{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T12:09:39Z","timestamp":1725538179078},"publisher-location":"Berlin, Heidelberg","reference-count":9,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642042645"},{"type":"electronic","value":"9783642042652"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-04265-2_53","type":"book-chapter","created":{"date-parts":[[2009,9,14]],"date-time":"2009-09-14T19:02:01Z","timestamp":1252954921000},"page":"351-358","source":"Crossref","is-referenced-by-count":1,"title":["Optimization of Product Development Process Based on Multi-agent Simulation"],"prefix":"10.1007","author":[{"given":"Ying","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yitai","family":"Xu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaodong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"4","key":"53_CR1","doi-asserted-by":"publisher","first-page":"428","DOI":"10.1109\/TEM.2002.806709","volume":"49","author":"T.R. Browning","year":"2002","unstructured":"Browning, T.R., Eppinger, S.D.: Modelling Impacts of Process Architecture on Cost and Schedule Risk in Product Development. IEEE Transactions on Engineering Management\u00a049(4), 428\u2013442 (2002)","journal-title":"IEEE Transactions on Engineering Management"},{"key":"53_CR2","doi-asserted-by":"crossref","unstructured":"Cho, S.H., Eppinger, S.D.: Product Development Process Modelling Using Advanced Simulation. Proceedings of Design Engineering Technical Conferences and Computers and Information in Engineering. Pennsylvania (2001)","DOI":"10.1115\/DETC2001\/DTM-21691"},{"issue":"3","key":"53_CR3","first-page":"726","volume":"18","author":"Y. Yao","year":"2006","unstructured":"Yao, Y., Fan, W.H., Xiong, G.L.: Research on Complex Product Development Process Simulation and Its Optimization. Journal of System Simulation\u00a018(3), 726\u2013730 (2006)","journal-title":"Journal of System Simulation"},{"issue":"1","key":"53_CR4","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1109\/TEM.2005.861805","volume":"53","author":"H.M.E. Abdelsalam","year":"2006","unstructured":"Abdelsalam, H.M.E., Bao, H.P.: A Simulation-based Optimization Framework for Product Development Cycle Time Reduction. IEEE Transactions on Engineering Management\u00a053(1), 69\u201385 (2006)","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"4","key":"53_CR5","doi-asserted-by":"publisher","first-page":"329","DOI":"10.1016\/S0736-5845(03)00027-9","volume":"19","author":"H. Yan","year":"2003","unstructured":"Yan, H., Wang, Z., Jiao, X.: Modelling, Scheduling and Simulation of Product Development Process by Extended Stochastic High-level Evaluation Petri Nets. Robotics and Computer-Integrated Manufacturing\u00a019(4), 329\u2013342 (2003)","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"6","key":"53_CR6","first-page":"1322","volume":"17","author":"X. Zu","year":"2005","unstructured":"Zu, X., Huang, H.Z.H., Zhou, F.: Resources Management and Simulation of Product Development. Journal of System Simulation\u00a017(6), 1322\u20131325 (2005)","journal-title":"Journal of System Simulation"},{"key":"53_CR7","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1007\/s10588-005-6283-1","volume":"10","author":"T. Horri","year":"2004","unstructured":"Horri, T., Jin, Y., Levitt, R.E.: Modeling and Analyzing Cultural Influences on Project Team Performance. Computional & Mathematical Organization Theory\u00a010, 305\u2013321 (2004)","journal-title":"Computional & Mathematical Organization Theory"},{"issue":"3","key":"53_CR8","first-page":"1","volume":"3","author":"T. Licht","year":"2007","unstructured":"Licht, T., Schmidt, L., Schlick, C., Dohmen, L., Luczak, H.: Person-Centered Simulation and Product Development processes. International Journal of Simulation and Process Modelling\u00a03(3), 1\u201332 (2007)","journal-title":"International Journal of Simulation and Process Modelling"},{"issue":"13","key":"53_CR9","doi-asserted-by":"publisher","first-page":"3471","DOI":"10.1080\/00207540802356770","volume":"47","author":"X. Zhang","year":"2009","unstructured":"Zhang, X., Luo, L., Yang, Y., Li, Y., Schlick, C.M., Grandt, M.: A Simulation Approach for Evaluation and Improvement of Organisational Planning in Collaborative Product Development Projects. International Journal of Production Research\u00a047(13), 3471\u20133501 (2009)","journal-title":"International Journal of Production Research"}],"container-title":["Lecture Notes in Computer Science","Cooperative Design, Visualization, and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-04265-2_53","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,10,10]],"date-time":"2021-10-10T18:18:09Z","timestamp":1633889889000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-04265-2_53"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642042645","9783642042652"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-04265-2_53","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2009]]}}}