{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T19:13:44Z","timestamp":1743102824164,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":8,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540880103"},{"type":"electronic","value":"9783540880110"}],"license":[{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008]]},"DOI":"10.1007\/978-3-540-88011-0_20","type":"book-chapter","created":{"date-parts":[[2008,9,20]],"date-time":"2008-09-20T07:34:05Z","timestamp":1221896045000},"page":"156-163","source":"Crossref","is-referenced-by-count":4,"title":["Cooperative Multisite Production Re-scheduling"],"prefix":"10.1007","author":[{"given":"Jaime","family":"Lloret","sequence":"first","affiliation":[]},{"given":"Jose P.","family":"Garcia-Sabater","sequence":"additional","affiliation":[]},{"given":"Juan A.","family":"Marin-Garcia","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"20_CR1","doi-asserted-by":"publisher","first-page":"1224","DOI":"10.1016\/j.ejor.2006.06.068","volume":"187","author":"H.D. Sherali","year":"2008","unstructured":"Sherali, H.D., Van Goubergen, D., Van Landeghem, H.: A Quantitative Approach for Scheduling Activities to Reduce Set-Up in Multiple Machine Lines. European Journal of Operational Research\u00a0187, 1224\u20131237 (2008)","journal-title":"European Journal of Operational Research"},{"key":"20_CR2","doi-asserted-by":"publisher","first-page":"2163","DOI":"10.1016\/j.compchemeng.2005.07.006","volume":"29","author":"R.H. Nystrom","year":"2005","unstructured":"Nystrom, R.H., Franke, R., Harjunkoski, H., Kroll, A.: Production Campaign Planning Including Grade Transition Sequencing And Dynamic Optimization. Computers & Chemical Engineering\u00a029, 2163\u20132179 (2005)","journal-title":"Computers & Chemical Engineering"},{"key":"20_CR3","doi-asserted-by":"publisher","first-page":"727","DOI":"10.1016\/j.eswa.2005.07.032","volume":"30","author":"F.T.S. Chan","year":"2006","unstructured":"Chan, F.T.S., Au, K.C., Chan, P.L.Y.: A Decision Support System For Production Scheduling In An Ion Plating Cell. Expert Systems with Applications\u00a030, 727\u2013738 (2006)","journal-title":"Expert Systems with Applications"},{"key":"20_CR4","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1016\/j.ijpe.2006.02.008","volume":"104","author":"M. Kampf","year":"2006","unstructured":"Kampf, M., Kochel, P.: Simulation-Based Sequencing and lot Size Optimisation for a Production-and-Inventory System with Multiple Items. International Journal of Production Economics\u00a0104, 191\u2013200 (2006)","journal-title":"International Journal of Production Economics"},{"key":"20_CR5","doi-asserted-by":"publisher","first-page":"2291","DOI":"10.1080\/00207540500066762","volume":"43","author":"D. Quadt","year":"2005","unstructured":"Quadt, D., Kuhn, H.: A Conceptual Framework For Lot-Sizing And Scheduling Of Flexible Flow Lines. International Journal of Production Research\u00a043, 2291\u20132308 (2005)","journal-title":"International Journal of Production Research"},{"key":"20_CR6","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/S0925-5273(99)00051-1","volume":"64","author":"O. Moursli","year":"2000","unstructured":"Moursli, O., Pochet, Y.: A Branch-And-Bound Algorithm For The Hybrid Flowshop. International Journal of Production Economics\u00a064, 113\u2013125 (2000)","journal-title":"International Journal of Production Economics"},{"key":"20_CR7","doi-asserted-by":"publisher","first-page":"1184","DOI":"10.1016\/j.ejor.2006.06.067","volume":"187","author":"M. Yokoyama","year":"2008","unstructured":"Yokoyama, M.: Flow-Shop Scheduling with Setup and Assembly Operations. European Journal of Operational Research\u00a0187, 1184\u20131195 (2008)","journal-title":"European Journal of Operational Research"},{"key":"20_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0305-0548(93)90091-V","volume":"20","author":"S.D. Wu","year":"1993","unstructured":"Wu, S.D., Storer, R.H., Pei-Chann, C.: One-Machine Rescheduling Heuristics With Efficiency And Stability As Criteria. Computers & Operations Research\u00a020, 1\u201314 (1993)","journal-title":"Computers & Operations Research"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-88011-0_20","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,5,4]],"date-time":"2024-05-04T04:02:49Z","timestamp":1714795369000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-540-88011-0_20"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008]]},"ISBN":["9783540880103","9783540880110"],"references-count":8,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-88011-0_20","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2008]]}}}