{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:14:09Z","timestamp":1762521249781},"publisher-location":"Berlin, Heidelberg","reference-count":22,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540884385"},{"type":"electronic","value":"9783540884392"}],"license":[{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008]]},"DOI":"10.1007\/978-3-540-88439-2_14","type":"book-chapter","created":{"date-parts":[[2008,10,4]],"date-time":"2008-10-04T09:01:12Z","timestamp":1223110872000},"page":"190-202","source":"Crossref","is-referenced-by-count":14,"title":["A Memetic Algorithm for the Tool Switching Problem"],"prefix":"10.1007","author":[{"given":"Jhon Edgar","family":"Amaya","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carlos","family":"Cotta","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Antonio J.","family":"Fern\u00e1ndez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"4","key":"14_CR1","doi-asserted-by":"publisher","first-page":"382","DOI":"10.1080\/07408178808966195","volume":"20","author":"J.F. Bard","year":"1988","unstructured":"Bard, J.F.: A heuristic for minimizing the number of tool switches on a flexible machine. IIE Transactions\u00a020(4), 382\u2013391 (1988)","journal-title":"IIE Transactions"},{"key":"14_CR2","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1147\/sj.52.0078","volume":"5","author":"L. Belady","year":"1966","unstructured":"Belady, L.: A study of replacement algorithms for virtual storage computers. IBM Systems Journal\u00a05, 78\u2013101 (1966)","journal-title":"IBM Systems Journal"},{"issue":"5","key":"14_CR3","doi-asserted-by":"publisher","first-page":"767","DOI":"10.1287\/opre.36.5.767","volume":"36","author":"C.S. Tang","year":"1988","unstructured":"Tang, C.S., Denardo, E.V.: Models arising from a flexible manufacturing machine, part I: minimization of the number of tool switches. Oper. Res.\u00a036(5), 767\u2013777 (1988)","journal-title":"Oper. Res."},{"issue":"2","key":"14_CR4","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1007\/BF00123680","volume":"6","author":"C. Privault","year":"1995","unstructured":"Privault, C., Finke, G.: Modelling a tool switching problem on a single nc-machine. Journal of Intelligent Manufacturing\u00a06(2), 87\u201394 (1995)","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"15","key":"14_CR5","doi-asserted-by":"publisher","first-page":"3547","DOI":"10.1080\/00207540110060888","volume":"39","author":"R. Shirazi","year":"2001","unstructured":"Shirazi, R., Frizelle, G.: Minimizing the number of tool switches on a flexible machine: an empirical study. International Journal of Production Research\u00a039(15), 3547\u20133560 (2001)","journal-title":"International Journal of Production Research"},{"key":"14_CR6","doi-asserted-by":"crossref","unstructured":"Kashyap, A.S., Khator, S.K.: Modeling of a tool shared flexible manufacturing system. In: WSC 1994: Proceedings of the 26th conference on Winter simulation, San Diego, CA, USA, Society for Computer Simulation International, pp. 986\u2013993 (1994)","DOI":"10.1109\/WSC.1994.717478"},{"key":"14_CR7","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0377-2217(94)90002-7","volume":"76","author":"J. B\u0142a\u017cewicz","year":"1994","unstructured":"B\u0142a\u017cewicz, J., Finke, G.: Scheduling with resource management in manufacturing systems. European Journal of Operational Research\u00a076, 1\u201314 (1994)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"14_CR8","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1109\/70.768181","volume":"15","author":"J. Hong-Bae","year":"1999","unstructured":"Hong-Bae, J., Yeong-Dae, k., Suh, S.H.W.: Heuristics for a tool provisioning problem in a flexiblemanufacturing system with an automatic tool transporter. IEEE Transactions on Robotics and Automation\u00a015(3), 488\u2013496 (1999)","journal-title":"IEEE Transactions on Robotics and Automation"},{"issue":"2","key":"14_CR9","doi-asserted-by":"publisher","first-page":"952","DOI":"10.1016\/j.ejor.2006.07.028","volume":"182","author":"Y. Crama","year":"2007","unstructured":"Crama, Y., Moonen, L.S., Spieksma, F.C., Talloen, E.: The tool switching problem revisited. European Journal of Operational Research\u00a0182(2), 952\u2013957 (2007)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"14_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0278-6125(85)90003-2","volume":"4","author":"H.A. ElMaraghy","year":"1985","unstructured":"ElMaraghy, H.A.: Automated tool management in flexible manufacturing. Journal of Manufacturing Systems\u00a04(1), 1\u201314 (1985)","journal-title":"Journal of Manufacturing Systems"},{"key":"14_CR11","first-page":"52","volume":"20","author":"A. Kiran","year":"1988","unstructured":"Kiran, A., Krason, R.: Automated tooling in a flexible manufacturing system. Industrial Engineering\u00a020, 52\u201357 (1988)","journal-title":"Industrial Engineering"},{"issue":"1-3","key":"14_CR12","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/S0925-5273(99)00055-9","volume":"64","author":"H. Djellab","year":"2000","unstructured":"Djellab, H., Djellab, K., Gourgand, M.: A new heuristic based on a hypergraph representation for the tool switching problem. International Journal of Production Economics\u00a064(1-3), 165\u2013176 (2000)","journal-title":"International Journal of Production Economics"},{"key":"14_CR13","first-page":"689","volume":"30","author":"A. Hertz","year":"1998","unstructured":"Hertz, A., Laporte, G., Mittaz, M., Stecke, K.: Heuristics for minimizing tool switches when scheduling part types on a flexible machine. IIE Transactions\u00a030, 689\u2013694 (1998)","journal-title":"IIE Transactions"},{"issue":"1","key":"14_CR14","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1080\/07408170490257871","volume":"36","author":"G. Laporte","year":"2004","unstructured":"Laporte, G., Salazar-Gonz\u00e1lez, J., Semet, F.: Exact algorithms for the job sequencing and tool switching problem. IIE Transactions\u00a036(1), 37\u201345 (2004)","journal-title":"IIE Transactions"},{"key":"14_CR15","unstructured":"Oerlemans, A.: Production planning for flexible manufacturing systems. Ph.d. dissertation, University of Limburg, Maastricht, Limburg, Netherlands (October 1992)"},{"key":"14_CR16","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1007\/BF01324874","volume":"6","author":"Y. Crama","year":"1994","unstructured":"Crama, Y., Kolen, A., Oerlemans, A., Spieksma, F.: Minimizing the number of tool switches on a flexible machine. International Journal of Flexible Manufacturing Systems\u00a06, 33\u201354 (1994)","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"4","key":"14_CR17","doi-asserted-by":"publisher","first-page":"458","DOI":"10.1016\/j.cie.2004.11.002","volume":"50","author":"K. Salonen","year":"2006","unstructured":"Salonen, K., Raduly-Baka, C., Nevalainen, O.S.: A note on the tool switching problem of a flexible machine. Computers & Industrial Engineering\u00a050(4), 458\u2013465 (2006)","journal-title":"Computers & Industrial Engineering"},{"key":"14_CR18","doi-asserted-by":"publisher","first-page":"319","DOI":"10.1016\/0166-218X(95)00040-X","volume":"65","author":"A. Hertz","year":"1993","unstructured":"Hertz, A., Widmer, M.: An improved tabu search approach for solving the job shop scheduling problem with tooling constraints. Discrete Applied Mathematics\u00a065, 319\u2013345 (1993)","journal-title":"Discrete Applied Mathematics"},{"issue":"1","key":"14_CR19","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1016\/S0360-8352(02)00183-3","volume":"44","author":"M.A. Al-Fawzan","year":"2003","unstructured":"Al-Fawzan, M.A., Al-Sultan, K.S.: A tabu search based algorithm for minimizing the number of tool switches on a flexible machine. Comput. Ind. Eng.\u00a044(1), 35\u201347 (2003)","journal-title":"Comput. Ind. Eng."},{"issue":"9-10","key":"14_CR20","doi-asserted-by":"publisher","first-page":"876","DOI":"10.1007\/s00170-003-1925-2","volume":"25","author":"B.H. Zhou","year":"2005","unstructured":"Zhou, B.H., Xi1, L.F., Cao, Y.S.: A beam-search-based algorithm for the tool switching problem on a flexible machine. The International Journal of Advanced Manufacturing Technology\u00a025(9-10), 876\u2013882 (2005)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"14_CR21","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1080\/07408170490245351","volume":"36","author":"M. Tzur","year":"2004","unstructured":"Tzur, M., Altman, A.: Minimization of tool switches for a flexible manufacturing machine with slot assignment of different tool sizes. IIE Transactions\u00a036(2), 95\u2013110 (2004)","journal-title":"IIE Transactions"},{"key":"14_CR22","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1023\/A:1006529012972","volume":"13","author":"P. Larra\u00f1aga","year":"1999","unstructured":"Larra\u00f1aga, P., Kuijpers, C., Murga, R., Inza, I., Dizdarevic, S.: Genetic algorithms for the travelling salesman problem: A review of representations and operators. Articial Intelligence Review\u00a013, 129\u2013170 (1999)","journal-title":"Articial Intelligence Review"}],"container-title":["Lecture Notes in Computer Science","Hybrid Metaheuristics"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-88439-2_14","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,3,3]],"date-time":"2019-03-03T15:44:56Z","timestamp":1551627896000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-88439-2_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008]]},"ISBN":["9783540884385","9783540884392"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-88439-2_14","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2008]]}}}