{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,14]],"date-time":"2025-02-14T05:30:07Z","timestamp":1739511007772,"version":"3.37.0"},"publisher-location":"Berlin, Heidelberg","reference-count":18,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642108167"},{"type":"electronic","value":"9783642108174"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-10817-4_41","type":"book-chapter","created":{"date-parts":[[2009,12,15]],"date-time":"2009-12-15T08:36:47Z","timestamp":1260866207000},"page":"412-422","source":"Crossref","is-referenced-by-count":2,"title":["Dynamic Mechanism and Key Rectification Techniques of Shield Machine in the Vertical Plane"],"prefix":"10.1007","author":[{"given":"Ming","family":"Yue","sequence":"first","affiliation":[]},{"given":"Jian","family":"Wei","sequence":"additional","affiliation":[]},{"given":"Wei","family":"Sun","sequence":"additional","affiliation":[]},{"given":"Zhenggang","family":"Guo","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"2","key":"41_CR1","doi-asserted-by":"publisher","first-page":"138","DOI":"10.1061\/(ASCE)1090-0241(2002)128:2(138)","volume":"128","author":"M. Sugimoto","year":"2002","unstructured":"Sugimoto, M., Sramoon, A.: Theoretical Model of Shield Behavior During Excavation I: Theory. Journal of Geotechnical and Geoenvironmental Engineering\u00a0128(2), 138\u2013155 (2002)","journal-title":"Journal of Geotechnical and Geoenvironmental Engineering"},{"issue":"2","key":"41_CR2","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1061\/(ASCE)1090-0241(2002)128:2(156)","volume":"128","author":"A. Sramoon","year":"2002","unstructured":"Sramoon, A., Sugimoto, M., Kouji, K.: Theoretical model of shield behavior during excavation II: Application. Journal of Geotechnical and Geoenvironmental Engineering\u00a0128(2), 156\u2013165 (2002)","journal-title":"Journal of Geotechnical and Geoenvironmental Engineering"},{"key":"41_CR3","doi-asserted-by":"crossref","unstructured":"Roozbeh, K.: Advanced robotics in civil engineering and construction. In: Fifth International Conference on Advanced Robotics, Pisa, Italy, pp. 375\u2013378 (1991)","DOI":"10.1109\/ICAR.1991.240624"},{"key":"41_CR4","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1007\/978-3-540-88513-9_8","volume-title":"Proceedings of the First International Conference on Intelligent Robotics and Applications","author":"Y.A. Huang","year":"2008","unstructured":"Huang, Y.A., Xiong, Y.L.: Force Planning for Underground Articulated Robot. In: Proceedings of the First International Conference on Intelligent Robotics and Applications, pp. 64\u201374. Springer, Heidelberg (2008)"},{"issue":"3","key":"41_CR5","first-page":"621","volume":"28","author":"Y. Song","year":"2009","unstructured":"Song, Y., Tang, Y., Mu, G.H., Wang, G.: Monitoring of tunnel clearance displacements under condition of TBM construction. Chinese Journal of Rock Mechanics and Engineering\u00a028(3), 621\u2013627 (2009)","journal-title":"Chinese Journal of Rock Mechanics and Engineering"},{"issue":"2","key":"41_CR6","first-page":"4709","volume":"23","author":"Q.M. Gong","year":"2004","unstructured":"Gong, Q.M., Zhao, J., Zhang, X.H.: Performance prediction of hard rock TBM tunneling. Chinese Journal of Rock Mechanics and Engineering.\u00a023(2), 4709\u20134714 (2004)","journal-title":"Chinese Journal of Rock Mechanics and Engineering."},{"issue":"3","key":"41_CR7","doi-asserted-by":"publisher","first-page":"326","DOI":"10.1016\/j.tust.2007.04.011","volume":"23","author":"Y. Saffet","year":"2008","unstructured":"Saffet, Y.: Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunnelling and Underground Space Technology\u00a023(3), 326\u2013339 (2008)","journal-title":"Tunnelling and Underground Space Technology"},{"issue":"2","key":"41_CR8","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1016\/j.tust.2005.06.007","volume":"21","author":"S. Suchatvee","year":"2006","unstructured":"Suchatvee, S., Einstein, H.H.: Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling. Tunnelling and Underground Space Technology\u00a021(2), 133\u2013150 (2006)","journal-title":"Tunnelling and Underground Space Technology"},{"key":"41_CR9","unstructured":"Sadaghiani, M.H., Aliari, Y.: Effect of EPB tunnelling on surface settlement. In: Annual Conference of the Canadian Society for Civil Engineering 2007, Yellowknife, NT, United states, pp. 1003\u20131012 (2007)"},{"key":"41_CR10","unstructured":"Vinai, R., Peila, D., Oggeri, C., Pelizza, S.: Laboratory tests for EPB tunnelling soil conditioning. In: 33rd ITA-AITES World Tunnel Congress - Underground Space - The 4th Dimension of Metropolises, Prague, Czech republic, pp. 273\u2013278 (2007)"},{"issue":"1","key":"41_CR11","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1002\/(SICI)1096-9853(199901)23:1<23::AID-NAG956>3.0.CO;2-Z","volume":"23","author":"A. Farsakh","year":"1999","unstructured":"Farsakh, A., Murad, Y., Voyiadjis, G.Z.: Computational model for the simulation of the shield tunneling process in cohesive soils. International Journal for Numerical and Analytical Methods in Geomechanics\u00a023(1), 23\u201344 (1999)","journal-title":"International Journal for Numerical and Analytical Methods in Geomechanics"},{"issue":"10","key":"41_CR12","doi-asserted-by":"publisher","first-page":"1640","DOI":"10.1061\/(ASCE)0733-9410(1993)119:10(1640)","volume":"119","author":"C.G. Wayne","year":"1993","unstructured":"Wayne, C.G., Eric, L.: EPB shield tunneling in mixed face conditions. Journal of geotechnical engineering\u00a0119(10), 1640\u20131656 (1993)","journal-title":"Journal of geotechnical engineering"},{"key":"41_CR13","unstructured":"Dieter, H., Lutz, T.: North-South Urban Light Railway Cologne - A challenge for planning and construction - Technical solutions for the accomplishment of the upcoming tasks concerning the tunnels. In: 33rd ITA-AITES World Tunnel Congress - Underground Space - The 4th Dimension of Metropolises, Prague, Czech republic, pp. 1161\u20131167 (2007)"},{"issue":"8","key":"41_CR14","first-page":"1296","volume":"42","author":"J.Q. Shen","year":"2008","unstructured":"Shen, J.Q., Jin, X.L., Wang, J.Y.: Three dimensional numerical simulation of shield tunneling through flood levee based on parallel computing. Journal of Shanghai Jiaotong University\u00a042(8), 1296\u20131300 (2008)","journal-title":"Journal of Shanghai Jiaotong University"},{"issue":"3","key":"41_CR15","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/j.tust.2007.06.007","volume":"23","author":"H.H. Mo","year":"2008","unstructured":"Mo, H.H., Chen, J.S.: Study on inner force and dislocation of segments caused by shield machine attitude. Tunnelling and Underground Space Technology\u00a023(3), 281\u2013291 (2008)","journal-title":"Tunnelling and Underground Space Technology"},{"key":"41_CR16","doi-asserted-by":"crossref","unstructured":"Shen, S.L., Cai, F.X., Bai, T.H., Zhu, J.M.: Direction deviation control during Double-O-Tube (DOT) tunnel construction. In: The GeoShanghai Conference on Underground Construction and Ground Movement, Shanghai, China, pp. 185\u2013192 (2006)","DOI":"10.1061\/40867(199)22"},{"issue":"6","key":"41_CR17","doi-asserted-by":"publisher","first-page":"684","DOI":"10.1061\/(ASCE)1090-0241(2007)133:6(684)","volume":"133","author":"S. Mitsutaka","year":"2007","unstructured":"Mitsutaka, S., Aphichat, S., Shinji, K., Yutaka, S.: Simulation of shield tunneling behavior along a curved alignment in a multilayered ground. Journal of Geotechnical and Geoenvironmental Engineering\u00a0133(6), 684\u2013694 (2007)","journal-title":"Journal of Geotechnical and Geoenvironmental Engineering"},{"issue":"6","key":"41_CR18","doi-asserted-by":"publisher","first-page":"124","DOI":"10.3901\/JME.2006.06.124","volume":"42","author":"G.L. Hu","year":"2006","unstructured":"Hu, G.L., Gong, G.F., Yang, H.: Thrust hydraulic system of shield tunnel boring machine with pressure and flow compound control. Chinese Journal of Mechanical Engineering\u00a042(6), 124\u2013127 (2006)","journal-title":"Chinese Journal of Mechanical Engineering"}],"container-title":["Lecture Notes in Computer Science","Intelligent Robotics and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-10817-4_41.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,13]],"date-time":"2025-02-13T20:34:41Z","timestamp":1739478881000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-10817-4_41"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642108167","9783642108174"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-10817-4_41","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2009]]}}}