{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,23]],"date-time":"2026-02-23T17:15:17Z","timestamp":1771866917617,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":45,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642010088","type":"print"},{"value":"9783642010095","type":"electronic"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-01009-5_8","type":"book-chapter","created":{"date-parts":[[2009,4,9]],"date-time":"2009-04-09T09:34:14Z","timestamp":1239269654000},"page":"85-96","source":"Crossref","is-referenced-by-count":21,"title":["An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Vincent","family":"Van Peteghem","sequence":"first","affiliation":[]},{"given":"Mario","family":"Vanhoucke","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"8_CR1","doi-asserted-by":"publisher","first-page":"1259","DOI":"10.1016\/j.cor.2004.09.016","volume":"33","author":"M.M. Akbar","year":"2006","unstructured":"Akbar, M.M., Rahman, M.S., Kaykobad, M., Manning, E.G., Shoja, G.C.: Solving the Multidimensional Multiple-Choice Knapsack Problem by constructing convex hulls. Computers and Operations Research\u00a033, 1259\u20131273 (2006)","journal-title":"Computers and Operations Research"},{"key":"8_CR2","doi-asserted-by":"publisher","first-page":"614","DOI":"10.1057\/palgrave.jors.2601563","volume":"54","author":"J. Alcaraz","year":"2003","unstructured":"Alcaraz, J., Maroto, C., Ruiz, R.: Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society\u00a054, 614\u2013626 (2003)","journal-title":"Journal of the Operational Research Society"},{"key":"8_CR3","first-page":"113","volume-title":"Advances in Project Scheduling","author":"R. Alvarez-Valdes","year":"1989","unstructured":"Alvarez-Valdes, R., Tamarit, J.M.: Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., Weglarz, J. (eds.) Advances in Project Scheduling, pp. 113\u2013134. Elsevier, Amsterdam (1989)"},{"key":"8_CR4","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1287\/ijoc.6.2.161","volume":"6","author":"E.J. Anderson","year":"1994","unstructured":"Anderson, E.J., Ferris, M.C.: Genetic Algorithm for Combinatorial Optimisation: The Assembly Line Balancing Problem. ORSA Journal on Computing\u00a06, 161\u2013173 (1994)","journal-title":"ORSA Journal on Computing"},{"key":"8_CR5","doi-asserted-by":"publisher","first-page":"584","DOI":"10.1007\/s00170-006-0631-2","volume":"34","author":"R. Argawal","year":"2007","unstructured":"Argawal, R., Tiwari, M.K., Mukherjee, S.K.: Artificial Immune System Based Approach for Solving Resource Constraint Project Scheduling Problem. International Journal of Advanced Manufacturing Technology\u00a034, 584\u2013593 (2007)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"8_CR6","doi-asserted-by":"publisher","first-page":"2547","DOI":"10.1080\/00207549308956882","volume":"31","author":"F. Boctor","year":"1993","unstructured":"Boctor, F.: Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research\u00a031, 2547\u20132558 (1993)","journal-title":"International Journal of Production Research"},{"key":"8_CR7","doi-asserted-by":"publisher","first-page":"2335","DOI":"10.1080\/00207549608905028","volume":"34","author":"F. Boctor","year":"1996","unstructured":"Boctor, F.: An adaption of the simulated annealing for solving resource-constrained project scheduling problems. International Journal of Production Research\u00a034, 2335\u20132351 (1996)","journal-title":"International Journal of Production Research"},{"key":"8_CR8","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1016\/0377-2217(95)00359-2","volume":"90","author":"F. Boctor","year":"1996","unstructured":"Boctor, F.: A new and effcient heuristic for scheduling projects with resource restrictions and multiple execution modes. European Journal of Operational Research\u00a090, 349\u2013361 (1996)","journal-title":"European Journal of Operational Research"},{"key":"8_CR9","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K. Bouleimen","year":"2003","unstructured":"Bouleimen, K., Lecocq, H.: A new effcient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research\u00a0149, 268\u2013281 (2003)","journal-title":"European Journal of Operational Research"},{"key":"8_CR10","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/978-3-540-45192-1_1","volume-title":"Artificial Immune Systems","author":"C.A. Coello Coello","year":"2003","unstructured":"Coello Coello, C.A., Rivera, D.C., Cort\u00e9s, N.C.: Use of an Artificial Immune System for Job Shop Scheduling. In: Timmis, J., Bentley, P.J., Hart, E. (eds.) ICARIS 2003. LNCS, vol.\u00a02787, pp. 1\u201310. Springer, Heidelberg (2003)"},{"key":"8_CR11","doi-asserted-by":"publisher","first-page":"944","DOI":"10.1287\/mnsc.21.8.944","volume":"21","author":"E.W. Davis","year":"1975","unstructured":"Davis, E.W., Patterson, J.H.: A comparison of heurstic and optimum solutions in resource-constrained project scheduling. Management Science\u00a021, 944\u2013955 (1975)","journal-title":"Management Science"},{"key":"8_CR12","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1007\/11424925_41","volume-title":"Computational Science and Its Applications \u2013 ICCSA 2005","author":"D. Debels","year":"2005","unstructured":"Debels, D., Vanhoucke, M.: A bi-population based genetic algorithm for the resource-constrained project scheduling problem. In: Gervasi, O., Gavrilova, M.L., Kumar, V., Lagan\u00e1, A., Lee, H.P., Mun, Y., Taniar, D., Tan, C.J.K. (eds.) ICCSA 2005. LNCS, vol.\u00a03483, pp. 378\u2013387. Springer, Heidelberg (2005)"},{"key":"8_CR13","unstructured":"De Castro, L.N., Timmis, J.I.: Artificial immune systems: a novel paradigm for pattern recognition. In: Alonso, L., Corchado, J., Fyfe, C. (eds.) Artificial Neural Networks in Pattern Recognition, pp. 67\u201384. University of Paisley (2002)"},{"key":"8_CR14","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1080\/07408179308964317","volume":"25","author":"A. Drexl","year":"1993","unstructured":"Drexl, A., Gr\u00fcnewald, J.: Nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions\u00a025, 74\u201381 (1993)","journal-title":"IIE Transactions"},{"key":"8_CR15","doi-asserted-by":"publisher","first-page":"1083","DOI":"10.1016\/j.future.2004.03.014","volume":"20","author":"O. Engin","year":"2004","unstructured":"Engin, O., D\u00f6yen, A.: A New Approach to Solve Hybrid Flow Shop Scheduling Problems by Artificial Immune System. Future Generation Computer Systems\u00a020, 1083\u20131095 (2004)","journal-title":"Future Generation Computer Systems"},{"key":"8_CR16","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1177\/003754970107600201","volume":"76","author":"Z.W. Geem","year":"2001","unstructured":"Geem, Z.W., Kim, J.H., Loganathan, G.V.: A New Heuristic Optimization Algorithm: Harmony Search. Simulation\u00a076, 60\u201368 (2001)","journal-title":"Simulation"},{"key":"8_CR17","doi-asserted-by":"crossref","unstructured":"Hart, E., Ross, P., Nelson, J.: Producing robust schedules via an artificial immune system. In: Proceedings of the ICEC 1998, pp. 464\u2013469 (1998)","DOI":"10.1109\/ICEC.1998.699852"},{"key":"8_CR18","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1002\/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I","volume":"32","author":"S. Hartmann","year":"1998","unstructured":"Hartmann, S., Drexl, A.: Project scheduling with multiple modes: a comparison of exact algorithms. Networks\u00a032, 283\u2013297 (1998)","journal-title":"Networks"},{"key":"8_CR19","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1023\/A:1010902015091","volume":"102","author":"S. Hartmann","year":"2001","unstructured":"Hartmann, S.: Project scheduling with multiple modes: a genetic algorithm. Annals of Operations Research\u00a0102, 111\u2013135 (2001)","journal-title":"Annals of Operations Research"},{"key":"8_CR20","doi-asserted-by":"publisher","first-page":"1323","DOI":"10.1057\/palgrave.jors.2601796","volume":"55","author":"M. Hifi","year":"2004","unstructured":"Hifi, M., Michrafy, M., Sbihi, A.: Heuristic algorithms for the multiple-choice multidimensional knapsack problem. Journal of Operational Research Society\u00a055, 1323\u20131332 (2004)","journal-title":"Journal of Operational Research Society"},{"key":"8_CR21","doi-asserted-by":"publisher","first-page":"299","DOI":"10.1016\/j.amc.2007.04.096","volume":"195","author":"B. Jarboui","year":"2008","unstructured":"Jarboui, B., Damak, N., Siarry, P., Rebai, A.: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation\u00a0195, 299\u2013308 (2008)","journal-title":"Applied Mathematics and Computation"},{"key":"8_CR22","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1023\/A:1010954031930","volume":"102","author":"J. Jozefowska","year":"2001","unstructured":"Jozefowska, J., Mika, M., Rozycki, R., Waligora, G., Weglarz, J.: Simulated annealing for multi-mode resource-constrained project scheduling. Annals of Operations Research\u00a0102, 137\u2013155 (2001)","journal-title":"Annals of Operations Research"},{"key":"8_CR23","first-page":"387","volume":"32","author":"G. Knotts","year":"2000","unstructured":"Knotts, G., Dror, M., Hartman, B.: Agent-based project scheduling. IIE Transactions\u00a032, 387\u2013401 (2000)","journal-title":"IIE Transactions"},{"key":"8_CR24","doi-asserted-by":"publisher","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., Drexl, A.: Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science\u00a041, 1693\u20131703 (1995)","journal-title":"Management Science"},{"key":"8_CR25","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R., Sprecher, A.: PSPLIB - a project scheduling problem library. European Journal of Operational Research\u00a096, 205\u2013216 (1996)","journal-title":"European Journal of Operational Research"},{"key":"8_CR26","doi-asserted-by":"publisher","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","volume":"90","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R.: Serial and parallel resourceconstrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research\u00a090, 320\u2013333 (1996)","journal-title":"European Journal of Operational Research"},{"key":"8_CR27","first-page":"987","volume":"29","author":"R. Kolisch","year":"1997","unstructured":"Kolisch, R., Drexl, A.: Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions\u00a029, 987\u2013999 (1997)","journal-title":"IIE Transactions"},{"key":"8_CR28","volume-title":"Project Scheduling - Recent Models, Algorithms and Applications","author":"R. Kolisch","year":"1999","unstructured":"Kolisch, R., Hartmann, S.: Project Scheduling - Recent Models, Algorithms and Applications. Kluwer Academic Publishers, Boston (1999)"},{"key":"8_CR29","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R. Kolisch","year":"2006","unstructured":"Kolisch, R., Hartmann, S.: Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research\u00a0174, 23\u201337 (2006)","journal-title":"European Journal of Operational Research"},{"key":"8_CR30","first-page":"69","volume":"30","author":"A. Lova","year":"2006","unstructured":"Lova, A., Tormos, P., Barber, F.: Multi-mode resource-constrained project scheduling: Scheduling schemes, priority rules and mode selection rules. Inteligencia Artificial\u00a030, 69\u201386 (2006)","journal-title":"Inteligencia Artificial"},{"key":"8_CR31","doi-asserted-by":"publisher","first-page":"134","DOI":"10.1016\/S0377-2217(96)00180-4","volume":"100","author":"M. Mori","year":"1997","unstructured":"Mori, M., Tseng, C.: A genetic algorithm for multi-mode resource-constrained project scheduling problem. European Journal of Operational Research\u00a0100, 134\u2013141 (1997)","journal-title":"European Journal of Operational Research"},{"key":"8_CR32","doi-asserted-by":"crossref","unstructured":"Nonobe, K., Ibaraki, T.: Formulation and tabu search algorithm for the resourceconstrained project scheduling problem (RCPSP). Technical report, Kyoto University (2001)","DOI":"10.1007\/978-1-4615-1507-4_25"},{"key":"8_CR33","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/0377-2217(94)90359-X","volume":"79","author":"L. \u00d6zdamar","year":"1994","unstructured":"\u00d6zdamar, L., Ulusoy, G.: A local constraint based analysis approach to project scheduling under general resource constraints. European Journal of Operational Research\u00a079, 287\u2013298 (1994)","journal-title":"European Journal of Operational Research"},{"key":"8_CR34","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1109\/5326.740669","volume":"29","author":"L. \u00d6zdamar","year":"1999","unstructured":"\u00d6zdamar, L.: A genetic algorithm approach to a general category project scheduling problem. IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews\u00a029, 44\u201359 (1999)","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews"},{"key":"8_CR35","volume-title":"Advances in Project Scheduling","author":"J. Patterson","year":"1989","unstructured":"Patterson, J., Slowinski, R., Talbot, F., Weglarz, J.: Advances in Project Scheduling. Elsevier, Amsterdam (1989)"},{"key":"8_CR36","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1016\/j.ejor.2007.10.042","volume":"193","author":"M. Ranjbar","year":"2009","unstructured":"Ranjbar, M., De Reyck, B., Kianfar, F.: A hybrid scatter-search for the discrete time\/resource trade-off problem in project scheduling. European Journal of Operational Research\u00a0193, 35\u201348 (2009)","journal-title":"European Journal of Operational Research"},{"key":"8_CR37","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1007\/s10878-006-9035-3","volume":"13","author":"A. Sbihi","year":"2007","unstructured":"Sbihi, A.: A best first search exact algorithm for the Multiple-choice Multidimensional Knapsack Problem. Journal of Combinatorial Optimization\u00a013, 337\u2013351 (2007)","journal-title":"Journal of Combinatorial Optimization"},{"key":"8_CR38","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1007\/s11227-007-0144-2","volume":"43","author":"A.Z.M. Shahriar","year":"2008","unstructured":"Shahriar, A.Z.M., Akbar, M.M., Rahman, M.S., Newton, M.A.H.: A multiprocessor based heuristic for multi-dimensional multiple-choice knapsack problem. Journal of supercomputing\u00a043, 257\u2013280 (2008)","journal-title":"Journal of supercomputing"},{"key":"8_CR39","doi-asserted-by":"publisher","first-page":"220","DOI":"10.1016\/0377-2217(94)90353-0","volume":"79","author":"R. Slowinski","year":"1994","unstructured":"Slowinski, R., Soniewicki, B., Weglarz, J.: DSS for multiobjective project scheduling. European Journal of Operational Research\u00a079, 220\u2013229 (1994)","journal-title":"European Journal of Operational Research"},{"key":"8_CR40","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1007\/BF01545587","volume":"19","author":"A. Sprecher","year":"1997","unstructured":"Sprecher, A., Hartmann, S., Drexl, A.: An exact algorithm for project scheduling with multiple modes. OR Spektrum\u00a019, 195\u2013203 (1997)","journal-title":"OR Spektrum"},{"key":"8_CR41","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1016\/S0377-2217(97)00348-2","volume":"107","author":"A. Sprecher","year":"1998","unstructured":"Sprecher, A., Drexl, A.: Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm. European Journal of Operational Research\u00a0107, 431\u2013450 (1998)","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"8_CR42","doi-asserted-by":"publisher","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"F. Talbot","year":"1982","unstructured":"Talbot, F.: Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science\u00a028(10), 1197\u20131210 (1982)","journal-title":"Management Science"},{"key":"8_CR43","doi-asserted-by":"publisher","first-page":"511","DOI":"10.1016\/j.ejor.2007.03.032","volume":"187","author":"M. Vanhoucke","year":"2008","unstructured":"Vanhoucke, M., Coelho, J., Debels, D., Maenhout, B., Tavares, L.: An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research\u00a0187, 511\u2013524 (2008)","journal-title":"European Journal of Operational Research"},{"key":"8_CR44","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1111\/j.1467-8667.2005.00420.x","volume":"21","author":"H. Zhang","year":"2006","unstructured":"Zhang, H., Tam, C., Li, H.: Multimode project scheduling based on particle swarm optimization. Computer-Aided Civil and Infrastructure Engineering\u00a021, 93\u2013103 (2006)","journal-title":"Computer-Aided Civil and Infrastructure Engineering"},{"key":"8_CR45","first-page":"377","volume":"18","author":"G. Zhu","year":"2006","unstructured":"Zhu, G., Bard, J., Tu, G.: A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem. Journal on Computing\u00a018, 377\u2013390 (2006)","journal-title":"Journal on Computing"}],"container-title":["Lecture Notes in Computer Science","Evolutionary Computation in Combinatorial Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-01009-5_8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,19]],"date-time":"2019-05-19T07:41:58Z","timestamp":1558251718000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-01009-5_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642010088","9783642010095"],"references-count":45,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-01009-5_8","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009]]}}}