{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T13:19:37Z","timestamp":1770988777918,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540747796","type":"print"},{"value":"9783540747802","type":"electronic"}],"license":[{"start":{"date-parts":[[2007,1,1]],"date-time":"2007-01-01T00:00:00Z","timestamp":1167609600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2007]]},"DOI":"10.1007\/978-3-540-74780-2_36","type":"book-chapter","created":{"date-parts":[[2007,8,30]],"date-time":"2007-08-30T03:05:09Z","timestamp":1188443109000},"page":"290-297","source":"Crossref","is-referenced-by-count":7,"title":["A Two-Level Programming Method for Collaborative Scheduling in Construction Supply Chain Management"],"prefix":"10.1007","author":[{"given":"Xiaolong","family":"Xue","sequence":"first","affiliation":[]},{"given":"Chengshuang","family":"Sun","sequence":"additional","affiliation":[]},{"given":"Yaowu","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Qiping","family":"Shen","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"1","key":"36_CR1","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1287\/inte.25.1.69","volume":"25","author":"B.C. Arntzen","year":"1995","unstructured":"Arntzen, B.C., Brown, G.G., Harrison, T.P., Trafton, L.L.: Global supply chain management at Digital Equipment Corporation. Interfaces\u00a025(1), 69\u201393 (1995)","journal-title":"Interfaces"},{"key":"36_CR2","doi-asserted-by":"publisher","first-page":"777","DOI":"10.1080\/01446190110081699","volume":"19","author":"K.A. London","year":"2001","unstructured":"London, K.A., Kenley, R.: An industrial organization economic supply chain approach for the construction industry: a review. Construction Management and Economics\u00a019, 777\u2013788 (2001)","journal-title":"Construction Management and Economics"},{"key":"36_CR3","unstructured":"O\u2019Brien, W.J.: Construction supply-chain management: a vision for advanced coordination, costing, and control. In: NSF Berkeley-Stanford Construction Research Workshop, Stanford, California (1999)"},{"issue":"3","key":"36_CR4","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1016\/j.autcon.2003.10.002","volume":"13","author":"R.J. Dzeng","year":"2004","unstructured":"Dzeng, R.J., Tommelein, I.D.: Product modelling to support case-based construction planning and scheduling. Automation in Construction\u00a013(3), 341\u2013360 (2004)","journal-title":"Automation in Construction"},{"issue":"1","key":"36_CR5","doi-asserted-by":"publisher","first-page":"102","DOI":"10.1061\/(ASCE)0733-9364(2005)131:1(102)","volume":"131","author":"M. Chester","year":"2005","unstructured":"Chester, M., Hendrickson, C.: Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management\u00a0131(1), 102\u2013107 (2005)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"2","key":"36_CR6","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1111\/j.1467-8667.2005.00420.x","volume":"21","author":"H. Zhang","year":"2006","unstructured":"Zhang, H., Tam, C.M., Li, H.: Multimode Project Scheduling Based on Particle Swarm Optimization. Computer-Aided Civil and Infrastructure Engineering\u00a021(2), 93\u2013103 (2006)","journal-title":"Computer-Aided Civil and Infrastructure Engineering"},{"issue":"1","key":"36_CR7","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1061\/(ASCE)0742-597X(2006)22:1(11)","volume":"22","author":"K. Hyari","year":"2006","unstructured":"Hyari, K., El-Rayes, K.: Optimal planning and scheduling for repetitive construction projects. Journal of Management in Engineering\u00a022(1), 11\u201319 (2006)","journal-title":"Journal of Management in Engineering"},{"issue":"3","key":"36_CR8","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1287\/ijoc.1040.0121","volume":"18","author":"G. Zhu","year":"2006","unstructured":"Zhu, G., Bard, J.F., Yu, G.: A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem. INFORMS Journal on Computing\u00a018(3), 377\u2013390 (2006)","journal-title":"INFORMS Journal on Computing"},{"issue":"3","key":"36_CR9","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1016\/j.autcon.2004.08.010","volume":"14","author":"X.L. Xue","year":"2005","unstructured":"Xue, X.L., Li, X.D., Shen, Q.P., Wang, Y.W.: An agent-based framework for supply chain coordination in construction. Automation in Construction\u00a014(3), 413\u2013430 (2005)","journal-title":"Automation in Construction"},{"issue":"4","key":"36_CR10","doi-asserted-by":"publisher","first-page":"505","DOI":"10.1111\/j.1540-5915.2002.tb01654.x","volume":"33","author":"F. Sahin","year":"2002","unstructured":"Sahin, F., Robinson, E.P.: Flow coordination and information sharing in supply chains: review, implications, and directions for future research. Decision Sciences\u00a033(4), 505\u2013536 (2002)","journal-title":"Decision Sciences"},{"key":"36_CR11","doi-asserted-by":"crossref","unstructured":"Roghanian, E., Sadjadi, S.J., Aryanezhad, M.B.: A probabilistic bi-level linear multi-objective programming problem to supply chain planning. Applied Mathematics and Computation (2006), doi:10.1016\/j.amc.2006.10.032","DOI":"10.1016\/j.amc.2006.10.032"},{"key":"36_CR12","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C.D., Cecchi, M.P.: Optimization by simulated annealing. Science\u00a0220, 671\u2013680 (1983)","journal-title":"Science"},{"issue":"1-2","key":"36_CR13","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1016\/S0360-8352(01)00013-4","volume":"40","author":"T. Lacksonen","year":"2001","unstructured":"Lacksonen, T.: Empirical comparison of search algorithms for discrete event simulation. Computers & Industrial Engineering\u00a040(1-2), 133\u2013148 (2001)","journal-title":"Computers & Industrial Engineering"},{"key":"36_CR14","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1007\/BF01100688","volume":"5","author":"H.E. Romeijn","year":"1994","unstructured":"Romeijn, H.E., Smith, R.L.: Simulated annealing for constrained global optimization. Journal of Global Optimization\u00a05, 101\u2013124 (1994)","journal-title":"Journal of Global Optimization"},{"issue":"2","key":"36_CR15","first-page":"97","volume":"12","author":"Q. Wu","year":"1997","unstructured":"Wu, Q., Xu, N.: A new method for solving a class of nonlinear integer programming problems. Control and Decision\u00a012(2), 97\u2013102, 108 (1997)","journal-title":"Control and Decision"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-74780-2_36","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,21]],"date-time":"2019-05-21T21:45:45Z","timestamp":1558475145000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-74780-2_36"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007]]},"ISBN":["9783540747796","9783540747802"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-74780-2_36","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007]]}}}