{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T05:45:05Z","timestamp":1781070305714,"version":"3.54.1"},"publisher-location":"Berlin, Heidelberg","reference-count":19,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783540789840","type":"print"},{"value":"9783540789857","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008]]},"DOI":"10.1007\/978-3-540-78985-7_10","type":"book-chapter","created":{"date-parts":[[2008,8,21]],"date-time":"2008-08-21T08:24:18Z","timestamp":1219307058000},"page":"255-276","source":"Crossref","is-referenced-by-count":46,"title":["A Genetic Algorithm for Railway Scheduling Problems"],"prefix":"10.1007","author":[{"given":"P.","family":"Tormos","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"A.","family":"Lova","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"F.","family":"Barber","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"L.","family":"Ingolotti","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M.","family":"Abril","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M. A.","family":"Salido","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"issue":"5","key":"10_CR1_1","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1016\/0305-0548(94)90099-X","volume":"21","author":"X Cai","year":"1994","unstructured":"X. Cai and C. J. Goh. A fast heuristic for the train scheduling problem. Computers and Operations Research, 21(5):499\u2013510, 1994.","journal-title":"Computers and Operations Research"},{"key":"10_CR2_1","doi-asserted-by":"publisher","first-page":"851","DOI":"10.1287\/opre.50.5.851.362","volume":"50","author":"A Caprara","year":"2002","unstructured":"A. Caprara, M. Fischetti, and P. Toth. Modeling and solving the train timetabling problem. Operations Research, 50:851\u2013861, 2002.","journal-title":"Operations Research"},{"key":"10_CR3_1","doi-asserted-by":"publisher","first-page":"738","DOI":"10.1016\/j.dam.2005.05.026","volume":"154","author":"A Caprara","year":"2006","unstructured":"A. Caprara, M. Monaci, P. Toth, and P. Guida. A lagrangian heuristic algorithm for a real -world train timetabling problem. Discrete Applied Mathematics, 154:738\u2013753, 2006.","journal-title":"Discrete Applied Mathematics"},{"issue":"8","key":"10_CR4_1","doi-asserted-by":"publisher","first-page":"988","DOI":"10.2307\/3009909","volume":"46","author":"M Carey","year":"1995","unstructured":"M. Carey and D. Lockwood. A model, algorithms and strategy for train pathing. The Journal of the Operational Research Society, 46(8):988\u20131005, 1995.","journal-title":"The Journal of the Operational Research Society"},{"key":"10_CR5_1","unstructured":"D.E. Goldberg. Genetic Algorithms in Search, Optimization and Machine Learning. Adison Wesley, 1989."},{"issue":"1","key":"10_CR6_1","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1023\/A:1009672832658","volume":"3","author":"A Higgins","year":"1997","unstructured":"A. Higgins, E. Kozan, and L. Ferreira. Heuristic techniques for single line train scheduling. Journal of Heuristics, 3(1):43\u201362, 1997.","journal-title":"Journal of Heuristics"},{"key":"10_CR7_1","doi-asserted-by":"crossref","unstructured":"L. Ingolotti, A. Lova, F. Barber, P. Tormos, M.A. Salido, and M. Abril. New heuristics to solve the csop railway timetabling problem. Advances in Applied Artificial Intelligence. LNAI, Subseries of Lecture Notes in Computer Science, 2006.","DOI":"10.1007\/11779568_44"},{"issue":"1","key":"10_CR8_1","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1287\/trsc.25.1.46","volume":"25","author":"D Jovanovic","year":"1991","unstructured":"D. Jovanovic and P. T. Harker. Tactical scheduling of rail operations: The scan i system. Transportation Science, 25(1):46\u201364, 1991.","journal-title":"Transportation Science"},{"key":"10_CR9_1","unstructured":"J. Kelley. The critical-path method: Resources planning and scheduling. Industrial Scheduling, 1963."},{"issue":"2","key":"10_CR10_1","doi-asserted-by":"publisher","first-page":"198","DOI":"10.1287\/trsc.37.2.198.15247","volume":"37","author":"L Kroon","year":"2003","unstructured":"L. Kroon and L. Peeters. A variable time model for cycling railway timetabling. Transportation Science, 37(2):198\u2013212, 2003.","journal-title":"Transportation Science"},{"key":"10_CR11_1","doi-asserted-by":"crossref","unstructured":"R. K. S. Kwan and P. Mistry. A co-evolutionary algorithm for train timetabling. In IEEE Press, editor, Congress on Evolutionary Computation, pages 2142\u20132148, 2003.","DOI":"10.1109\/CEC.2003.1299937"},{"key":"10_CR12_1","unstructured":"C. Liebchen. Periodic Timetable Optimization in Public Transport. dissertation.de - Verlag im Internet GmbH 2006, 2006."},{"key":"10_CR13_1","doi-asserted-by":"publisher","first-page":"453","DOI":"10.1016\/0305-0548(95)00032-1","volume":"23","author":"K Nachtigall","year":"1996","unstructured":"K. Nachtigall and S. Voget. A genetic algorithm approach to periodic railway synchronization. Computers and Operations Research, 23:453\u2013463, 1996.","journal-title":"Computers and Operations Research"},{"issue":"6","key":"10_CR14_1","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1016\/0191-2615(96)00005-7","volume":"30","author":"M Odijk","year":"1996","unstructured":"M. Odijk. A constraint generation algorithm for the construction of periodic railway timetables. Transportation Research Part B, 30(6):455\u2013464, December 1996.","journal-title":"Transportation Research Part B"},{"key":"10_CR15_1","unstructured":"A. Schirmer and S Riesenberg. Parameterized heuristics for project scheduling-biased random sampling methods. Technical Report 456, Institute fr Betriebswirtschaftslehre der UNIVERSITT KIEL, 1997."},{"key":"10_CR16_1","doi-asserted-by":"publisher","first-page":"550","DOI":"10.1137\/0402049","volume":"2","author":"P Serafini","year":"1989","unstructured":"P. Serafini and W. Ukovich. A mathematical model for periodic scheduling problems. SIAM J. on Discrete Mathematics, 2:550\u2013581, 1989.","journal-title":"SIAM J. on Discrete Mathematics"},{"key":"10_CR17_1","unstructured":"E. Silva de Oliveira. Solving Single-Track Railway Scheduling Problem Using Constraint Programming. PhD thesis, The University of Leeds, School of Computing, September 2001."},{"key":"10_CR18_1","unstructured":"B. Szpigel. Optimal train scheduling on a single track railway. In M. In Roos, editor, Proceedings of IFORS Conference on Operational Research\u201972, pages 343\u2013352, 1973."},{"issue":"1\u20134","key":"10_CR19_1","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1023\/A:1010997814183","volume":"102","author":"P Tormos","year":"2001","unstructured":"P. Tormos and A. Lova. A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research, 102(1-4):65\u201381, 2001.","journal-title":"Annals of Operations Research"}],"container-title":["Studies in Computational Intelligence","Metaheuristics for Scheduling in Industrial and Manufacturing Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-78985-7_10.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T11:06:26Z","timestamp":1619521586000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-78985-7_10"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008]]},"ISBN":["9783540789840","9783540789857"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-78985-7_10","relation":{},"ISSN":["1860-949X"],"issn-type":[{"value":"1860-949X","type":"print"}],"subject":[],"published":{"date-parts":[[2008]]}}}