{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,12]],"date-time":"2026-03-12T12:38:07Z","timestamp":1773319087595,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":17,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642015090","type":"print"},{"value":"9783642015106","type":"electronic"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-01510-6_8","type":"book-chapter","created":{"date-parts":[[2009,5,20]],"date-time":"2009-05-20T07:38:37Z","timestamp":1242805117000},"page":"60-69","source":"Crossref","is-referenced-by-count":9,"title":["Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times"],"prefix":"10.1007","author":[{"given":"Wei","family":"Huang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lixin","family":"Ding","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bin","family":"Wen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Buqing","family":"Cao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"8_CR1","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1109\/52.805479","volume":"16","author":"C.K. Chang","year":"1999","unstructured":"Chang, C.K., Christensen, M.: A Net Practice for Software Project Management. IEEE Software\u00a016, 80\u201389 (1999)","journal-title":"IEEE Software"},{"key":"8_CR2","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1287\/opre.9.3.296","volume":"9","author":"J.E. Kelley Jr.","year":"1961","unstructured":"Kelley Jr., J.E.: Critical Path Planning and Scheduling, Mathematical Basis. Operations Research\u00a09, 296\u2013320 (1961)","journal-title":"Operations Research"},{"key":"8_CR3","volume-title":"Industrial Scheduling","author":"J.E. Kelley Jr.","year":"1963","unstructured":"Kelley Jr., J.E.: The Critical Path Method: Resources Planning and Scheduling. In: Thompson, G.L., Muth, J.F. (eds.) Industrial Scheduling. Prentice-Hall, Englewood Cliffs (1963)"},{"key":"8_CR4","first-page":"76","volume":"13","author":"A.R. Burgess","year":"1962","unstructured":"Burgess, A.R., Killebrew, J.B.: Variation in Activity Level on a Cyclical Arrow Diagram. Journal of Industrial Engineering\u00a013, 76\u201383 (1962)","journal-title":"Journal of Industrial Engineering"},{"key":"8_CR5","doi-asserted-by":"publisher","first-page":"1590","DOI":"10.1287\/mnsc.41.10.1590","volume":"41","author":"E. Demeulemeester","year":"1995","unstructured":"Demeulemeester, E.: Minimizing Resource Availability Costs in Time-limited Project Networks. Management Science\u00a041, 1590\u20131598 (1995)","journal-title":"Management Science"},{"key":"8_CR6","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1287\/opre.32.1.89","volume":"32","author":"R.H. Mohring","year":"1984","unstructured":"Mohring, R.H.: Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion time. Operations Research\u00a032, 89\u2013120 (1984)","journal-title":"Operations Research"},{"key":"8_CR7","doi-asserted-by":"publisher","first-page":"670","DOI":"10.1016\/j.autcon.2007.11.004","volume":"17","author":"M. Lu","year":"2008","unstructured":"Lu, M., Lam, H.C., Dai, F.: Resource-constrained Critical Path Analysis based on discrete event Simulation and Particle Swarm Optimization. Automation in Construction\u00a017, 670\u2013681 (2008)","journal-title":"Automation in Construction"},{"key":"8_CR8","doi-asserted-by":"publisher","first-page":"966","DOI":"10.1016\/j.autcon.2008.04.006","volume":"17","author":"S.S. Liu","year":"2008","unstructured":"Liu, S.S., Wang, C.J.: Resource-constrained Construction Project Scheduling Model for Profit Maximization Considering Cash Flow. Automation in Construction\u00a017, 966\u2013974 (2008)","journal-title":"Automation in Construction"},{"key":"8_CR9","doi-asserted-by":"publisher","first-page":"1280","DOI":"10.1109\/TSE.1989.559781","volume":"15","author":"L.C. Liu","year":"1989","unstructured":"Liu, L.C., Horowitz, E.: A Formal Model for Software Project Management. IEEE Trans.Software Eng.\u00a015, 1280\u20131293 (1989)","journal-title":"IEEE Trans.Software Eng."},{"key":"8_CR10","volume-title":"Software Engineering. A Hollstic View","author":"B.I. Blum","year":"1992","unstructured":"Blum, B.I.: Software Engineering. A Hollstic View. Oxford UnivePress, New York (1992)"},{"key":"8_CR11","doi-asserted-by":"publisher","first-page":"1142","DOI":"10.1016\/j.infsof.2008.03.002","volume":"11","author":"C.K. Chang","year":"2008","unstructured":"Chang, C.K., Jiang, H., Di, Y., Zhu, D., Ge, Y.: Time-line Based Model for Software Project Scheduling with Genetic Algorithms. Information and Software Technology\u00a011, 1142\u20131154 (2008)","journal-title":"Information and Software Technology"},{"key":"8_CR12","doi-asserted-by":"crossref","unstructured":"Padberg: Scheduling Software Projects to Minimize the Development Time and Cost with a Given Staff. In: Proceedings APSEC, vol.\u00a08, pp. 187\u2013194 (2001)","DOI":"10.1109\/APSEC.2001.991476"},{"key":"8_CR13","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/0165-0114(94)90211-9","volume":"67","author":"Maciej","year":"1994","unstructured":"Maciej, Hapke, A.J., Roman, S.: Fuzzy Project Scheduling System for Software Development. Fuzzy Sets and Systems\u00a067, 101\u2013117 (1994)","journal-title":"Fuzzy Sets and Systems"},{"key":"8_CR14","doi-asserted-by":"crossref","unstructured":"Sana, U.Z.: A Decision Support System for Fuzzy Scheduling of Soft-ware Projects. In: Autotestcon Proceedings, pp. 263\u2013272 (2000)","DOI":"10.1109\/AUTEST.2000.885602"},{"key":"8_CR15","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1109\/TFUZZ.2002.800692","volume":"10","author":"B. Liu","year":"2002","unstructured":"Liu, B., Liu, Y.K.: Expected Value of Fuzzy Variable and Fuzzy Expected Value Models. IEEE Transactions on Fuzzy Systems\u00a010, 445\u2013450 (2002)","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"8_CR16","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-7908-1781-2","volume-title":"Theory and Practice of Uncertain Programming","author":"B. Liu","year":"2002","unstructured":"Liu, B.: Theory and Practice of Uncertain Programming. Physica-Verlag, Heidelberg (2002)"},{"key":"8_CR17","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1142\/S0218488503002016","volume":"11","author":"Y. Liu","year":"2003","unstructured":"Liu, Y., Liu, B.: Expected Value Operator of Random Fuzzy Variable and Random Fuzzy Expected Value Models. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems\u00a011, 195\u2013215 (2003)","journal-title":"International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems"}],"container-title":["Lecture Notes in Computer Science","Advances in Neural Networks \u2013 ISNN 2009"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-01510-6_8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,9]],"date-time":"2025-02-09T16:03:12Z","timestamp":1739116992000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-01510-6_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642015090","9783642015106"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-01510-6_8","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"value":"0302-9743","type":"print"},{"value":"1611-3349","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009]]}}}