{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T13:06:36Z","timestamp":1725541596319},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642040443"},{"type":"electronic","value":"9783642040450"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-04045-0_16","type":"book-chapter","created":{"date-parts":[[2009,12,2]],"date-time":"2009-12-02T10:09:00Z","timestamp":1259748540000},"page":"189-199","source":"Crossref","is-referenced-by-count":5,"title":["Goal Programming Models and DSS for Manpower Planning of Airport Baggage Service"],"prefix":"10.1007","author":[{"given":"Sydney C. K.","family":"Chu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Minyue","family":"Zhu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liang","family":"Zhu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,10,21]]},"reference":[{"key":"16_CR1_16","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1016\/S0377-2217(03)00105-X","volume":"153","author":"CS Azmat","year":"2004","unstructured":"Azmat, C. S., & Widmer, M. (2004). A case study of single shift planning and scheduling under annualized hours: a simple three-step approach. European Journal of Operational Research, 153, 148\u2013175.","journal-title":"European Journal of Operational Research"},{"key":"16_CR2_16","doi-asserted-by":"publisher","first-page":"1630","DOI":"10.1287\/mnsc.46.12.1630.12074","volume":"46","author":"MJ Brusco","year":"2000","unstructured":"Brusco, M. J., & Jacobs, L. W. (2000). Optimal models for meal-break and start-time flexibility in continuous tour scheduling. Management Science, 46, 1630\u20131641.","journal-title":"Management Science"},{"key":"16_CR3_16","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(03)00106-1","volume":"153","author":"E Burke","year":"2004","unstructured":"Burke, E., & Petrovic, S. (2004). Timetabling and rostering. European Journal of Operational Research, 153, 1\u20132.","journal-title":"European Journal of Operational Research"},{"key":"16_CR4_16","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1007\/s10107-003-0413-7","volume":"89","author":"A Caprara","year":"2003","unstructured":"Caprara, A., Monaci, M., & Toth, P. (2003). Models and algorithms for a staff scheduling problem. Mahtematical Programming, 89, 445\u2013476.","journal-title":"Mahtematical Programming"},{"key":"16_CR5_16","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1002\/mcda.296","volume":"10","author":"SCK Chu","year":"2001","unstructured":"Chu, S. C. K. (2001). A goal programming model for crew duties generation. Journal of Multi-criteria Decision Analysis, 10, 143\u2013151.","journal-title":"Journal of Multi-criteria Decision Analysis"},{"key":"16_CR6_16","doi-asserted-by":"publisher","first-page":"1764","DOI":"10.1016\/j.ejor.2005.10.008","volume":"177","author":"SCK Chu","year":"2007","unstructured":"Chu, S. C. K. (2007). Generating, scheduling and rostering of shift crew-duties: Applications at the hong kong international airport. European Journal of Operational Research, 177, 1764\u20131778.","journal-title":"European Journal of Operational Research"},{"key":"16_CR7_16","first-page":"309","volume-title":"Multi-objective programming and goal-programming","author":"SCK Chu","year":"2003","unstructured":"Chu, S. C. K., & Yuen, C. S. (2003). Planning and scheduling staff duties by goal programming. In T. Tanaka & M. Inuiguchi (Eds.), Multi-objective programming and goal-programming (pp. 309\u2013316). Advances in Soft Computing, Berlin: Springer."},{"key":"16_CR8_16","unstructured":"Chu, S. C. K., & Zhu, M. (2007). Data and optimaization modeling for manpower planning of an airport baggage service. In Proceedings of the Institute of Industrial Engineers Annual Conference \u2013 2007 Industrial Engineering Research Conference (IERC 2007), Nashvill, TN, USA, 19-23 May 2007, pp. 19\u201323."},{"key":"16_CR9_16","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(03)00095-X","volume":"153","author":"AT Ernst","year":"2004","unstructured":"Ernst, A. T., Jiang, H., Krishnamoorthy, M., & Sier, D. (2004). Staff scheduling and rostering: a review of applications, methods and models. European Journal of Operational Research, 153, 3\u201327.","journal-title":"European Journal of Operational Research"},{"key":"16_CR10_16","volume-title":"Optimization modeling with LINGO","author":"L Schrage","year":"2005","unstructured":"Schrage, L. (2005). Optimization modeling with LINGO (5th ed.). Chicago: Lindo Systems Inc.","edition":"5"}],"container-title":["Lecture Notes in Economics and Mathematical Systems","Multiple Criteria Decision Making for Sustainable Energy and Transportation Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-04045-0_16.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,24]],"date-time":"2020-11-24T02:38:12Z","timestamp":1606185492000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-04045-0_16"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,10,21]]},"ISBN":["9783642040443","9783642040450"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-04045-0_16","relation":{},"ISSN":["0075-8442"],"issn-type":[{"type":"print","value":"0075-8442"}],"subject":[],"published":{"date-parts":[[2009,10,21]]}}}