{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,16]],"date-time":"2025-02-16T12:40:02Z","timestamp":1739709602040,"version":"3.37.1"},"publisher-location":"Berlin, Heidelberg","reference-count":8,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642036637"},{"type":"electronic","value":"9783642036644"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-03664-4_79","type":"book-chapter","created":{"date-parts":[[2009,12,30]],"date-time":"2009-12-30T18:11:29Z","timestamp":1262196689000},"page":"727-735","source":"Crossref","is-referenced-by-count":0,"title":["The Research on the Multi-project Human Resource Configuration Based on the Virus Evolutionary Genetic Algorithm"],"prefix":"10.1007","author":[{"given":"Xiao-gang","family":"Deng","sequence":"first","affiliation":[]},{"given":"Jia-nian","family":"Wang","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"79_CR1","doi-asserted-by":"publisher","first-page":"360","DOI":"10.1007\/s00170-005-0199-2","volume":"31","author":"Kumanan","year":"2006","unstructured":"Kumanan, Jose, S., Jegan, G.: Multi-project scheduling using an heuristic and a genetic algorithm. International Journal of Advanced Manufacturing Technology\u00a031(3), 360\u2013366 (2006)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"6","key":"79_CR2","doi-asserted-by":"publisher","first-page":"398","DOI":"10.1109\/ICCIAS.2006.294162","volume":"3","author":"Y. Xing","year":"2006","unstructured":"Xing, Y., Wang, Z., Sun, J.: A fuzzy genetic algorithm for job-shop scheduling problems with fuzzy process time and due date time. Computational Intelligence and Security\u00a03(6), 398\u2013404 (2006)","journal-title":"Computational Intelligence and Security"},{"issue":"4","key":"79_CR3","doi-asserted-by":"publisher","first-page":"434","DOI":"10.1016\/j.autcon.2008.10.007","volume":"18","author":"C. Po-Han","year":"2009","unstructured":"Po-Han, C.: Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Automation in Construction\u00a018(4), 434\u2013443 (2009)","journal-title":"Automation in Construction"},{"issue":"2","key":"79_CR4","doi-asserted-by":"publisher","first-page":"743","DOI":"10.1016\/j.cie.2004.12.008","volume":"48","author":"M. Watanabe","year":"2005","unstructured":"Watanabe, M., Ida, K.: A genetic algorithm with modified crossover operator and search arer adaptation for the job-shop scheduling problem. Computer & Industrial Engineering\u00a048(2), 743\u2013752 (2005)","journal-title":"Computer & Industrial Engineering"},{"issue":"2","key":"79_CR5","first-page":"85","volume":"8","author":"Y. Weili","year":"1999","unstructured":"Weili, Y., Deli, Y., Xiangpei, H.: A genetic algorithm for job shop scheduling problem. Operations Research and Management Science\u00a08(2), 85\u201388 (1999) (in Chinese)","journal-title":"Operations Research and Management Science"},{"issue":"9","key":"79_CR6","first-page":"71","volume":"27","author":"J. Xing","year":"2001","unstructured":"Xing, J., Gang, C.: Scheduling of activities in multi-projects management model with resource constraints. Computer Engineering\u00a027(9), 71\u201373 (2001) (in Chinese)","journal-title":"Computer Engineering"},{"key":"79_CR7","doi-asserted-by":"crossref","unstructured":"Xing, Y., Wang, Z.: An improve genetic algorithm with recurrent search for the job-shop scheduling problem. In: Proceeding of the 6th World Congress on Control and Automation, pp. 3386\u20133390 (2006)","DOI":"10.1109\/WCICA.2006.1712996"},{"issue":"1","key":"79_CR8","first-page":"297","volume":"17","author":"Y. Xing","year":"2006","unstructured":"Xing, Y., Wang, Z., Sun, J.: A mufti-objective fuzzy genetic algorithm for job-shop scheduling problems. Journal of Achievement in Mechanical and Materials Engineering\u00a017(1), 297\u2013300 (2006)","journal-title":"Journal of Achievement in Mechanical and Materials Engineering"}],"container-title":["Advances in Intelligent and Soft Computing","Fuzzy Information and Engineering Volume 2"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-03664-4_79","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,16]],"date-time":"2025-02-16T12:22:48Z","timestamp":1739708568000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-03664-4_79"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642036637","9783642036644"],"references-count":8,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-03664-4_79","relation":{},"ISSN":["1867-5662","1867-5670"],"issn-type":[{"type":"print","value":"1867-5662"},{"type":"electronic","value":"1867-5670"}],"subject":[],"published":{"date-parts":[[2009]]}}}