{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T11:33:31Z","timestamp":1742988811689,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":31,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642104299"},{"type":"electronic","value":"9783642104305"}],"license":[{"start":{"date-parts":[[2010,1,1]],"date-time":"2010-01-01T00:00:00Z","timestamp":1262304000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2010,1,1]],"date-time":"2010-01-01T00:00:00Z","timestamp":1262304000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-10430-5_98","type":"book-chapter","created":{"date-parts":[[2010,3,17]],"date-time":"2010-03-17T20:19:20Z","timestamp":1268857160000},"page":"1277-1289","source":"Crossref","is-referenced-by-count":0,"title":["Wireless Devices Enabled Information System Design Poka-Yokes: A Case Study with a Manufacturing Logistics Process"],"prefix":"10.1007","author":[{"given":"Abraham","family":"Zhang","sequence":"first","affiliation":[]}],"member":"297","reference":[{"key":"98_CR1","doi-asserted-by":"crossref","unstructured":"Bayers, P.C.: Using Poka Yoke (Mistake Proofing Devices) to Ensure Quality. In: Paper presented at the IEEE 9th Applied Power Electronics Conference and Exposition, Orlando, Florida, pp. 201\u2013204 (1994)","DOI":"10.1109\/APEC.1994.316399"},{"issue":"3","key":"98_CR2","first-page":"35","volume":"35","author":"R.B. Chase","year":"1994","unstructured":"Chase, R.B., Stewart, D.M.: Make Your Service Fail-Safe. Sloan Management Review\u00a035(3), 35\u201344 (1994)","journal-title":"Sloan Management Review"},{"key":"98_CR3","volume-title":"Mistake-proofing: designing errors out","author":"R.B. Chase","year":"1995","unstructured":"Chase, R.B., Stewart, D.M.: Mistake-proofing: designing errors out. Productivity Press, Portland (1995)"},{"key":"98_CR4","volume-title":"Out of the Crisis: Quality, Productivity and Competitive Position","author":"W.E. Deming","year":"1986","unstructured":"Deming, W.E.: Out of the Crisis: Quality, Productivity and Competitive Position. Cambridge University Press, Cambridge (1986)"},{"issue":"4","key":"98_CR5","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1080\/00224065.1999.11979948","volume":"31","author":"B.T. Downs","year":"1999","unstructured":"Downs, B.T., Grout, J.R.: An economic analysis of inspection costs for mistake-proofing binomial attributes. Journal of Quality Technology\u00a031(4), 417\u2013426 (1999)","journal-title":"Journal of Quality Technology"},{"issue":"2","key":"98_CR6","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1108\/13552520610654069","volume":"12","author":"M.L. Emiliani","year":"2006","unstructured":"Emiliani, M.L.: Origins of lean management in America. Journal of Management History\u00a012(2), 167\u2013184 (2006)","journal-title":"Journal of Management History"},{"key":"98_CR7","volume-title":"Managing for Quality and Performance Excellence","author":"J.R. Evans","year":"2008","unstructured":"Evans, J.R., Lindsay, W.M.: Managing for Quality and Performance Excellence, 7th edn. Thomson Higher Education, Mason (2008)","edition":"7"},{"issue":"6","key":"98_CR8","doi-asserted-by":"publisher","first-page":"463","DOI":"10.1080\/0954412988398","volume":"9","author":"P. Ghinato","year":"1998","unstructured":"Ghinato, P.: Quality control methods: Towards modern approaches through well established principles. Total Quality Management\u00a09(6), 463\u2013477 (1998)","journal-title":"Total Quality Management"},{"issue":"3","key":"98_CR9","first-page":"33","volume":"38","author":"J.R. Grout","year":"1997","unstructured":"Grout, J.R.: Mistake-proofing production. Production and Inventory Management Journal\u00a038(3), 33\u201337 (1997)","journal-title":"Production and Inventory Management Journal"},{"issue":"2","key":"98_CR10","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1080\/10686967.1998.11918855","volume":"5","author":"J.R. Grout","year":"1998","unstructured":"Grout, J.R., Downs, B.T.: Mistake-Proofing and Measurement Control Charts. Quality Management Journal\u00a05(2), 67\u201375 (1998)","journal-title":"Quality Management Journal"},{"issue":"3","key":"98_CR11","doi-asserted-by":"crossref","first-page":"242","DOI":"10.1080\/00224065.1995.11979596","volume":"27","author":"C.M. Hinckley","year":"1995","unstructured":"Hinckley, C.M., Barkan, P.: The role of variation, mistakes, and complexity in producing nonconformities. Journal of Quality Technology\u00a027(3), 242\u2013249 (1995)","journal-title":"Journal of Quality Technology"},{"issue":"6","key":"98_CR12","doi-asserted-by":"publisher","first-page":"701","DOI":"10.1007\/s10845-008-0121-5","volume":"19","author":"G.Q. Huang","year":"2008","unstructured":"Huang, G.Q., Zhang, Y.F., Chen, X., Newman, S.T.: RFID-enabled real-time wireless manufacturing for adaptive assembly planning and control. Journal of Intelligent Manufacturing\u00a019(6), 701\u2013713 (2008)","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"98_CR13","doi-asserted-by":"crossref","first-page":"5","DOI":"10.5465\/amp.2006.20591002","volume":"20","author":"K.L. Jeffrey","year":"2006","unstructured":"Jeffrey, K.L., James, M.M.: The Toyota Way in Services: The Case of Lean Product Development. The Academy of Management Perspectives\u00a020(2), 5\u201320 (2006)","journal-title":"The Academy of Management Perspectives"},{"issue":"3","key":"98_CR14","first-page":"34","volume":"50","author":"S. Manivannan","year":"2007","unstructured":"Manivannan, S.: Improve Productivity With Poka-Yoke. Assembly\u00a050(3), 34\u201338 (2007)","journal-title":"Assembly"},{"issue":"2","key":"98_CR15","doi-asserted-by":"publisher","first-page":"420","DOI":"10.1016\/j.jom.2006.04.001","volume":"25","author":"H. Matthias","year":"2007","unstructured":"Matthias, H.: The genealogy of lean production. Journal of Operations Management\u00a025(2), 420\u2013437 (2007)","journal-title":"Journal of Operations Management"},{"issue":"16","key":"98_CR16","doi-asserted-by":"publisher","first-page":"3545","DOI":"10.1080\/00207540701223386","volume":"45","author":"S.J. New","year":"2007","unstructured":"New, S.J.: Celebrating the enigma: the continuing puzzle of the Toyota Production System. International Journal of Production Research\u00a045(16), 3545\u20133554 (2007)","journal-title":"International Journal of Production Research"},{"key":"98_CR17","unstructured":"NKS\/Factory Magazine, Poka-Yoke: Improving Product Quality by Preventing Defects. Productivity Press, Cambridge (1988)"},{"key":"98_CR18","volume-title":"Toyota Production System: Beyond Large-scale Production","author":"T. Ohno","year":"1988","unstructured":"Ohno, T.: Toyota Production System: Beyond Large-scale Production. Productivity Press, Portland (1988)"},{"key":"98_CR19","unstructured":"Mistake-Proofing for Operators: The ZQC System. Productivity Press, Portland (1997)"},{"key":"98_CR20","volume-title":"Modern Approaches to Manufacturing Improvement: The Shingo System","author":"A.G. Robinson","year":"1991","unstructured":"Robinson, A.G.: Modern Approaches to Manufacturing Improvement: The Shingo System. Productivity Press, Portland (1991)"},{"issue":"3","key":"98_CR21","first-page":"60","volume":"31","author":"A.G. Robinson","year":"1990","unstructured":"Robinson, A.G., Schroeder, D.M.: The Limited Role of SQC in a Zero-Defect Environment. Production and Inventory Management Journal\u00a031(3), 60\u201365 (1990)","journal-title":"Production and Inventory Management Journal"},{"issue":"2","key":"98_CR22","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1016\/S0272-6963(02)00108-0","volume":"21","author":"R. Shah","year":"2003","unstructured":"Shah, R., Ward, P.T.: Lean manufacturing: Context, practice bundles, and performance. Journal of Operations Management\u00a021(2), 129\u2013149 (2003)","journal-title":"Journal of Operations Management"},{"key":"98_CR23","volume-title":"Zero Quality Control: Source Inspection and the Poka-yoke System (A. P. Dillon, Trans.)","author":"S. Shingo","year":"1986","unstructured":"Shingo, S.: Zero Quality Control: Source Inspection and the Poka-yoke System (A. P. Dillon, Trans.). Productivity Press, Cambridge (1986)"},{"key":"98_CR24","volume-title":"A Study of the Toyota Production System from an Industrial Engineering Viewpoint (A. P. Dillon, Trans.)","author":"S. Shingo","year":"1989","unstructured":"Shingo, S.: A Study of the Toyota Production System from an Industrial Engineering Viewpoint (A. P. Dillon, Trans.). Productivity Press, Portland (1989)"},{"issue":"4","key":"98_CR25","doi-asserted-by":"publisher","first-page":"440","DOI":"10.1111\/j.1937-5956.2001.tb00086.x","volume":"10","author":"D.M. Stewart","year":"2001","unstructured":"Stewart, D.M., Grout, J.R.: The human side of mistake-proofing. Production and Operations Management\u00a010(4), 440\u2013459 (2001)","journal-title":"Production and Operations Management"},{"issue":"6","key":"98_CR26","doi-asserted-by":"publisher","first-page":"553","DOI":"10.1080\/00207547708943149","volume":"15","author":"Y. Sugimori","year":"1977","unstructured":"Sugimori, Y., Kusunoki, K., Cho, F., Uchikawa, S.: Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system. International Journal of Production Research\u00a015(6), 553\u2013564 (1977)","journal-title":"International Journal of Production Research"},{"issue":"3","key":"98_CR27","doi-asserted-by":"publisher","first-page":"10","DOI":"10.1108\/eb039071","volume":"5","author":"K. Suzaki","year":"1985","unstructured":"Suzaki, K.: Japanese Manufacturing Techniques: Their Importance to U.S. Manufacturers. The Journal of Business Strategy\u00a05(3), 10\u201319 (1985)","journal-title":"The Journal of Business Strategy"},{"key":"98_CR28","unstructured":"Toyota Motor Corporation, Making Things: The Essence and Evolution of the Toyota Production System (2002), http:\/\/www.lean.org\/Community\/Registered\/ArticleDocuments\/TPS%20evolution.pdf (retrieved: April 12, 2009)"},{"key":"98_CR29","first-page":"79","volume-title":"Quality through engineering design","author":"Y. Tsuda","year":"1993","unstructured":"Tsuda, Y.: Implications of fool proofing in the manufacturing process. In: Kuo, W. (ed.) Quality through engineering design, pp. 79\u201395. Elsevier, New York (1993)"},{"issue":"1","key":"98_CR30","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/mnsc.45.1.1","volume":"45","author":"R.E. White","year":"1999","unstructured":"White, R.E., Pearson, J.N., Wilson, J.R.: JIT manufacturing: A survey of implementations in small and large U.S. manufacturers. Management Science\u00a045(1), 1\u201315 (1999)","journal-title":"Management Science"},{"key":"98_CR31","volume-title":"The Machine that Changed the World","author":"J.P. Womack","year":"1990","unstructured":"Womack, J.P., Jones, D.T., Roos, D.: The Machine that Changed the World. Rawson Associates, New York (1990)"}],"container-title":["Advances in Intelligent and Soft Computing","Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-10430-5_98","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,19]],"date-time":"2025-02-19T14:51:12Z","timestamp":1739976672000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-10430-5_98"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642104299","9783642104305"],"references-count":31,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-10430-5_98","relation":{},"ISSN":["1867-5662","1867-5670"],"issn-type":[{"type":"print","value":"1867-5662"},{"type":"electronic","value":"1867-5670"}],"subject":[],"published":{"date-parts":[[2010]]}}}