{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,2]],"date-time":"2025-02-02T19:10:22Z","timestamp":1738523422084,"version":"3.35.0"},"publisher-location":"Berlin, Heidelberg","reference-count":34,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540894025"},{"type":"electronic","value":"9783540894032"}],"license":[{"start":{"date-parts":[[2008,1,1]],"date-time":"2008-01-01T00:00:00Z","timestamp":1199145600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008]]},"DOI":"10.1007\/978-3-540-89403-2_18","type":"book-chapter","created":{"date-parts":[[2008,11,13]],"date-time":"2008-11-13T04:03:31Z","timestamp":1226549011000},"page":"208-222","source":"Crossref","is-referenced-by-count":1,"title":["Uncertainty in ERP Effort Estimation: A Challenge or an Asset?"],"prefix":"10.1007","author":[{"given":"Maya","family":"Daneva","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Seanna","family":"Wettflower","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sonia","family":"de Boer","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"18_CR1","unstructured":"Arnesen, S., Thompson, J.: How to Budget for Enterprise Software, Strategic Finance, pp. 43\u201347 (January 2005)"},{"key":"18_CR2","doi-asserted-by":"crossref","unstructured":"Bardhan, I., Bafgci, S., Sougstad, R.: A Real Options Approach for Prioritization of a Portfolio of Information Technology Projects: a Case Study of a Utility Company. In: Proc. of the 37th Hawaii Int\u2019l Conf. on Systems Sciences (2004)","DOI":"10.1109\/HICSS.2004.1265499"},{"key":"18_CR3","unstructured":"Benchmarking Partners, A Status Report on ERP Implementation, USA (2007)"},{"key":"18_CR4","volume-title":"Software Cost Estimation with COCOMO II","author":"B. Boehm","year":"2000","unstructured":"Boehm, B.: Software Cost Estimation with COCOMO II. Prentice Hall, Upper Saddle River (2000)"},{"key":"18_CR5","doi-asserted-by":"crossref","unstructured":"Chulani, S., Boehm, B., Steece, B.: Bayesian Analysis of Empirical Software Engineering Cost Models. IEEE Trans on SE\u00a025(4), 573\u2013583","DOI":"10.1109\/32.799958"},{"key":"18_CR6","series-title":"Lecture Notes in Computer Science","volume-title":"Int\u2019l Conference on Software Process and Product Improvement, Frascati","author":"M. Daneva","year":"2008","unstructured":"Daneva, M.: Managing Uncertainty in ERP Effort Estimation Practice: an Industrial Case Study. In: Int\u2019l Conference on Software Process and Product Improvement, Frascati. LNCS. Springer, Heidelberg (2008)"},{"key":"18_CR7","doi-asserted-by":"publisher","first-page":"500","DOI":"10.1109\/ESEM.2007.72","volume-title":"Int\u2019. Symposium on Empirical Software Engineering and Measurement (ESEM)","author":"Daneva","year":"2007","unstructured":"Daneva: Approaching the ERP Project Cost Estimation Problem: an Experiment. In: Int\u2019. Symposium on Empirical Software Engineering and Measurement (ESEM), p. 500. IEEE Computer Society Press, Los Alamitos (2007)"},{"key":"18_CR8","volume-title":"Proc. of Symposium on Software Reuse","author":"M. Daneva","year":"1999","unstructured":"Daneva, M.: Measuring Reuse of SAP Requirements: a Model-based Approach. In: Proc. of Symposium on Software Reuse. ACM Press, NY (1999)"},{"key":"18_CR9","doi-asserted-by":"crossref","unstructured":"Daneva, M., Wieringa, R.J.: Cost Estimation for Cross-organizational ERP Projects: Research Perspectives. Journal of Software Quality (2008)","DOI":"10.1007\/s11219-008-9045-8"},{"key":"18_CR10","unstructured":"Fenton, N.E., Pfleeger, S.L.: Software Metrics: A Rigorous and Practical Approach, 2nd edn. PWS Publishing (1998)"},{"key":"18_CR11","first-page":"325","volume-title":"Proc. of METRICS 2003","author":"R.M. Fewster","year":"2003","unstructured":"Fewster, R.M., Mendes, E.: Portfolio Management Method for Deadline Planning. In: Proc. of METRICS 2003, pp. 325\u2013336. IEEE, Los Alamitos (2003)"},{"key":"18_CR12","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1080\/02683960010035943","volume":"16","author":"C. Francalanci","year":"2003","unstructured":"Francalanci, C.: Predicting the implementation effort of ERP projects: empirical evidence on SAP R\/3. Journal of Information Technology\u00a016, 33\u201348 (2003)","journal-title":"Journal of Information Technology"},{"key":"18_CR13","volume-title":"Probability Methods for Cost Uncertainty Analysis\u2014A Systems Engineering Perspective","author":"P.R. Garvey","year":"2000","unstructured":"Garvey, P.R.: Probability Methods for Cost Uncertainty Analysis\u2014A Systems Engineering Perspective. Marcel Dekker Publ., New York (2000)"},{"key":"18_CR14","doi-asserted-by":"crossref","unstructured":"Gruschke, T.M., J\u00f8rgensen, M.: Assessing Uncertainty of Software Development Effort Estimates: Learning from Outcome Feedback. In: ACM Transactions on Software Engineering and Methodology (accepted, 2008)","DOI":"10.1145\/13487689.13487693"},{"key":"18_CR15","unstructured":"Gupta, S., et al.: Considerations in Cost Risk Analysis: How the IC CAIG Handles Risk. In: SCEA 2002 National Conference, June 14 (2002)"},{"key":"18_CR16","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"1402","DOI":"10.1007\/11915072_44","volume-title":"On the Move to Meaningful Internet Systems 2006: OTM 2006 Workshops","author":"T. Hansen","year":"2006","unstructured":"Hansen, T.: Multidimensional Effort Prediction for ERP System Implementation. In: Meersman, R., Tari, Z., Herrero, P. (eds.) OTM 2006 Workshops. LNCS, vol.\u00a04278, pp. 1402\u20131408. Springer, Heidelberg (2006)"},{"key":"18_CR17","doi-asserted-by":"crossref","unstructured":"Jiamthubthugsin, W., Sutivong, D.: Protfolio Management of Software Development Projects Using COCOMO II. In: Proc. of ICSE 2006, pp. 889\u2013892 (2006)","DOI":"10.1145\/1134285.1134443"},{"issue":"6","key":"18_CR18","doi-asserted-by":"publisher","first-page":"542","DOI":"10.1109\/TSE.2003.1205181","volume":"29","author":"B.A. Kitchenham","year":"2003","unstructured":"Kitchenham, B.A., Pickard, L., Linkman, S., Jones, P.: Modelling Software Bidding Risks. IEEE Transactions on Software Engineering\u00a029(6), 542\u2013554 (2003)","journal-title":"IEEE Transactions on Software Engineering"},{"key":"18_CR19","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1007\/1-4020-5634-6_11","volume-title":"Technologies for Business Information Systems","author":"S. Koch","year":"2007","unstructured":"Koch, S.: ERP Implementation Effort Estimation Using Data Envelopment Analysis. In: Abramowicz, W., Mayr, H.C. (eds.) Technologies for Business Information Systems, pp. 121\u2013132. Springer, Dordrecht (2007)"},{"issue":"3","key":"18_CR20","doi-asserted-by":"publisher","first-page":"322","DOI":"10.1109\/TEM.2004.830862","volume":"5","author":"W. Luo","year":"2004","unstructured":"Luo, W., Strong, D.M.: A Framework for Evaluating ERP Implementation Choices. IEEE Transactions on Engineering Management\u00a05(3), 322\u2013333 (2004)","journal-title":"IEEE Transactions on Engineering Management"},{"key":"18_CR21","unstructured":"McDonald, P., Giles, S., Strickland, D.: Extensions of Auto-Generated Code and NOSTROMO Methodologies. In: Proc. of 19th Int. Forum on COCOMO, Los Angeles, CA,"},{"issue":"3","key":"18_CR22","doi-asserted-by":"publisher","first-page":"52","DOI":"10.4018\/jeis.2007070104","volume":"3","author":"S. Parthasarathy","year":"2007","unstructured":"Parthasarathy, S., Anbazhagan, N.: Evaluation ERP Implementation Choices Using AHP. International Journal of Enterprise Information Systems\u00a03(3), 52\u201365 (2007)","journal-title":"International Journal of Enterprise Information Systems"},{"key":"18_CR23","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ijpe.2007.02.044","volume":"113","author":"M. Plaza","year":"2008","unstructured":"Plaza, M., Rohlf, K.: Learning and Performance in ERP Implementation Projects: a Learning-curve Model for Analyzing and Managing Consulting Costs. Journal of Production Economics\u00a0113, 1\u201314 (2008)","journal-title":"Journal of Production Economics"},{"issue":"1","key":"18_CR24","first-page":"21","volume":"49","author":"C. Rettig","year":"2007","unstructured":"Rettig, C.: The Trouble with Enterprise Systems. Sloan Management Review\u00a049(1), 21\u201327 Fall (2007)","journal-title":"Sloan Management Review"},{"key":"18_CR25","doi-asserted-by":"publisher","first-page":"729","DOI":"10.1016\/S0378-7206(02)00099-X","volume":"40","author":"I. Stamelos","year":"2003","unstructured":"Stamelos, I., Angelis, L., Morosio, M., Sakellaris, E., Bleris, G.: Estimating the Development Cost of Custom Software. Information & Management\u00a040, 729\u2013741 (2003)","journal-title":"Information & Management"},{"issue":"7","key":"18_CR26","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1016\/S0950-5849(01)00147-1","volume":"43","author":"E. Stensrud","year":"2001","unstructured":"Stensrud, E.: Alternative Approaches to Effort Prediction of ERP Projects. Inf. & Soft. Techn.\u00a043(7), 413\u2013423 (2001)","journal-title":"Inf. & Soft. Techn."},{"issue":"5","key":"18_CR27","doi-asserted-by":"publisher","first-page":"398","DOI":"10.1109\/TSE.2003.1199070","volume":"29","author":"E. Stensrud","year":"2003","unstructured":"Stensrud, E., Myrtveit, I.: Identifying High Performance ERP Projects. IEEE Trans. Software Engineering\u00a029(5), 398\u2013416 (2003)","journal-title":"IEEE Trans. Software Engineering"},{"key":"18_CR28","doi-asserted-by":"crossref","unstructured":"Summer, M.: Risk Factors in Enterprise Wide Information Systems Projects. In: Special Interest Group on Computer Personnel Research Annual Conference Chicago, Illinois, pp. 180\u2013187","DOI":"10.1145\/333334.333392"},{"issue":"2","key":"18_CR29","doi-asserted-by":"publisher","first-page":"227","DOI":"10.2307\/3250937","volume":"24","author":"A. Taudes","year":"2000","unstructured":"Taudes, A., Feurstein, M., Mild, A.: Options Analysis of Software Platform Decisions: a Case Study. MIS Quarterly\u00a024(2), 227\u2013243 (2000)","journal-title":"MIS Quarterly"},{"key":"18_CR30","unstructured":"Valerdi, R.: The Constructive Systems Engineering Cost Model (COSYSMO), Ph.D Dissertation, University of Southern California, Los Angeles, USA (May 2005)"},{"issue":"1","key":"18_CR31","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0167-6423(02)00106-5","volume":"45","author":"C. Verhoef","year":"2002","unstructured":"Verhoef, C.: Quantitative IT Portfolio Management. Science of Computer Programming\u00a045(1), 1\u201396 (2002)","journal-title":"Science of Computer Programming"},{"key":"18_CR32","unstructured":"Wieringa, R.: Requirements Engineering Research Methodology: Principles and Practice. In: Tutorial at the Int\u2019l Conference on Requirements Engineering (RE 2008), Spain (2008)"},{"key":"18_CR33","doi-asserted-by":"crossref","unstructured":"Wohlin, C.: Experimentation in Software Engineering. Springer (2000)","DOI":"10.1007\/978-1-4615-4625-2"},{"key":"18_CR34","volume-title":"Case Study Research, Design and Methods","author":"R. Yin","year":"2002","unstructured":"Yin, R.: Case Study Research, Design and Methods, 3rd edn. Sage Publications, Newbury Park (2002)","edition":"3"}],"container-title":["Lecture Notes in Computer Science","Software Process and Product Measurement"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-540-89403-2_18","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,2]],"date-time":"2025-02-02T18:34:54Z","timestamp":1738521294000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-540-89403-2_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008]]},"ISBN":["9783540894025","9783540894032"],"references-count":34,"URL":"https:\/\/doi.org\/10.1007\/978-3-540-89403-2_18","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2008]]}}}