{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T10:56:03Z","timestamp":1743072963616,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":15,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642045912"},{"type":"electronic","value":"9783642045929"}],"license":[{"start":{"date-parts":[[2009,1,1]],"date-time":"2009-01-01T00:00:00Z","timestamp":1230768000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-04592-9_26","type":"book-chapter","created":{"date-parts":[[2009,9,28]],"date-time":"2009-09-28T06:41:21Z","timestamp":1254120081000},"page":"203-211","source":"Crossref","is-referenced-by-count":3,"title":["Particle Swarm Optimization for Multi-function Worker Assignment Problem"],"prefix":"10.1007","author":[{"given":"Shamshul Bahar","family":"Yaakob","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Junzo","family":"Watada","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"13","key":"26_CR1","doi-asserted-by":"publisher","first-page":"3485","DOI":"10.1080\/00207540601115997","volume":"46","author":"P.W. John","year":"2008","unstructured":"John, P.W.: Worker allocation in lean U-shaped production lines. International Journal of Production Research\u00a046(13), 3485\u20133502 (2008)","journal-title":"International Journal of Production Research"},{"key":"26_CR2","doi-asserted-by":"crossref","unstructured":"Li, Q., Gong, J., Tang, J., Song, J.: Simulation of the model of workers\u2019 assignment in cellular manufacturing based on the multifunctional workers. In: Chinese Control and Decision Conference, pp. 992\u2013996 (2008)","DOI":"10.1109\/CCDC.2008.4597461"},{"issue":"3","key":"26_CR3","doi-asserted-by":"publisher","first-page":"609","DOI":"10.1016\/j.cie.2003.03.004","volume":"48","author":"J. Slomp","year":"2005","unstructured":"Slomp, J., Bokhorst, J.A.C., Molleman, E.: cross-training in a cellular manufacturing environment. Computer and Industrial engineering\u00a048(3), 609\u2013624 (2005)","journal-title":"Computer and Industrial engineering"},{"key":"26_CR4","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1016\/j.cie.2004.12.014","volume":"48","author":"E.L. Fitzpatrick","year":"2005","unstructured":"Fitzpatrick, E.L., Askin, R.G.: Forming effective worker teams with multi-functional skill reqiurements. Journal of Computer & Industrial Engineering\u00a048, 539\u2013608 (2005)","journal-title":"Journal of Computer & Industrial Engineering"},{"issue":"5","key":"26_CR5","doi-asserted-by":"publisher","first-page":"501","DOI":"10.1002\/hfm.20120","volume":"18","author":"T. Stefan","year":"2008","unstructured":"Stefan, T., Monika, W.: Toward the measure of virtual teams effectiveness. Human Factors and Ergonomics in Manufacturing\u00a018(5), 501\u2013514 (2008)","journal-title":"Human Factors and Ergonomics in Manufacturing"},{"key":"26_CR6","doi-asserted-by":"publisher","first-page":"651","DOI":"10.1016\/j.jom.2008.01.001","volume":"26","author":"W.Y. Rachel","year":"2008","unstructured":"Rachel, W.Y., Andy, C.L., Edwin, T.C.: The impact of employee satisfaction on quality and profitability in high-contact service industries. Journal of Operations Management\u00a026, 651\u2013668 (2008)","journal-title":"Journal of Operations Management"},{"key":"26_CR7","doi-asserted-by":"publisher","first-page":"353","DOI":"10.1016\/S0925-5273(98)00145-5","volume":"60","author":"K. Nakade","year":"1999","unstructured":"Nakade, K., Ohno, K.: An optimal worker allocation problem for a U-shaped production line. International Journal of Production Economics\u00a060, 353\u2013358 (1999)","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"26_CR8","doi-asserted-by":"publisher","first-page":"2009","DOI":"10.1080\/00207540600821009","volume":"46","author":"M. Paquet","year":"2008","unstructured":"Paquet, M., Martell, A., Montreuil, B.: A manufacturing network design model based on processor and worker capabilities. International Journal of Production Research\u00a046(7), 2009\u20132030 (2008)","journal-title":"International Journal of Production Research"},{"key":"26_CR9","doi-asserted-by":"publisher","first-page":"791","DOI":"10.1016\/j.ejor.2007.11.008","volume":"193","author":"V. Valls","year":"2009","unstructured":"Valls, V., Perez, A., Quintanilla, S.: Skilled workforce scheduling in service centres. European Journal of Operations Research\u00a0193, 791\u2013804 (2009)","journal-title":"European Journal of Operations Research"},{"key":"26_CR10","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1016\/S0141-9331(02)00053-4","volume":"26","author":"A. Salman","year":"2002","unstructured":"Salman, A., Ahmad, I., Al-madani, S.: Particle swarm optimization for task assignment problem. Journal of Microprocessors and Microsystems\u00a026, 363\u2013371 (2002)","journal-title":"Journal of Microprocessors and Microsystems"},{"key":"26_CR11","doi-asserted-by":"publisher","first-page":"791","DOI":"10.1016\/j.cie.2006.09.002","volume":"51","author":"D.Y. Sha","year":"2006","unstructured":"Sha, D.Y., Hsu, C.-Y.: A hybrid particle swarm optimization for job shop scheduling problem. Journal of Computers & Industrial Engineering\u00a051, 791\u2013808 (2006)","journal-title":"Journal of Computers & Industrial Engineering"},{"key":"26_CR12","series-title":"Lecture Notes in Artificial Intelligence","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1007\/978-3-540-85567-5_15","volume-title":"Knowledge-Based Intelligent Information and Engineering Systems","author":"S.B. Yaakob","year":"2008","unstructured":"Yaakob, S.B., Watada, J.: Placement problem in an industrial environment: Knowledge-based intelligent information and engineering systems. In: Lovrek, I., Howlett, R.J., Jain, L.C. (eds.) KES 2008, Part III. LNCS (LNAI), vol.\u00a05179, pp. 111\u2013118. Springer, Heidelberg (2008)"},{"key":"26_CR13","doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R.C.: Particle swarm optimization. In: Proceedings of the IEEE International Conference on Neural Network, pp. 1942\u20131948 (1995)","DOI":"10.1109\/ICNN.1995.488968"},{"key":"26_CR14","doi-asserted-by":"crossref","unstructured":"Shi, Y., Eberhart, R.: Empirical study of particle swarm optimization. In: Proceeding of the Congress on Evolutionary Computation (CEC 1999), pp. 1945\u20131950 (1999)","DOI":"10.1109\/CEC.1999.785511"},{"key":"26_CR15","doi-asserted-by":"crossref","unstructured":"Chen, W., Zhang, R.-T., Cai, Y.-M., Xu, F.-S.: Particle swarm optimization for constrained portfolio selection problems. In: Proceeding of the Fifth International Conference on Machine Learning and Cybernetics, pp. 2425\u20132429 (2006)","DOI":"10.1109\/ICMLC.2006.258773"}],"container-title":["Lecture Notes in Computer Science","Knowledge-Based and Intelligent Information and Engineering Systems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-04592-9_26","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,3,9]],"date-time":"2019-03-09T20:46:39Z","timestamp":1552164399000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-04592-9_26"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642045912","9783642045929"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-04592-9_26","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2009]]}}}