstructured":"The Bottom Line Project. IT Change Management Challenges \u2013 Results of 2006 Web Survey, Technical Report DSC005-06, Computing Systems Department, Federal University of Campina Grande, Brazil (2006)"},{"key":"7_CR4","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1007\/11907466_15","volume-title":"Large Scale Management of Distributed Systems","author":"J. Sauv\u00e9","year":"2006","unstructured":"Sauv\u00e9, J., Rebou\u00e7as, R., Moura, A., Bartolini, C., Boulmakoul, A., Trastour, D.: Business-driven support for change management: planning and scheduling of changes. In: State, R., van der Meer, S., O\u2019Sullivan, D., Pfeifer, T. (eds.) DSOM 2006. LNCS, vol.\u00a04269, pp. 23\u201325. Springer, Heidelberg (2006)"},{"key":"7_CR5","doi-asserted-by":"crossref","unstructured":"Rebou\u00e7as, R., Sauv\u00e9, J., Moura, A., Bartolini, C., Boulmakoul, A., Trastour, D.: A decision support tool to optimize scheduling of IT changes. In: Proc. 10th IFIP\/IEEE Symposium on Integrated Management (IM2007), Munich (May 2007)","DOI":"10.1109\/INM.2007.374799"},{"issue":"9","key":"7_CR6","first-page":"1245","volume":"38","author":"E. Elmaghraby","year":"1992","unstructured":"Elmaghraby, E., Kamburowski, J.: The Analysis of Activity Networks under Generalized Precedence Relations (GPRs). Salah Management Science\u00a038(9), 1245\u20131263 (1992)","journal-title":"Salah Management Science"},{"key":"7_CR7","unstructured":"ILOG Inc, ILOG CPLEX 10.1 user\u2019s manual and reference manual"},{"key":"7_CR8","volume-title":"Computer and Job-shop Scheduling Theory","author":"G. Coffman","year":"1976","unstructured":"Coffman, G.: Computer and Job-shop Scheduling Theory. Wiley and Sons Inc, Chichester (1976)"},{"key":"7_CR9","doi-asserted-by":"crossref","unstructured":"Sauv\u00e9, J.P., Moura, J.A.B., Sampaio, M.C., Jornada, J., Radziuk, E.: An Introductory Overview and Survey of Business\u2013Driven IT Management. In: Proceedings of the 1st IEEE\/IFIP International Workshop On Business-Driven IT Management (BDIM06), pp. 1\u201310","DOI":"10.1109\/BDIM.2006.1649205"},{"key":"7_CR10","doi-asserted-by":"crossref","unstructured":"Liu, Z., Squillante, M.S., Wolf, J.L.: On maximizing service-level agreement profits. In: Proceedings of the ACM Conference on Electronic Commerce (2001)","DOI":"10.1145\/501158.501185"},{"key":"7_CR11","unstructured":"Buco, M.J. et al.: Managing eBusiness on Demand SLA Contracts in Business Terms Using the Cross-SLA Execution Manager SAM. In: International Symposium on Autonomous Decentralized Systems (April 2002)"},{"key":"7_CR12","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","DOI":"10.1007\/11568285_7","volume-title":"Ambient Networks","author":"J. Sauv\u00e9","year":"2005","unstructured":"Sauv\u00e9, J., Marques, F., Moura, A., Sampaio, M., Jornada, J., Radziuk, E.: SLA Design from a Business Perspective. In: Sch\u00f6nw\u00e4lder, J., Serrat, J. (eds.) DSOM 2005. LNCS, vol.\u00a03775, Springer, Heidelberg (2005)"},{"key":"7_CR13","unstructured":"Aib, I., Sall\u00e9, M., Bartolini, C., Boulmakoul, A.: A Business Driven Management Framework for Utility Computing Environments, HP Labs Bristol Tech. Report 2004-171"},{"key":"7_CR14","doi-asserted-by":"crossref","unstructured":"Aiber, S., Gilat, D., Landau, A., Razinkov, N., Sela, A., Wasserkrug, S.: Autonomic Self\u2013Optimization According to Business Objectives. In: Proceedings of the International Conference on Autonomic Computing (2004)","DOI":"10.1109\/ICAC.2004.1301365"},{"key":"7_CR15","first-page":"223","volume-title":"Performance Evaluation","author":"D. Menasc\u00e9","year":"2000","unstructured":"Menasc\u00e9, D., Almeida, V.A.F., Fonseca, R., Mendes, M.A.: Business-Oriented Resource Management Policies for e-Commerce Servers. In: Performance Evaluation, vol.\u00a042, pp. 223\u2013239. Elsevier, North-Holland, Amsterdam (2000)"},{"key":"7_CR16","doi-asserted-by":"crossref","unstructured":"Bartolini, C., Sall\u00e9, M., Trastour, D.: IT Service Management driven by Business Objectives \u2013 An Application to Incident Management. In: Proc. IEEE\/IFIP Network Operations and Management Symposium (NOMS 2006) (April 2006)","DOI":"10.1109\/NOMS.2006.1687537"},{"key":"7_CR17","volume-title":"Proceedings of the IEEE\/IFIP Network Operations and Management Symposium","author":"A. Keller","year":"2004","unstructured":"Keller, A., Hellerstein, J., Wolf, J.L., Wu, K., Krishnan, V.: The CHAMPS System: Change Management with Planning and Scheduling. In: Proceedings of the IEEE\/IFIP Network Operations and Management Symposium (NOMS 2004), April 2004, IEEE Press, New York (2004)"},{"key":"7_CR18","series-title":"Lecture Notes in Computer Science","volume-title":"Utility Computing","author":"C. Bartolini","year":"2004","unstructured":"Bartolini, C., Sall\u00e9, M.: Business Driven Prioritization of Service Incidents. In: Sahai, A., Wu, F. (eds.) DSOM 2004. LNCS, vol.\u00a03278, Springer, Heidelberg (2004)"},{"key":"7_CR19","unstructured":"Wei, H., Frinke, D., Carter, O., et al.: Cost\u2013Benefit Analysis for Network Intrusion Detection Systems. In: Proceedings of the 28th Annual Computer Security Conference (October 2001)"},{"key":"7_CR20","unstructured":"Pinedo, M.: Scheduling: Theory, Algorithms, and Systems. Prentice Hall"},{"issue":"2","key":"7_CR21","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1287\/opre.45.2.201","volume":"45","author":"E.L. Demeulemeester","year":"1997","unstructured":"Demeulemeester, E.L., Herroelen, W.S: A Branch-And-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem. Operations Research\u00a045(2), 201\u2013212 (1997)","journal-title":"Operations Research"}],"container-title":["Lecture Notes in Computer Science","Inter-Domain Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-72986-0_7.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,1,18]],"date-time":"2025-01-18T06:51:37Z","timestamp":1737183097000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-72986-0_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540729853","9783540729860"],"references-count":21,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-72986-0_7","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[]}}