{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T11:43:21Z","timestamp":1725536601568},"publisher-location":"Berlin, Heidelberg","reference-count":38,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642041327"},{"type":"electronic","value":"9783642041334"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-04133-4_8","type":"book-chapter","created":{"date-parts":[[2009,8,21]],"date-time":"2009-08-21T05:30:28Z","timestamp":1250832628000},"page":"93-104","source":"Crossref","is-referenced-by-count":27,"title":["Mapping CMMI Level 2 to Scrum Practices: An Experience Report"],"prefix":"10.1007","author":[{"given":"Jessica","family":"Diaz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Juan","family":"Garbajosa","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jose A.","family":"Calvo-Manzano","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"8_CR1","doi-asserted-by":"crossref","unstructured":"Herbsleb, J., Carleton, A., Rozum, J., Siegel, J., Zubrow, D.: Benefits of cmm-based software process improvement: Initial results. Technical report, CMU\/SEI-94-TR-013, Software Engineering Institute (1994)","DOI":"10.21236\/ADA286444"},{"key":"8_CR2","doi-asserted-by":"crossref","unstructured":"Goldenson, D.R., Gibson, D.L.: Demonstrating the impact and benefits of cmmi: An update and preliminary results. Technical report, CMU\/SEI-2003-SR-009, Software Engineering Institute (2003)","DOI":"10.21236\/ADA418481"},{"issue":"6","key":"8_CR3","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1109\/MS.2006.149","volume":"23","author":"D. Galin","year":"2006","unstructured":"Galin, D., Avrahami, M.: Are cmm program investments beneficial? analyzing past studies. IEEE Software\u00a023(6), 81\u201387 (2006)","journal-title":"IEEE Software"},{"key":"8_CR4","first-page":"350","volume-title":"Proc. Joint 16th Pacific Northwest Software Quality Conf. and 8th Int\u2019l Conf. Software Quality","author":"M. Paulk","year":"1998","unstructured":"Paulk, M.: Using the software cmm in small organizations. In: Proc. Joint 16th Pacific Northwest Software Quality Conf. and 8th Int\u2019l Conf. Software Quality, Washington, DC, USA, pp. 350\u2013360. IEEE Computer Society, Los Alamitos (1998)"},{"issue":"6","key":"8_CR5","doi-asserted-by":"publisher","first-page":"883","DOI":"10.1016\/j.jss.2006.09.008","volume":"80","author":"M. Staples","year":"2007","unstructured":"Staples, M., Niazi, M., Jeffery, R., Abrahams, A., Byatt, P., Murphy, R.: An exploratory study of why organizations do not adopt cmmi. Journal of Systems and Software\u00a080(6), 883\u2013895 (2007)","journal-title":"Journal of Systems and Software"},{"issue":"2","key":"8_CR6","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1007\/s11219-007-9038-z","volume":"16","author":"F.J. Pino","year":"2008","unstructured":"Pino, F.J., Garc\u00eda, F., Piattini, M.: Software process improvement in small and medium software enterprises: a systematic review. Software Quality Control\u00a016(2), 237\u2013261 (2008)","journal-title":"Software Quality Control"},{"key":"8_CR7","doi-asserted-by":"crossref","unstructured":"Goldenson, D.R., Herbsleb, J.D.: After the appraisal: A systematic survey of process improvement, its benefits, and factors that influence success. Technical report, CMU\/SEI-95-TR-009, Software Engineering Institute (1995)","DOI":"10.21236\/ADA300225"},{"key":"8_CR8","first-page":"12","volume-title":"ICSE 2006: Proceedings of the 28th international conference on Software engineering","author":"B. Boehm","year":"2006","unstructured":"Boehm, B.: A view of 20th and 21st century software engineering. In: ICSE 2006: Proceedings of the 28th international conference on Software engineering, pp. 12\u201329. ACM, New York (2006)"},{"key":"8_CR9","doi-asserted-by":"crossref","unstructured":"Lebsanft, K.: Process improvement in turbulent times \u2013 is cmm still an answer? Product Focused Software Process Improvement, 78\u201385 (2001)","DOI":"10.1007\/3-540-44813-6_10"},{"key":"8_CR10","first-page":"2","volume":"62","author":"D. Cohen","year":"2004","unstructured":"Cohen, D., Lindvall, M., Costa, P.: An introduction to agile methods. Advances in Computers\u00a062, 2\u201367 (2004)","journal-title":"Advances in Computers"},{"key":"8_CR11","volume-title":"Agile Software Development: The Cooperative Game","author":"A. Cockburn","year":"2006","unstructured":"Cockburn, A.: Agile Software Development: The Cooperative Game, 2nd edn. Addison-Wesley Professional, Reading (2006)","edition":"2"},{"key":"8_CR12","unstructured":"Abrahamsson, P.: Agile software development methods review and analysis. Technical report, VTT Electronics, 112 (2002)"},{"key":"8_CR13","unstructured":"K. Beck et al.: The agile manifesto, www.agilemanifesto.org (accessed, February 2009)"},{"key":"8_CR14","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1109\/Agile.2008.50","volume-title":"AGILE 2008: Proceedings of the Agile 2008","author":"T. Dingsoyr","year":"2008","unstructured":"Dingsoyr, T., Dyb\u00e5, T., Abrahamsson, P.: A preliminary roadmap for empirical research on agile software development. In: AGILE 2008: Proceedings of the Agile 2008, Washington, DC, USA, pp. 83\u201394. IEEE Computer Society, Los Alamitos (2008)"},{"issue":"9-10","key":"8_CR15","doi-asserted-by":"publisher","first-page":"833","DOI":"10.1016\/j.infsof.2008.01.006","volume":"50","author":"T. Dyb\u00e5","year":"2008","unstructured":"Dyb\u00e5, T., Dingsoyr, T.: Empirical studies of agile software development: A systematic review. Inf. Softw. Technol.\u00a050(9-10), 833\u2013859 (2008)","journal-title":"Inf. Softw. Technol."},{"key":"8_CR16","unstructured":"Ambysoft: Agile adoption rate survey (February 2008), http:\/\/www.ambysoft.com\/surveys\/agileFebruary2008.html"},{"key":"8_CR17","unstructured":"Ambler, S.W.: Has agile peaked? let\u2019s look at the numbers (May 2008), http:\/\/www.ddj.com\/architect\/207600615?pgno=1"},{"key":"8_CR18","unstructured":"Flexi research project: Flexi newsletter (February 2008) ISBN 978-951-42-8586-8"},{"key":"8_CR19","unstructured":"Fowler, M.: Using an agile software process with offshore development (July 2006), http:\/\/www.martinfowler.com\/articles\/agileOffshore.html"},{"key":"8_CR20","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1007\/3-540-45672-4_15","volume-title":"Proceedings of the Second XP Universe and First Agile Universe Conference on Extreme Programming and Agile Methods - XP\/Agile Universe 2002","author":"R. Turner","year":"2002","unstructured":"Turner, R., Jain, A.: Agile meets cmmi: Culture clash or common cause? In: Proceedings of the Second XP Universe and First Agile Universe Conference on Extreme Programming and Agile Methods - XP\/Agile Universe 2002, London, UK, pp. 153\u2013165. Springer, Heidelberg (2002)"},{"key":"8_CR21","unstructured":"Pikkarainen, M., M\u00e4ntyniemi, A.: An approach for using cmmi in agile software development assessments: Experiences from three case studies. In: Proceedings of SPICE 2006 (2006)"},{"key":"8_CR22","unstructured":"CMMI Product Team: Cmmi for development, version 1.2. Technical report, CMU\/SEI-2006-TR-008, ESC-TR-2006-008, Software Engineering Institute (2006)"},{"key":"8_CR23","unstructured":"Paulk, M.C.: Agile methodologies and process discipline. The Journal of Defence Software Engineering (October 2002)"},{"key":"8_CR24","doi-asserted-by":"crossref","unstructured":"Vriens, C.: Certifying for cmm level 2 and is09001 with xp@scrum. In: Proceedings of the Agile Development Conference. ADC 2003, June 2003, pp. 120\u2013124 (2003)","DOI":"10.1109\/ADC.2003.1231461"},{"key":"8_CR25","unstructured":"Fritzsche, M., Keil, P.: Agile methods and cmmi: Compatibility or conflict? e-Informatica Software Engineering Journal\u00a01(1) (2007)"},{"key":"8_CR26","first-page":"13","volume-title":"SEW 2007: Proceedings of the 31st IEEE Software Engineering Workshop","author":"A.S.C. Marcal","year":"2007","unstructured":"Marcal, A.S.C., Soares, F.S.F., Belchior, A.D.: Mapping cmmi project management process areas to scrum practices. In: SEW 2007: Proceedings of the 31st IEEE Software Engineering Workshop, Washington, DC, USA, pp. 13\u201322. IEEE Computer Society, Los Alamitos (2007)"},{"key":"8_CR27","doi-asserted-by":"crossref","unstructured":"Sutherland, J., Jakobsen, C., Johnson, K.: Scrum and cmmi level 5: The magic potion for code warriors. In: AGILE 2007, August 2007, pp. 272\u2013278 (2007)","DOI":"10.1109\/AGILE.2007.52"},{"key":"8_CR28","volume-title":"Agile Software Development with Scrum","author":"K. Schwaber","year":"2002","unstructured":"Schwaber, K., Beedle, M.: Agile Software Development with Scrum. Prentice-Hall, Englewood Cliffs (2002)"},{"key":"8_CR29","volume-title":"Extreme Programming Explained: Embrace Change","author":"K. Beck","year":"1999","unstructured":"Beck, K.: Extreme Programming Explained: Embrace Change. Addison-Wesley, Reading (1999)"},{"key":"8_CR30","unstructured":"Cohen, M.: User Stories Applied for Agile Software Development. The Addison-Wesley Signature Series (2004)"},{"issue":"6","key":"8_CR31","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1109\/52.965798","volume":"18","author":"M.C. Paulk","year":"2001","unstructured":"Paulk, M.C.: Extreme programming from a cmm perspective. IEEE Software\u00a018(6), 1\u20138 (2001)","journal-title":"IEEE Software"},{"key":"8_CR32","first-page":"193","volume-title":"ADC 2005: Proceedings of the Agile Development Conference","author":"D.J. Anderson","year":"2005","unstructured":"Anderson, D.J.: Stretching agile to fit cmmi level 3 - the story of creating msf for cmmi\u00aeprocess improvement at microsoft corporation. In: ADC 2005: Proceedings of the Agile Development Conference, pp. 193\u2013201. IEEE Computer Society, Los Alamitos (2005)"},{"key":"8_CR33","unstructured":"Glazer, H.: Dispelling the process myth: Having a process does not mean sacrificing agility or creativity. The Journal of Defence Software Engineering (November 2001)"},{"key":"8_CR34","doi-asserted-by":"crossref","unstructured":"Martinsson, J.: Maturing xp through the cmm. In: Extreme Programming and Agile Processes in Software Engineering (2003)","DOI":"10.1007\/3-540-44870-5_11"},{"key":"8_CR35","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1007\/978-3-540-24659-6_27","volume-title":"Product Focused Software Process Improvement","author":"T. K\u00e4hk\u00f6nen","year":"2004","unstructured":"K\u00e4hk\u00f6nen, T., Abrahamsson, P.: Achieving CMMI level 2 with enhanced extreme programming approach. In: Bomarius, F., Iida, H. (eds.) PROFES 2004. LNCS, vol.\u00a03009, pp. 378\u2013392. Springer, Heidelberg (2004)"},{"issue":"1","key":"8_CR36","doi-asserted-by":"publisher","first-page":"64","DOI":"10.1109\/2.976920","volume":"35","author":"B. Barry","year":"2002","unstructured":"Barry, B.: Get ready for agile methods, with care. Computer\u00a035(1), 64\u201369 (2002)","journal-title":"Computer"},{"key":"8_CR37","unstructured":"Buglione, L., Abran, A.: Improving estimations in agile projects: issues and avenues. In: Proceedings of the 4th Software Measurement European Forum (SMEF 2007), May 9-11, pp. 265\u2013274 (2007)"},{"key":"8_CR38","doi-asserted-by":"crossref","unstructured":"Magro, B., Garbajosa, J., Perez-Benedi, J.: A software product line definition for validation environments. In: Software Product Lines Conference, SPLC (2008)","DOI":"10.1109\/SPLC.2008.35"}],"container-title":["Communications in Computer and Information Science","Software Process Improvement"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-04133-4_8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,21]],"date-time":"2019-05-21T23:37:05Z","timestamp":1558481825000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-04133-4_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642041327","9783642041334"],"references-count":38,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-04133-4_8","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2009]]}}}