{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T17:01:13Z","timestamp":1725555673614},"publisher-location":"Berlin, Heidelberg","reference-count":47,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642120510"},{"type":"electronic","value":"9783642120527"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-12052-7_7","type":"book-chapter","created":{"date-parts":[[2010,5,17]],"date-time":"2010-05-17T10:30:04Z","timestamp":1274092204000},"page":"125-142","source":"Crossref","is-referenced-by-count":0,"title":["Fuzzy Technology in Advanced Manufacturing Systems: A Fuzzy-Neural Approach to Job Remaining Cycle Time Estimation"],"prefix":"10.1007","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"7_CR1","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1080\/07408179808966489","volume":"30","author":"S. Barman","year":"1998","unstructured":"Barman, S.: The impact of priority rule combinations on lateness and tardiness. IIE Transactions\u00a030, 495\u2013504 (1998)","journal-title":"IIE Transactions"},{"key":"7_CR2","doi-asserted-by":"crossref","unstructured":"Chandiramani, V., Jayaseelan, R., Nathan, V.S.L., Priya, K.S.: A neural network approach to process assignment in multiprocessor systems based on the execution time. In: Proceedings of International Conference on Intelligent Sensing and Information Processing (ICISIP 2004), Chennai, India, pp. 332\u2013335 (2004)","DOI":"10.1109\/ICISIP.2004.1287678"},{"key":"7_CR3","doi-asserted-by":"crossref","unstructured":"Chang, P.C., Chen, L.Y.: A hybrid regulation system by evolving CBR with GA for a twin laser measuring system. International Journal of Advanced Manufacturing Technology (2006), doi:10.1007\/s00170-005-0286-4","DOI":"10.1007\/s00170-005-0286-4"},{"issue":"1","key":"7_CR4","first-page":"55","volume":"10","author":"P.C. Chang","year":"2003","unstructured":"Chang, P.C., Hsieh, J.C.: A neural networks approach for due-date assignment in a wafer fabrication factory. International Journal of Industrial Engineering\u00a010(1), 55\u201361 (2003)","journal-title":"International Journal of Industrial Engineering"},{"key":"7_CR5","doi-asserted-by":"crossref","unstructured":"Chang, P.C., Hsieh, J.C., Liao, T.W.: A case-based reasoning approach for due date assignment in a wafer fabrication factory. In: Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada (2001)","DOI":"10.1007\/3-540-44593-5_46"},{"key":"7_CR6","doi-asserted-by":"publisher","first-page":"549","DOI":"10.1007\/s10845-005-1663-4","volume":"16","author":"P.C. Chang","year":"2005","unstructured":"Chang, P.C., Hsieh, J.C., Liao, T.W.: Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing\u00a016, 549\u2013557 (2005)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"7_CR7","doi-asserted-by":"publisher","first-page":"198","DOI":"10.1016\/j.asoc.2004.12.004","volume":"6","author":"P.C. Chang","year":"2006","unstructured":"Chang, P.C., Liao, T.W.: Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Applied Soft Computing\u00a06, 198\u2013206 (2006)","journal-title":"Applied Soft Computing"},{"issue":"3","key":"7_CR8","doi-asserted-by":"publisher","first-page":"1254","DOI":"10.1016\/j.dss.2005.10.013","volume":"42","author":"P.C. Chang","year":"2006","unstructured":"Chang, P.C., Liu, C.H., Wang, Y.W.: A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry. Decision Support Systems\u00a042(3), 1254\u20131269 (2006)","journal-title":"Decision Support Systems"},{"issue":"1","key":"7_CR9","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/j.eswa.2005.01.018","volume":"29","author":"P.C. Chang","year":"2005","unstructured":"Chang, P.C., Lai, C.Y.: A hybrid system combining self-organizing maps with case-based reasoning in wholesaler\u2019s new-release book forecasting. Expert Systems with Applications\u00a029(1), 183\u2013192 (2005)","journal-title":"Expert Systems with Applications"},{"issue":"3","key":"7_CR10","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1016\/S1568-4946(02)00066-2","volume":"2","author":"T. Chen","year":"2003","unstructured":"Chen, T.: A fuzzy back propagation network for output time prediction in a wafer fab. Applied Soft Computing\u00a02(3), 211\u2013222 (2003)","journal-title":"Applied Soft Computing"},{"key":"7_CR11","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1023\/A:1024641507765","volume":"14","author":"T. Chen","year":"2003","unstructured":"Chen, T.: A fuzzy mid-term single-fab production planning model. Journal of Intelligent Manufacturing\u00a014, 273\u2013285 (2003)","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"7_CR12","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1007\/s11063-006-9027-4","volume":"24","author":"T. Chen","year":"2006","unstructured":"Chen, T.: A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Processing Letters\u00a024(3), 271\u2013288 (2006)","journal-title":"Neural Processing Letters"},{"key":"7_CR13","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"974","DOI":"10.1007\/11893295_107","volume-title":"Neural Information Processing","author":"T. Chen","year":"2006","unstructured":"Chen, T.: A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab. In: King, I., Wang, J., Chan, L.-W., Wang, D. (eds.) ICONIP 2006. LNCS, vol.\u00a04234, pp. 974\u2013982. Springer, Heidelberg (2006)"},{"key":"7_CR14","doi-asserted-by":"crossref","unstructured":"Chen, T.: A fuzzy\u2013neural approach for estimating the monthly output of a semiconductor manufacturing factory. International Journal of Advanced Manufacturing Technology (2007) (in press)","DOI":"10.1007\/s00170-007-1228-0"},{"key":"7_CR15","doi-asserted-by":"publisher","first-page":"575","DOI":"10.1007\/s00170-006-0741-x","volume":"35","author":"T. Chen","year":"2007","unstructured":"Chen, T.: A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. International Journal of Advanced Manufacturing Technology\u00a035, 575\u2013586 (2007)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"7_CR16","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.aei.2006.10.002","volume":"21","author":"T. Chen","year":"2007","unstructured":"Chen, T.: An intelligent hybrid system for wafer lot output time prediction. Advanced Engineering Informatics\u00a021, 55\u201365 (2007)","journal-title":"Advanced Engineering Informatics"},{"key":"7_CR17","doi-asserted-by":"publisher","first-page":"2153","DOI":"10.1016\/j.fss.2007.04.013","volume":"158","author":"T. Chen","year":"2007","unstructured":"Chen, T.: Incorporating fuzzy c-means and a back-propagation network ensemble to job completion time prediction in a semiconductor fabrication factory. Fuzzy Sets and Systems\u00a0158, 2153\u20132168 (2007)","journal-title":"Fuzzy Sets and Systems"},{"issue":"4","key":"7_CR18","doi-asserted-by":"publisher","first-page":"784","DOI":"10.1109\/TSMCB.2007.895364","volume":"37","author":"T. Chen","year":"2007","unstructured":"Chen, T.: Predicting wafer lot output time with a hybrid FCM-FBPN approach. IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics\u00a037(4), 784\u2013793 (2007)","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics"},{"key":"7_CR19","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1016\/j.cie.2008.01.004","volume":"55","author":"T. Chen","year":"2008","unstructured":"Chen, T.: A fuzzy-neural and multiple-bucket approach for estimating lot cycle time in a wafer fab with dynamic product mix. Computers & Industrial Engineering\u00a055, 423\u2013438 (2008)","journal-title":"Computers & Industrial Engineering"},{"key":"7_CR20","doi-asserted-by":"publisher","first-page":"3193","DOI":"10.1016\/j.neucom.2008.04.040","volume":"71","author":"T. Chen","year":"2008","unstructured":"Chen, T.: A hybrid fuzzy-neural approach to job completion time prediction in a semiconductor fabrication factory. Neurocomputing\u00a071, 3193\u20133201 (2008)","journal-title":"Neurocomputing"},{"issue":"7-8","key":"7_CR21","doi-asserted-by":"publisher","first-page":"782","DOI":"10.1007\/s00170-007-1007-y","volume":"37","author":"T. Chen","year":"2008","unstructured":"Chen, T.: A SOM-FBPN-ensemble approach with error feedback to adjust classification for wafer-lot completion time prediction. International Journal of Advanced Manufacturing Technology\u00a037(7-8), 782\u2013792 (2008)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"7_CR22","doi-asserted-by":"publisher","first-page":"570","DOI":"10.1007\/s00170-006-0869-8","volume":"36","author":"T. Chen","year":"2008","unstructured":"Chen, T., Jeang, A., Wang, Y.C.: A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant. International Journal of Advanced Manufacturing Technology\u00a036, 570\u2013581 (2008)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"7_CR23","first-page":"277","volume":"4","author":"T. Chen","year":"1998","unstructured":"Chen, T., Wang, M.J.J.: A fuzzy production planning model for a semiconductor fabrication plant. International Journal of Operations and Quantitative Management\u00a04(3), 277\u2013292 (1998)","journal-title":"International Journal of Operations and Quantitative Management"},{"key":"7_CR24","doi-asserted-by":"crossref","unstructured":"Chen, T., Wang, Y.C., Tsai, H.R.: Lot cycle time prediction in a ramping-up semiconductor manufacturing factory with a SOM-FBPN-ensemble approach with multiple buckets and partial normalization. International Journal of Advanced Manufacturing Technology (2008) (in press)","DOI":"10.1007\/s00170-008-1665-4"},{"key":"7_CR25","unstructured":"Chen, T., Wang, Y.C., Wu, H.C.: A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory \u2013 a simulation study. International Journal of Innovative Computing, Information and Control (2008) (in press)"},{"key":"7_CR26","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/S0893-6080(98)00005-7","volume":"11","author":"J.H. Chiang","year":"1998","unstructured":"Chiang, J.H.: A hybrid neural network model in handwritten word recognition. Neural Networks\u00a011, 337\u2013346 (1998)","journal-title":"Neural Networks"},{"issue":"4","key":"7_CR27","doi-asserted-by":"publisher","first-page":"278","DOI":"10.1109\/3476.650959","volume":"20","author":"S.H. Chung","year":"1997","unstructured":"Chung, S.H., Yang, M.H., Cheng, C.M.: The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories. IEEE Transactions on Components, Packaging, and Manufacturing Technology \u2013 Part C\u00a020(4), 278\u2013287 (1997)","journal-title":"IEEE Transactions on Components, Packaging, and Manufacturing Technology \u2013 Part C"},{"issue":"4","key":"7_CR28","doi-asserted-by":"publisher","first-page":"293","DOI":"10.1016\/0098-1354(92)80049-F","volume":"16","author":"W.R. Foster","year":"1992","unstructured":"Foster, W.R., Gollopy, F., Ungar, L.H.: Neural network forecasting of short, noisy time series. Computers in Chemical Engineering\u00a016(4), 293\u2013297 (1992)","journal-title":"Computers in Chemical Engineering"},{"key":"7_CR29","volume-title":"Genetic algorithms in search, optimization, and machine learning","author":"D.E. Goldberg","year":"1989","unstructured":"Goldberg, D.E.: Genetic algorithms in search, optimization, and machine learning. Addison-Wesley, Reading (1989)"},{"key":"7_CR30","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(01)00181-3","volume":"139","author":"V. Gordon","year":"2002","unstructured":"Gordon, V., Proth, J.M., Chu, C.: A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research\u00a0139, 1\u201325 (2002)","journal-title":"European Journal of Operational Research"},{"key":"7_CR31","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/S0736-5845(02)00078-9","volume":"19","author":"M. Haller","year":"2003","unstructured":"Haller, M., Peikert, A., Thoma, J.: Cycle time management during production ramp-up. Robotics and Computer Integrated Manufacturing\u00a019, 183\u2013188 (2003)","journal-title":"Robotics and Computer Integrated Manufacturing"},{"issue":"9-10","key":"7_CR32","doi-asserted-by":"publisher","first-page":"768","DOI":"10.1007\/s00170-003-1644-8","volume":"23","author":"S.Y. Hsu","year":"2004","unstructured":"Hsu, S.Y., Sha, D.Y.: Due date assignment in wafer fabrication using artificial neural network. International Journal of Advanced Manufacturing Technology\u00a023(9-10), 768\u2013775 (2004)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"7_CR33","unstructured":"Hung, Y.F., Chang, C.B.: Dispatching rules using flow time predictions for semiconductor wafer fabrications. In: Proceedings of the 5th Annual International Conference on Industrial Engineering Theory Applications and Practice, Taiwan (2001)"},{"issue":"1","key":"7_CR34","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/0165-0114(92)90032-Y","volume":"52","author":"H. Ishibuchi","year":"1992","unstructured":"Ishibuchi, H., Nozaki, K., Tanaka, H.: Distributed representation of fuzzy rules and its application to pattern classification. Fuzzy Sets and Systems\u00a052(1), 21\u201332 (1992)","journal-title":"Fuzzy Sets and Systems"},{"key":"7_CR35","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1007\/s11063-004-2022-8","volume":"20","author":"Y. Jiang","year":"2004","unstructured":"Jiang, Y., Zhou, Z.H.: SOM ensemble-based image segmentation. Neural Processing Letters\u00a020, 171\u2013178 (2004)","journal-title":"Neural Processing Letters"},{"issue":"3-4","key":"7_CR36","doi-asserted-by":"publisher","first-page":"252","DOI":"10.1007\/s00170-006-0612-5","volume":"34","author":"K.C. Ku","year":"2007","unstructured":"Ku, K.C., Kao, H.P., Gurumurthy, C.K.: A collaborative model for capacity expansion of the IC foundry industry. International Journal of Advanced Manufacturing Technology\u00a034(3-4), 252\u2013261 (2007)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"7_CR37","unstructured":"Lin, C.Y.: Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction. Ph.D. Dissertation Engineering-Industrial Engineering and Operations Research University of California, Berkeley (1996)"},{"key":"7_CR38","doi-asserted-by":"publisher","first-page":"383","DOI":"10.1287\/opre.9.3.383","volume":"9","author":"J.D.C. Little","year":"1961","unstructured":"Little, J.D.C.: A proof of the queueing formula L = \u03bb W. Operations Research\u00a09, 383\u2013387 (1961)","journal-title":"Operations Research"},{"issue":"1-2","key":"7_CR39","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1007\/s00170-002-1506-9","volume":"23","author":"P.F. Pai","year":"2004","unstructured":"Pai, P.F., Lee, C.E., Su, T.H.: A daily production model for wafer fabrication. International Journal of Advanced Manufacturing Technology\u00a023(1-2), 58\u201363 (2004)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"7_CR40","doi-asserted-by":"publisher","first-page":"310","DOI":"10.1016\/S0377-2217(97)00398-6","volume":"112","author":"S. Piramuthu","year":"1991","unstructured":"Piramuthu, S.: Theory and methodology \u2013 financial credit-risk evaluation with neural and neuralfuzzy systems. European Journal of Operational Research\u00a0112, 310\u2013321 (1991)","journal-title":"European Journal of Operational Research"},{"key":"7_CR41","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/0272-6963(84)90005-6","volume":"5","author":"G.L. Ragatz","year":"1984","unstructured":"Ragatz, G.L., Mabert, V.A.: A simulation analysis of due date assignment. Journal of Operations Management\u00a05, 27\u201339 (1984)","journal-title":"Journal of Operations Management"},{"key":"7_CR42","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1080\/10255810213480","volume":"4","author":"M.K. Tiwari","year":"2002","unstructured":"Tiwari, M.K., Roy, D.: Minimization of internal shrinkage in casting using synthesis of neural network. International Journal of Smart Engineering System Design\u00a04, 205\u2013214 (2002)","journal-title":"International Journal of Smart Engineering System Design"},{"issue":"7","key":"7_CR43","doi-asserted-by":"publisher","first-page":"1361","DOI":"10.1080\/00207549108948016","volume":"29","author":"M.M. Vig","year":"1991","unstructured":"Vig, M.M., Dooley, K.J.: Dynamic rules for due-date assignment. International Journal of Production Research\u00a029(7), 1361\u20131377 (1991)","journal-title":"International Journal of Production Research"},{"issue":"9-10","key":"7_CR44","doi-asserted-by":"publisher","first-page":"1008","DOI":"10.1007\/s00170-006-0884-9","volume":"34","author":"C.N. Wang","year":"2007","unstructured":"Wang, C.N., Wang, C.H.: A simulated model for cycle time reduction by acquiring optimal lot size in semiconductor manufacturing. International Journal of Advanced Manufacturing Technology\u00a034(9-10), 1008\u20131015 (2007)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"6","key":"7_CR45","doi-asserted-by":"publisher","first-page":"1414","DOI":"10.1109\/21.199466","volume":"22","author":"L.X. Wang","year":"1992","unstructured":"Wang, L.X., Mendel, J.M.: Generating fuzzy rules by learning from examples. IEEE Transactions on Systems, Man, and Cybernetics\u00a022(6), 1414\u20131427 (1992)","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"key":"7_CR46","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1287\/mnsc.25.4.363","volume":"25","author":"J.K. Weeks","year":"1979","unstructured":"Weeks, J.K.: A simulation study of predictable due-dates. Management Science\u00a025, 363\u2013373 (1979)","journal-title":"Management Science"},{"key":"7_CR47","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1109\/34.85677","volume":"13","author":"X.L. Xie","year":"1991","unstructured":"Xie, X.L., Beni, G.: A validity measure for fuzzy clustering. IEEE Transactions of Pattern Analysis and Machine Intelligence\u00a013, 841\u2013847 (1991)","journal-title":"IEEE Transactions of Pattern Analysis and Machine Intelligence"}],"container-title":["Studies in Fuzziness and Soft Computing","Production Engineering and Management under Fuzziness"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-12052-7_7.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,24]],"date-time":"2020-11-24T02:47:20Z","timestamp":1606186040000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-12052-7_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642120510","9783642120527"],"references-count":47,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-12052-7_7","relation":{},"ISSN":["1434-9922","1860-0808"],"issn-type":[{"type":"print","value":"1434-9922"},{"type":"electronic","value":"1860-0808"}],"subject":[],"published":{"date-parts":[[2010]]}}}