{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T12:56:43Z","timestamp":1725541003846},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642012150"},{"type":"electronic","value":"9783642012167"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-01216-7_65","type":"book-chapter","created":{"date-parts":[[2009,11,18]],"date-time":"2009-11-18T15:32:19Z","timestamp":1258558339000},"page":"613-622","source":"Crossref","is-referenced-by-count":1,"title":["MES Scheduling Optimization and Simulation Based on CAPP\/PPC Integration"],"prefix":"10.1007","author":[{"given":"Yan","family":"Cao","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ning","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lina","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yanli","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"65_CR1","doi-asserted-by":"publisher","first-page":"98","DOI":"10.3901\/JME.2005.09.098","volume":"41","author":"X.D. Zhang","year":"2005","unstructured":"Zhang, X.D., Yan, H.S.: Integrated Optimization of Production Planning and Scheduling for Multi-Stage Workshop. Chinese Journal of Mechanical Engineering\u00a041, 98\u2013105 (2005)","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"65_CR2","doi-asserted-by":"publisher","first-page":"319","DOI":"10.1142\/S0219686708001413","volume":"7","author":"Y. He","year":"2008","unstructured":"He, Y., Liu, F., Shi, J.L.: A Framework of Scheduling Models in Machining Workshop for Green Manufacturing. Journal of Advanced Manufacturing Systems\u00a07, 319\u2013322 (2008)","journal-title":"Journal of Advanced Manufacturing Systems"},{"key":"65_CR3","first-page":"44","volume":"36","author":"Y. Wei","year":"2008","unstructured":"Wei, Y., Li, D.B., Yuan, M.H.: Research on Manufacturing Execution System for Agile Assembling Resource Reconfiguration Based on Agent. Machine Tool & Hydraulics\u00a036, 44\u201347, 52 (2008)","journal-title":"Machine Tool & Hydraulics"},{"key":"65_CR4","first-page":"737","volume":"14","author":"Q.F. Wang","year":"2008","unstructured":"Wang, Q.F., Liu, F., Huang, H.L.: Service-Oriented Reconfigurable Manufacturing Execution System for Discrete Workshop. Computer Integrated Manufacturing Systems\u00a014, 737\u2013743 (2008)","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"65_CR5","first-page":"244","volume":"26","author":"Y. Pan","year":"2009","unstructured":"Pan, Y., Zhang, W.X.: Research on Multi-Agent-Based MES Structure of Discrete Manufacturing Industry. Application Research of Computers\u00a026, 244\u2013246, 249 (2009)","journal-title":"Application Research of Computers"},{"key":"65_CR6","first-page":"490","volume":"13","author":"Z.L. Cheng","year":"2007","unstructured":"Cheng, Z.L., Fan, Y.Q.: Design of component-based flexible MES in metallurgical industry. Computer Integrated Manufacturing Systems\u00a013, 490\u2013496 (2007)","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"65_CR7","first-page":"105","volume":"12","author":"W.K. Zhou","year":"2005","unstructured":"Zhou, W.K., Zhu, J.Y.: Application of Workflow Technology for Workshop Scheduling. Journal of Harbin Institute of Technology (New Series)\u00a012, 105\u2013110 (2005)","journal-title":"Journal of Harbin Institute of Technology (New Series)"},{"key":"65_CR8","first-page":"730","volume":"32","author":"H.Y. Chu","year":"2006","unstructured":"Chu, H.Y., Cao, Q.J., Fei, R.Y.: Production Scheduling Research for Workshop Based on Manufacturing Cell. Journal of Beijing University of Technology\u00a032, 730\u2013736 (2006)","journal-title":"Journal of Beijing University of Technology"},{"key":"65_CR9","first-page":"1164","volume":"30","author":"M. Liu","year":"2007","unstructured":"Liu, M., Yan, J.W.: An Adaptively Annealing Genetic Algorithm Based Scheduling Method of Workshop Daily Operating Planning. Chinese Journal of Computers\u00a030, 1164\u20131172 (2007)","journal-title":"Chinese Journal of Computers"},{"key":"65_CR10","first-page":"991","volume":"14","author":"X.Y. Yu","year":"2008","unstructured":"Yu, X.Y., Sun, S.D., Chu, W.: Parallel Cooperative Evolutionary Genetic Algorithm for Multi-Workshop Planning and Scheduling Problems. Computer Integrated Manufacturing Systems\u00a014, 991\u20131000 (2008)","journal-title":"Computer Integrated Manufacturing Systems"}],"container-title":["Advances in Soft Computing","The Sixth International Symposium on Neural Networks (ISNN 2009)"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-01216-7_65.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T05:59:26Z","timestamp":1619762366000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-01216-7_65"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642012150","9783642012167"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-01216-7_65","relation":{},"ISSN":["1867-5662","1867-5670"],"issn-type":[{"type":"print","value":"1867-5662"},{"type":"electronic","value":"1867-5670"}],"subject":[],"published":{"date-parts":[[2009]]}}}