{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T22:08:29Z","timestamp":1725487709826},"publisher-location":"Berlin, Heidelberg","reference-count":19,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540733225"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-73325-6_36","type":"book-chapter","created":{"date-parts":[[2007,7,17]],"date-time":"2007-07-17T04:05:23Z","timestamp":1184645123000},"page":"364-373","source":"Crossref","is-referenced-by-count":0,"title":["Agent Based Dynamic Job Shop Simulation System"],"prefix":"10.1007","author":[{"given":"\u015eerafettin","family":"Alpay","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"36_CR1","unstructured":"Jain, A.S., Meeron, S.: A state-of-the-art-review of job shop scheduling tecniques (1998), http:\/\/citeseer.nj.nec.com\/jain98stateart.htm"},{"key":"36_CR2","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1016\/0305-0483(90)90017-4","volume":"18","author":"R. Ramasesh","year":"1990","unstructured":"Ramasesh, R.: Dynamic job shop scheduling: a survey of simulation research. OMEGA\u00a018, 43\u201357 (1990)","journal-title":"OMEGA"},{"issue":"6","key":"36_CR3","doi-asserted-by":"publisher","first-page":"1539","DOI":"10.1080\/00207549608904983","volume":"34","author":"D.B. Roman","year":"1996","unstructured":"Roman, D.B., del Valle, A.G.: Dynamic assignation of due dates in an assembly shop based simulation. International Journal of Production Research\u00a034(6), 1539\u20131554 (1996)","journal-title":"International Journal of Production Research"},{"issue":"8","key":"36_CR4","first-page":"1003","volume":"37","author":"L.W. Wein","year":"1991","unstructured":"Wein, L.W., Ou, J.: The impact of processing time knowledge on dynamic job shop scheduling. Management Science\u00a037(8), 1003\u20131014 (1991)","journal-title":"Management Science"},{"key":"36_CR5","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"T.C.E Cheng","year":"1989","unstructured":"Cheng, T.C.E, Gupta, M.C.: Survey of scheduling research involving due date determination decisions. European. Journal of Operations Research\u00a038, 156\u2013166 (1989)","journal-title":"European. Journal of Operations Research"},{"key":"36_CR6","doi-asserted-by":"crossref","unstructured":"Jones, A., Rabelo, L.C.: Survey of job shop scheduling (1999), http:\/\/www.nist.gov\/msidlibrary\/doc\/jobshop1.pdf","DOI":"10.1002\/047134608X.W3352"},{"issue":"2","key":"36_CR7","doi-asserted-by":"publisher","first-page":"185","DOI":"10.1016\/0305-0548(88)90001-9","volume":"15","author":"T.C.E Cheng","year":"1988","unstructured":"Cheng, T.C.E: Optimal common due date with limited completion time deviation. Comput. Opns. Res.\u00a015(2), 185\u2013188 (1988)","journal-title":"Comput. Opns. Res."},{"issue":"12","key":"36_CR8","doi-asserted-by":"publisher","first-page":"3379","DOI":"10.1080\/002075497194138","volume":"35","author":"C.H Tsai","year":"1997","unstructured":"Tsai, C.H, Chang, G.T., LI, R.K.: Integrating order release control with due date assignment rules. International Journal of Production Research\u00a035(12), 3379\u20133392 (1997)","journal-title":"International Journal of Production Research"},{"issue":"7","key":"36_CR9","doi-asserted-by":"publisher","first-page":"1361","DOI":"10.1080\/00207549108948016","volume":"29","author":"M.M. Vig","year":"1991","unstructured":"Vig, M.M., Dooley, K.J.: Dynamic rules for due date assignment. International Journal of Production Research\u00a029(7), 1361\u20131377 (1991)","journal-title":"International Journal of Production Research"},{"key":"36_CR10","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1016\/S0360-8352(03)00042-1","volume":"45","author":"A. Lengyel","year":"2003","unstructured":"Lengyel, A., Hatono, I., Ueda, K.: Scheduling for on-time completion in job shops using feasibility function. Computers & Industrial Engineering\u00a045, 215\u2013229 (2003)","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"36_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0278-6125(91)90042-Z","volume":"10","author":"J.R Rajasekera","year":"1991","unstructured":"Rajasekera, J.R, Murr, M.R., So, K.C.: A due date assignment model for a flow shop with application in a lightguide cable shop. Journal of Manufacturing Systems\u00a010(1), 1\u20137 (1991)","journal-title":"Journal of Manufacturing Systems"},{"key":"36_CR12","volume-title":"Handbook of Industrial Engineering","author":"K. Bhaskaran","year":"1992","unstructured":"Bhaskaran, K., Pinedo, M.: Dispatching. In: Salvendy, G. (ed.) Handbook of Industrial Engineering. ch. 83, John Wiley and Sons, New York (1992)"},{"key":"36_CR13","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1080\/00207548208947745","volume":"20","author":"J.H. Blackstone","year":"1982","unstructured":"Blackstone, J.H., Phillips, D.T., Hogg, G.L.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research\u00a020, 27\u201345 (1982)","journal-title":"International Journal of Production Research"},{"key":"36_CR14","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1287\/opre.25.1.45","volume":"25","author":"S.S. Panwalker","year":"1977","unstructured":"Panwalker, S.S., Iskander, W.: A survey of dispatching rules. Operations Research\u00a025, 45\u201361 (1977)","journal-title":"Operations Research"},{"key":"36_CR15","volume-title":"Simulation modeling and analysis","author":"A.M. Law","year":"1991","unstructured":"Law, A.M., Kelton, W.D.: Simulation modeling and analysis. McGraw-Hall, New York (1991)"},{"issue":"3","key":"36_CR16","doi-asserted-by":"publisher","first-page":"225","DOI":"10.2307\/2582253","volume":"36","author":"T.C.E Cheng","year":"1985","unstructured":"Cheng, T.C.E: Analysis of job flow time in a job shop. Journal of Operations Research Society\u00a036(3), 225\u2013230 (1985)","journal-title":"Journal of Operations Research Society"},{"issue":"2","key":"36_CR17","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1016\/S0360-8352(97)00317-3","volume":"34","author":"T.C.E Cheng","year":"1998","unstructured":"Cheng, T.C.E, Jiang, J.: Job shop scheduling for missed due dates performance. Computers and Industrial Engineering\u00a034(2), 297\u2013307 (1998)","journal-title":"Computers and Industrial Engineering"},{"issue":"6","key":"36_CR18","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/0278-6125(95)90063-Q","volume":"13","author":"F.C.R. Chang","year":"1997","unstructured":"Chang, F.C.R.: A study of factors affecting due date predictibility in a simulated dynamic job shop. Journal of Manufacturing Systems\u00a013(6), 393\u2013400 (1997)","journal-title":"Journal of Manufacturing Systems"},{"key":"36_CR19","doi-asserted-by":"publisher","first-page":"1164","DOI":"10.1007\/s00170-003-1937-y","volume":"25","author":"D.Y. Sha","year":"2005","unstructured":"Sha, D.Y., Liu, C.-H.: Using data mining for due date assignment in a dynamic job shop environment. Int. Adv. Manuf. Technol.\u00a025, 1164\u20131174 (2005)","journal-title":"Int. Adv. Manuf. Technol."}],"container-title":["Lecture Notes in Computer Science","New Trends in Applied Artificial Intelligence"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-73325-6_36.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,19]],"date-time":"2020-11-19T05:13:36Z","timestamp":1605762816000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-73325-6_36"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540733225"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-73325-6_36","relation":{},"subject":[]}}