{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T05:37:12Z","timestamp":1743053832848,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":19,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642020254"},{"type":"electronic","value":"9783642020261"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-02026-1_37","type":"book-chapter","created":{"date-parts":[[2009,6,17]],"date-time":"2009-06-17T16:31:23Z","timestamp":1245256283000},"page":"395-402","source":"Crossref","is-referenced-by-count":0,"title":["Bicriteria Scheduling on Single-Machine with Inventory Operations"],"prefix":"10.1007","author":[{"given":"Baoqiang","family":"Fan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rongjun","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Guochun","family":"Tang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"37_CR1","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1002\/nav.3800330206","volume":"33","author":"U. Bagchi","year":"1986","unstructured":"Bagchi, U., Sullivan, R.S., Zhang, Y.-L.: Minimizing Absolute and Squared Deviation of Completion Times about a Common Due Date. Nav. Res. Log.\u00a033, 227\u2013240 (1986)","journal-title":"Nav. Res. Log."},{"key":"37_CR2","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1287\/opre.38.1.22","volume":"38","author":"K.R. Baker","year":"1990","unstructured":"Baker, K.R., Scudder, G.D.: Sequencing with Earliness and Tardiness Penalties: A review. Oper. Res.\u00a038, 22\u201336 (1990)","journal-title":"Oper. Res."},{"key":"37_CR3","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0305-0548(90)90022-Y","volume":"17","author":"C.L. Chen","year":"1990","unstructured":"Chen, C.L., Bulfin, R.L.: Scheduling Unit Processing Time Jobs on a Single Machine with Multiple Criteria. Comp. Oper. Res.\u00a017, 1\u20137 (1990)","journal-title":"Comp. Oper. Res."},{"key":"37_CR4","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/0377-2217(93)90236-G","volume":"70","author":"C.L. Chen","year":"1993","unstructured":"Chen, C.L., Bulfin, R.L.: Complexity of Single Machine Multicriteria Scheduling Problems. Eur. J. Oper. Res.\u00a070, 115\u2013125 (1993)","journal-title":"Eur. J. Oper. Res."},{"key":"37_CR5","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1016\/0895-7177(90)90043-M","volume":"13","author":"T.C.E. Cheng","year":"1990","unstructured":"Cheng, T.C.E.: Minimizing the Flow Time and Missed Due Dates in a Single Machine Sequencing. Math. Comp. Model.\u00a013, 71\u201377 (1990)","journal-title":"Math. Comp. Model."},{"key":"37_CR6","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1002\/1520-6750(199302)40:1<85::AID-NAV3220400106>3.0.CO;2-C","volume":"40","author":"J.S. Davis","year":"1993","unstructured":"Davis, J.S., Kanet, J.J.: Single-Machine Scheduling with Early and Tardy Completion Costs. Nav. Res. Log.\u00a040, 85\u2013101 (1993)","journal-title":"Nav. Res. Log."},{"key":"37_CR7","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1002\/nav.3800220314","volume":"22","author":"H. Emmons","year":"1975","unstructured":"Emmons, H.: One Machine Sequencing to Minimize Mean Flow Time with Minimum Number Tardy. Nav. Res. Log.\u00a022, 585\u2013592 (1975)","journal-title":"Nav. Res. Log."},{"key":"37_CR8","volume-title":"Computers and Intactability: A Guide to the Theory of NP-Completeness","author":"M.R. Garey","year":"1979","unstructured":"Garey, M.R., Johnson, D.S.: Computers and Intactability: A Guide to the Theory of NP-Completeness. Freeman, New York (1979)"},{"key":"37_CR9","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R.L. Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and Approximation in Deterministic Sequencing and Scheduling. Ann. Discrete Math.\u00a05, 287\u2013326 (1979)","journal-title":"Ann. Discrete Math."},{"key":"37_CR10","first-page":"836","volume":"39","author":"N.G. Hall","year":"1991","unstructured":"Hall, N.G., Posner, M.E.: Earliness-Tardiness Scheduling Problems, I. Weighted Deviation of Completion Times about a Common Due Date. Oper. Res.\u00a039, 836\u2013846 (1991)","journal-title":"Weighted Deviation of Completion Times about a Common Due Date. Oper. Res."},{"key":"37_CR11","doi-asserted-by":"publisher","first-page":"592","DOI":"10.1016\/j.ejor.2004.07.011","volume":"167","author":"H. Hoogeveen","year":"2005","unstructured":"Hoogeveen, H.: Multicriteria Scheduling. Eur. J. Oper. Res.\u00a0167, 592\u2013623 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"37_CR12","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1016\/j.orl.2006.01.007","volume":"35","author":"Y.-M. Huo","year":"2007","unstructured":"Huo, Y.-M., Leung, J.Y.-T., Zhao, H.-R.: Complexity of Two Dual Criteria Scheduling Problems. Oper. Res. Lett.\u00a035, 211\u2013220 (2007)","journal-title":"Oper. Res. Lett."},{"key":"37_CR13","doi-asserted-by":"publisher","first-page":"913","DOI":"10.1002\/1520-6750(199412)41:7<913::AID-NAV3220410705>3.0.CO;2-A","volume":"41","author":"Y.-D. Kim","year":"1994","unstructured":"Kim, Y.-D., Yano, C.A.: Minimizing Mean Tardiness and Earliness in Single-Machine Scheduling Problems with Unequal Due Dates. Nav. Res. Log.\u00a041, 913\u2013933 (1994)","journal-title":"Nav. Res. Log."},{"key":"37_CR14","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/0167-6377(93)90084-T","volume":"13","author":"C.-L. Li","year":"1993","unstructured":"Li, C.-L., Chen, Z.-L., Cheng, T.C.E.: A Note on One Processor Scheduling with Asymmetric Earliness and Tardiness Penalties. Oper. Res. Lett.\u00a013, 45\u201348 (1993)","journal-title":"Oper. Res. Lett."},{"key":"37_CR15","doi-asserted-by":"publisher","first-page":"102","DOI":"10.1287\/mnsc.15.1.102","volume":"15","author":"J.M. Moore","year":"1968","unstructured":"Moore, J.M.: An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs. Management Sci.\u00a015, 102\u2013109 (1968)","journal-title":"Management Sci."},{"key":"37_CR16","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/0377-2217(93)E0140-S","volume":"81","author":"A. Nagar","year":"1995","unstructured":"Nagar, A., Haddock, J., Heragu, S.: Multiple and Bicriteria Scheduling: a Literature Survey. Eur. J. Oper. Res.\u00a081, 88\u2013104 (1995)","journal-title":"Eur. J. Oper. Res."},{"key":"37_CR17","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W.E. Smith","year":"1956","unstructured":"Smith, W.E.: Various Optimizers for Single Stage Production. Nav. Res. Log.\u00a03, 59\u201366 (1956)","journal-title":"Nav. Res. Log."},{"key":"37_CR18","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-04986-0","volume-title":"Multicriteria Scheduling: Theory, Models and Algorithms","author":"V. T\u2019kindt","year":"2002","unstructured":"T\u2019kindt, V., Billaut, J.-C.: Multicriteria Scheduling: Theory, Models and Algorithms. Springer, Berlin (2002)"},{"key":"37_CR19","doi-asserted-by":"publisher","first-page":"250","DOI":"10.1080\/07408179508936738","volume":"27","author":"G.L. Vairaktarakis","year":"1995","unstructured":"Vairaktarakis, G.L., Lee, C.-Y.: The Single-Machine Scheduling Problem to Minimize Total Tardiness Subject to Minimum Number of Tardy Jobs. IIE Trans.\u00a027, 250\u2013256 (1995)","journal-title":"IIE Trans."}],"container-title":["Lecture Notes in Computer Science","Combinatorial Optimization and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-02026-1_37","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,5,2]],"date-time":"2024-05-02T03:52:28Z","timestamp":1714621948000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-02026-1_37"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642020254","9783642020261"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-02026-1_37","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2009]]}}}