{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,1,21]],"date-time":"2025-01-21T05:18:31Z","timestamp":1737436711803,"version":"3.33.0"},"publisher-location":"Berlin, Heidelberg","reference-count":13,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540747680"},{"type":"electronic","value":"9783540747697"}],"license":[{"start":{"date-parts":[[2007,1,1]],"date-time":"2007-01-01T00:00:00Z","timestamp":1167609600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2007]]},"DOI":"10.1007\/978-3-540-74769-7_62","type":"book-chapter","created":{"date-parts":[[2007,8,24]],"date-time":"2007-08-24T15:27:53Z","timestamp":1187969273000},"page":"579-589","source":"Crossref","is-referenced-by-count":1,"title":["Modeling and Real-Time Scheduling of Semiconductor Manufacturing Line Based on Simulation"],"prefix":"10.1007","author":[{"given":"Zhongjie","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xinhua","family":"Jiang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qidi","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"62_CR1","unstructured":"Quirk, M., Serda, J.: Semiconductor manufacturing technology. Electronic industry publisher (2004)"},{"key":"62_CR2","doi-asserted-by":"crossref","unstructured":"Kumar, P.R.: Re-entrant lines. Queuing Systems\u00a013(1-2) (1993)","DOI":"10.1007\/BF01158930"},{"key":"62_CR3","doi-asserted-by":"crossref","unstructured":"Wang, Z., Wu, Q.: Multi-object optimal scheduling for semiconductor manufacturing line based on satisfactory control. In: Proceedings of the American Control Conference, vol.\u00a02, pp. 1603\u20131608 (2002)","DOI":"10.1109\/ACC.2002.1023251"},{"key":"62_CR4","doi-asserted-by":"crossref","unstructured":"Sikora, R., Shaw, M.J.: Coordination mechanisms for multi-agent manufacturing systems: applications to integrated manufacturing scheduling. IEEE Transactions on Engineering Management\u00a044(2), 175\u2013187","DOI":"10.1109\/17.584925"},{"key":"62_CR5","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1109\/WCICA.2002.1022069","volume":"1","author":"X.-r. Wang","year":"2002","unstructured":"Wang, X.-r., Wu, T.-J.: Ant colony optimization for intelligent scheduling. Proceedings of the 4th World Congress on Intelligent Control and Automation\u00a01, 66\u201370 (2002)","journal-title":"Proceedings of the 4th World Congress on Intelligent Control and Automation"},{"key":"62_CR6","unstructured":"Zhongjie, W., Qidi, W.: Investigation of control and scheduling of semiconductor manufacturing line. Computer Integrated Manufacturing System-CIMS, pp. 607\u2013611 (2003)"},{"key":"62_CR7","doi-asserted-by":"crossref","unstructured":"Zhongjie, W.: Research of optimal scheduling of semiconductor manufacturing line based on hierarchical control. Post Doctorate Report, Shanghai, Tongji University (2002)","DOI":"10.1109\/ACC.2002.1023251"},{"key":"62_CR8","first-page":"35","volume":"7","author":"L. Qi","year":"2004","unstructured":"Qi, L., Dali, L., Li, Z.: Optimal decision in production plan of semiconductor industry: linear programming. Semiconductor technology\u00a07, 35\u201339 (2004)","journal-title":"Semiconductor technology"},{"key":"62_CR9","doi-asserted-by":"crossref","unstructured":"Chong, C.S.: Simulation-based scheduling for dynamic discrete manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, vol.\u00a02, pp. 1465\u20131473 (2003)","DOI":"10.1109\/WSC.2003.1261590"},{"key":"62_CR10","unstructured":"Thompson, Michael.: Simulation-based scheduling: meeting the semiconductor wafer fabrication challenge Industrial Engineer (May 1996)"},{"key":"62_CR11","unstructured":"Miller, D.J.: Simulation of a SML Communications of the ACM 33, 98\u2013108 (1990)"},{"key":"62_CR12","doi-asserted-by":"crossref","unstructured":"Watt, D.G.: Integrating simulation based scheduling with MES in a semi-conductor fabrication Winter Simulation Conference Proceedings. vol. 2, pp. 1713\u20131715 (1998)","DOI":"10.1109\/WSC.1998.746052"},{"key":"62_CR13","doi-asserted-by":"crossref","unstructured":"Lu Steve, C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans. Semiconductor Manufacturing, 373\u2013388 (1994)","DOI":"10.1109\/66.311341"}],"container-title":["Lecture Notes in Computer Science","Bio-Inspired Computational Intelligence and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-74769-7_62","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,1,20]],"date-time":"2025-01-20T16:54:57Z","timestamp":1737392097000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-74769-7_62"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007]]},"ISBN":["9783540747680","9783540747697"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-74769-7_62","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2007]]}}}