{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T14:58:59Z","timestamp":1725548339202},"publisher-location":"Berlin, Heidelberg","reference-count":17,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540858621"},{"type":"electronic","value":"9783540858638"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/978-3-540-85863-8_5","type":"book-chapter","created":{"date-parts":[[2008,9,12]],"date-time":"2008-09-12T10:33:54Z","timestamp":1221215634000},"page":"29-37","source":"Crossref","is-referenced-by-count":6,"title":["Multiagent Approach for Supply Chain Integration by Distributed Production Planning, Scheduling and Control System"],"prefix":"10.1007","author":[{"given":"Pawel","family":"Pawlewski","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Paulina","family":"Golinska","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marek","family":"Fertsch","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jesus A.","family":"Trujillo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zbigniew J.","family":"Pasek","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"5_CR1","unstructured":"Golinska, P., Brehm, N., Fertsch, M., Marx Gomez, J., Oleskow, J., Pawlewski, P.: The proposal of production planning and control system applicable by supply chain integration by through agent-based solutions. In: The proceedings of the 19th ICPR, 19th International Conference on Production Research, Valparaiso, Chile, 27.07-02.08 (2007)"},{"key":"5_CR2","volume-title":"Genetic Algorithms in Search, Optimization, and Machine learning","author":"D. Goldberg","year":"1989","unstructured":"Goldberg, D.: Genetic Algorithms in Search, Optimization, and Machine learning. Addison-Wesley, Reading (1989)"},{"key":"5_CR3","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1080\/095372800232199","volume":"11","author":"V.D.R. Guide","year":"2000","unstructured":"Guide, V.D.R., Shiverasta, R.: A review of techniques for buffering against uncertainty with MRP systems. Prod., Planning and Control\u00a011, 223\u2013233 (2000)","journal-title":"Prod., Planning and Control"},{"key":"5_CR4","doi-asserted-by":"publisher","first-page":"1081","DOI":"10.1080\/00207549608904951","volume":"34","author":"V.D.R. Guide Jr.","year":"1996","unstructured":"Guide Jr., V.D.R.: Scheduling using DBR in a remanufacturing environment. Int. Journal of Production Research\u00a034, 1081\u20131091 (1996)","journal-title":"Int. Journal of Production Research"},{"key":"5_CR5","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, D., Vecchi, M.P.: Optimization by simulating annealing. Science\u00a0220, 671\u2013680 (1983)","journal-title":"Science"},{"key":"5_CR6","first-page":"3","volume-title":"Applications of Intelligent Agents. Agent Technology: Foundations, Applications, and Markets","author":"N.R. Jennings","year":"1998","unstructured":"Jennings, N.R., Wooldridge, M.J.: Applications of Intelligent Agents. Agent Technology: Foundations, Applications, and Markets, pp. 3\u201328. Springer, Heidelberg (1998)"},{"issue":"B10","key":"5_CR7","doi-asserted-by":"publisher","first-page":"1437","DOI":"10.1243\/0954405011519060","volume":"215","author":"F.T.S. Chang","year":"2001","unstructured":"Chang, F.T.S., Zhang, J., Li, P.: Modelling of integrated distributed and co-operative process planning system using an agent-based approach. Proc. Inst. Mech. Eng., Part B-J. Eng. Manuf.\u00a0215(B10), 1437\u20131451 (2001)","journal-title":"Proc. Inst. Mech. Eng., Part B-J. Eng. Manuf."},{"issue":"3","key":"5_CR8","first-page":"116","volume":"3","author":"M. Pechoucek","year":"2003","unstructured":"Pechoucek, M., \u0158\u00edha, A., Vokr\u00ednek, J., Mar\u00edk, V., Prazma, V.: ExPlanTech: Applying Multi-agent Systems in Production Planning. Production Planning and Control\u00a03(3), 116\u2013125 (2003)","journal-title":"Production Planning and Control"},{"key":"5_CR9","doi-asserted-by":"crossref","unstructured":"Saygin, C., Kilic, S.: Integrating flexible process plans with scheduling in flexible manufacturing systems. Int. J. Adv. Manufacturing Tech.\u00a015(4), 268\u2013280","DOI":"10.1007\/s001700050066"},{"issue":"3","key":"5_CR10","first-page":"18","volume":"31","author":"E. Schragenheim","year":"1996","unstructured":"Schragenheim, E., Ronen, B.: Drum\u2013buffer\u2013rope shop floor control. Productions and Inventory Management Journal\u00a031(3), 18\u201322 (1996)","journal-title":"Productions and Inventory Management Journal"},{"key":"5_CR11","doi-asserted-by":"crossref","unstructured":"Shen, W., Wang, L., Hao, Q.: Agent-Based Distributed Manufacturing Process Planning and Scheduling: A state-of-art survey. IEEE Transactions on Systems, Man and Cybernetics-Part C: Applications and Reviews\u00a036(4) (2006)","DOI":"10.1109\/TSMCC.2006.874022"},{"issue":"1","key":"5_CR12","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1109\/5254.988492","volume":"17","author":"W. Shen","year":"2002","unstructured":"Shen, W.: Distributed manufacturing scheduling using intelligent agent. IEEE Expert \/Intell.Syst.\u00a017(1), 88\u201394 (2002)","journal-title":"IEEE Expert \/Intell.Syst."},{"issue":"2","key":"5_CR13","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1108\/09600030210421705","volume":"32","author":"D.R. Towill","year":"2002","unstructured":"Towill, D.R., Childerhouse, P., Disney, S.M.: Integrating the Automotive Supply Chain: Where are we Now? International Journal of Physical Distribution and Logistics Management\u00a032(2), 79\u201395 (2002)","journal-title":"International Journal of Physical Distribution and Logistics Management"},{"key":"5_CR14","unstructured":"Viera, G.E., Favetto, F.: Understanding the complexity of Master Production Scheduling Optimization. In: Proceeding of the 18th ICPR, Salerno, Italy (2005)"},{"issue":"1","key":"5_CR15","doi-asserted-by":"publisher","first-page":"429","DOI":"10.1016\/S0007-8506(07)62357-9","volume":"44","author":"W.H.M. Zijm","year":"1995","unstructured":"Zijm, W.H.M.: The integration of process planning and shop floor scheduling in small batch part manufacturing. Ann CIRP\u00a044(1), 429\u2013432 (1995)","journal-title":"Ann CIRP"},{"key":"5_CR16","unstructured":"http:\/\/jade.tilab.com"},{"key":"5_CR17","unstructured":"http:\/\/www.fipa.org"}],"container-title":["Advances in Soft Computing","International Symposium on Distributed Computing and Artificial Intelligence 2008 (DCAI 2008)"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-85863-8_5.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,23]],"date-time":"2020-11-23T21:35:35Z","timestamp":1606167335000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-85863-8_5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540858621","9783540858638"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-85863-8_5","relation":{},"ISSN":["1615-3871","1860-0794"],"issn-type":[{"type":"print","value":"1615-3871"},{"type":"electronic","value":"1860-0794"}],"subject":[]}}