{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T17:01:17Z","timestamp":1725555677094},"publisher-location":"Berlin, Heidelberg","reference-count":56,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642120510"},{"type":"electronic","value":"9783642120527"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-12052-7_8","type":"book-chapter","created":{"date-parts":[[2010,5,17]],"date-time":"2010-05-17T10:30:04Z","timestamp":1274092204000},"page":"143-170","source":"Crossref","is-referenced-by-count":3,"title":["Fuzzy Project Scheduling"],"prefix":"10.1007","author":[{"given":"Na\u00efm","family":"Yalaoui","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fr\u00e9d\u00e9ric","family":"Dugardin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Farouk","family":"Yalaoui","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lionel","family":"Amodeo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Halim","family":"Mahdi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"2","key":"8_CR1","doi-asserted-by":"publisher","first-page":"312","DOI":"10.1016\/S0377-2217(02)00563-5","volume":"147","author":"S. Allet","year":"2003","unstructured":"Allet, S.: Handling flexibility in a generalised job shop with a fuzzy approach. European Journal of Operational Research\u00a0147(2), 312\u2013333 (2003)","journal-title":"European Journal of Operational Research"},{"key":"8_CR2","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/0377-2217(95)00006-C","volume":"83","author":"M. Widmer","year":"1995","unstructured":"Widmer, M., Bugnon, B., Stoffel, K.: Fun: A dynamic method for scheduling problems. European Journal of Operational Research\u00a083, 271\u2013282 (1995)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"8_CR3","doi-asserted-by":"publisher","first-page":"651","DOI":"10.1016\/S0377-2217(03)00434-X","volume":"159","author":"S. Bertel","year":"2004","unstructured":"Bertel, S., Billaut, J.-C.: A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. European Journal of Operational Research\u00a0159(3), 651\u2013662 (2004)","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"8_CR4","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/S0952-1976(97)80003-6","volume":"10","author":"F.T.S. Chan","year":"1997","unstructured":"Chan, F.T.S., Kazerooni, A., Abhary, K.: A fuzzy approach to operation selection. Engineering Applications of Artificial Intelligence\u00a010(4), 345\u2013356 (1997)","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"11-12","key":"8_CR5","doi-asserted-by":"publisher","first-page":"1186","DOI":"10.1007\/s00170-005-0017-x","volume":"29","author":"J. Chen","year":"2006","unstructured":"Chen, J.: A branch and bound procedure for the reentrant permutation flow-shop scheduling problem. International Journal of Advanced Manufacturing Technology\u00a029(11-12), 1186\u20131193 (2006)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3-4","key":"8_CR6","doi-asserted-by":"publisher","first-page":"344","DOI":"10.1007\/s00170-007-1227-1","volume":"39","author":"J.C. Chen","year":"2008","unstructured":"Chen, J.C., Chen, K.H., Wu, J.J., Chen, C.W.: A study of the flexible job shop scheduling problem with parallel machines and reentrant process. International Journal of Advanced Manufacturing Technology\u00a039(3-4), 344\u2013354 (2008)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"8_CR7","doi-asserted-by":"publisher","first-page":"353","DOI":"10.1007\/s00170-006-0607-2","volume":"34","author":"J.-S. Chen","year":"2007","unstructured":"Chen, J.-S., Pan, J.C.-H., Wu, C.-K.: Minimizing makespan in reentrant flow-shops using hybrid tabu search. The International Journal of Advanced Manufacturing Technology\u00a034(3), 353\u2013361 (2007)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"11","key":"8_CR8","doi-asserted-by":"publisher","first-page":"2149","DOI":"10.1080\/00207540500050071","volume":"43","author":"S. Choi","year":"2005","unstructured":"Choi, S., Kim, Y., Lee, G.: Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop. International Journal of Production Research\u00a043(11), 2149\u20132167 (2005)","journal-title":"International Journal of Production Research"},{"key":"8_CR9","doi-asserted-by":"crossref","unstructured":"Choi, S.W., Kim, H.Y., Lee, D.H., Yoon, J., Yun, C.Y., Chae, K.B.: Scheduling algorithms for two-stage re-entrant hybrid flow shops: minimizing makespan under the maximum allowable due dates. International Journal of advanced Manufacturing Technology (2008), doi:10.1007\/s00170-008-1656-5","DOI":"10.1007\/s00170-008-1656-5"},{"issue":"3","key":"8_CR10","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1016\/0305-0548(96)81768-0","volume":"23","author":"M.A. Coffin","year":"1996","unstructured":"Coffin, M.A., Taylor, B.W.: Multiple criteria R & D project selection and scheduling using fuzzy logic. Computers & Operations Research\u00a023(3), 207\u2013220 (1996)","journal-title":"Computers & Operations Research"},{"issue":"2","key":"8_CR11","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K. Deb","year":"2002","unstructured":"Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation\u00a06(2), 182\u2013197 (2002)","journal-title":"IEEE Transactions on Evolutionary Computation"},{"issue":"3","key":"8_CR12","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1002\/(SICI)1099-1425(200005\/06)3:3<155::AID-JOS39>3.0.CO;2-E","volume":"3","author":"E. Demirkol","year":"2000","unstructured":"Demirkol, E., Uzsoy, R.: Decomposition methods for re-entrant flow shops with sequence-dependent setup times. Journal of Scheduling\u00a03(3), 155\u2013177 (2000)","journal-title":"Journal of Scheduling"},{"key":"8_CR13","doi-asserted-by":"crossref","unstructured":"Dhaenens, C., Lemesre, J., Talbi, E.G.: K-ppm: A new exact method to solve multi-objective combinatorial optimization problems. European Journal of Operational Research (2009) (in press)","DOI":"10.1016\/j.ejor.2008.12.034"},{"issue":"1","key":"8_CR14","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1109\/4235.585892","volume":"1","author":"M. Dorigo","year":"1997","unstructured":"Dorigo, M., Gambardella, L.M.: Ant colony system: A cooperative learning approach to the traveling salesman problem. IEEE Transactions on Evolutionary Computation\u00a01(1), 53\u201366 (1997)","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"8_CR15","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1023\/A:1018927407164","volume":"86","author":"I.G. Drobouchevitch","year":"1999","unstructured":"Drobouchevitch, I.G., Strusevich, V.A.: A heuristic algorithm for two-machines re-entrant shop scheduling. Annals of Operation Research\u00a086, 417\u2013439 (1999)","journal-title":"Annals of Operation Research"},{"key":"8_CR16","doi-asserted-by":"crossref","unstructured":"Dugardin, F., Amodeo, L., Yalaoui, F.: M\u00e9thodes multi-objectif pour l\u2019ordonancement de lignes r\u00e9entrantes. Journal of decision system, 231\u2013255 (2008)","DOI":"10.3166\/jds.18.231-255"},{"key":"8_CR17","doi-asserted-by":"crossref","unstructured":"Dugardin, F., Amodeo, L., Yalaoui, F.: Multiobjective scheduling of a reentrant hybrid flowshop. In: 39th International Conference on Computers & Industrial Engineering (CIE39), pp. 193\u2013198 (2009)","DOI":"10.1109\/ICCIE.2009.5223775"},{"key":"8_CR18","first-page":"273","volume":"16","author":"F. Dugardin","year":"2007","unstructured":"Dugardin, F., Chehade, H., Amodeo, L., Yalaoui, F., Prins, C.: Hybrid Job Shop and parallel machine scheduling problems: minimization of total tardiness criterion. Advanced Robotic System Journal, ch.16, 273\u2013292 (2007) ISBN: 978-3-902613-02-8","journal-title":"Advanced Robotic System Journal"},{"key":"8_CR19","doi-asserted-by":"crossref","unstructured":"Dugardin, F., Yalaoui, F., Amodeo, L.: Reentrant lines scheduling and lorenz dominance: a comparative study. In: Computational Intelligence in decision and control (Proceedings of the 8th International FLINS Conference), pp. 707\u2013712 (2008) ISBN 978-981-279-946-3","DOI":"10.1142\/9789812799470_0116"},{"key":"8_CR20","doi-asserted-by":"crossref","unstructured":"Dugardin, F., Yalaoui, F., Amodeo, L.: New multiobjective method to solve reentrant hybrid flow shop scheduling problem. European Journal of Operational Research (2009) (available online)","DOI":"10.1109\/ICCIE.2009.5223775"},{"key":"8_CR21","volume-title":"Modern Heuristic Techniques for Combinatorial Problems","author":"F. Glover","year":"1993","unstructured":"Glover, F., Laguna, M.: Tabu search. In: Reeves, C. (ed.) Modern Heuristic Techniques for Combinatorial Problems, Oxford, England. Blackwell Scientific Publishing, Malden (1993)"},{"key":"8_CR22","unstructured":"Goldberg, D.E.: Genetic algorithms and rule learning in dynamic system control. In: Proc. of the International Conference on Genetic Algorithms and Their Applications, Pittsburgh, PA, pp. 8\u201315 (1985)"},{"issue":"2","key":"8_CR23","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/0167-9236(95)00003-8","volume":"16","author":"B. Grabot","year":"1996","unstructured":"Grabot, B., Blanc, J.-C., Binda, C.: A decision support system for production activity control. Decision Support Systems\u00a016(2), 87\u2013101 (1996)","journal-title":"Decision Support Systems"},{"issue":"4","key":"8_CR24","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1016\/0272-6963(83)90004-9","volume":"3","author":"S.C. Graves","year":"1983","unstructured":"Graves, S.C., Meal, H.C., Stefek, D., Hamid, A.: Scheduling of re-entrant flow shop. Journal of Operations Management\u00a03(4), 197\u2013207 (1983)","journal-title":"Journal of Operations Management"},{"issue":"11","key":"8_CR25","doi-asserted-by":"publisher","first-page":"1409","DOI":"10.1007\/s00170-004-2114-7","volume":"26","author":"A.K. Gupta","year":"2005","unstructured":"Gupta, A.K., Sivakumar, A.I.: Conjunctive simulated scheduling. International Journal of Advanced Manufacturing Technology\u00a026(11), 1409\u20131413 (2005)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"8_CR26","doi-asserted-by":"publisher","first-page":"1163","DOI":"10.1007\/s00170-004-2296-z","volume":"27","author":"A.K. Gupta","year":"2006","unstructured":"Gupta, A.K., Sivakumar, A.I.: Job shop scheduling techniques in semi conductor manufacturing. International Journal of Advanced Manufacturing Technologies\u00a027, 1163\u20131169 (2006)","journal-title":"International Journal of Advanced Manufacturing Technologies"},{"issue":"4","key":"8_CR27","doi-asserted-by":"publisher","first-page":"553","DOI":"10.1109\/TASE.2007.906342","volume":"4","author":"B.-W. Hsieh","year":"2007","unstructured":"Hsieh, B.-W., Chen, C.-H., Chang, S.-C.: Efficient simulation-based composition of scheduling policies by integrating ordinal optimization with design of experiment. IEEE Transactions on Automation Science and Engineering\u00a04(4), 553\u2013568 (2007)","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"9","key":"8_CR28","doi-asserted-by":"publisher","first-page":"2435","DOI":"10.1080\/002075498192616","volume":"36","author":"H. Hwang","year":"1998","unstructured":"Hwang, H., Sun, J.U.: Production sequencing problem with re-entrant work flows and sequence dependent setup times. International Journal of Production Research\u00a036(9), 2435\u20132450 (1998)","journal-title":"International Journal of Production Research"},{"issue":"9","key":"8_CR29","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S.M. Johnson","year":"1954","unstructured":"Johnson, S.M.: Optimal two- and three-stage production schedules with set up times included. Nav. Res. Logistics Q\u00a01(9), 61\u201368 (1954)","journal-title":"Nav. Res. Logistics Q"},{"issue":"5","key":"8_CR30","doi-asserted-by":"publisher","first-page":"566","DOI":"10.1007\/s00170-006-0736-7","volume":"35","author":"Y.-H. Kang","year":"2007","unstructured":"Kang, Y.-H., Kim, S.-S., Shin, H.J.: A scheduling algorithm for the reentrant shop: an application in semiconductor manufacture. The International Journal of Advanced Manufacturing Technology\u00a035(5), 566\u2013574 (2007)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"8_CR31","doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R.: Particle swarm optimization. In: IEEE Int. Conf. on Neural Networks, pp. 1942\u20131948 (1995)","DOI":"10.1109\/ICNN.1995.488968"},{"key":"8_CR32","doi-asserted-by":"publisher","first-page":"216","DOI":"10.1016\/j.ejor.2005.01.030","volume":"174","author":"G. Koole","year":"2006","unstructured":"Koole, G., Pot, A.: Workload minimization in re-entrant lines. European Journal of Operational Research\u00a0174, 216\u2013233 (2006)","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"8_CR33","doi-asserted-by":"publisher","first-page":"764","DOI":"10.1287\/opre.44.5.764","volume":"44","author":"W. Kubiak","year":"1996","unstructured":"Kubiak, W., Lou, S.X.C., Wang, Y.: Mean flow time minimization in re-entrant job-shops with a hub. Operations Research\u00a044(5), 764\u2013776 (1996)","journal-title":"Operations Research"},{"key":"8_CR34","doi-asserted-by":"crossref","unstructured":"Lau, H.C.W., Chan, T.M., Tsui, W.T., Ho, G.T.S.: Cost optimization of the supply chain network using genetic algorithms. IEEE Transactions on Knowledge and Data Engineering\u00a099(1) (2009)","DOI":"10.1109\/TKDE.2009.20"},{"issue":"3","key":"8_CR35","doi-asserted-by":"publisher","first-page":"374","DOI":"10.1109\/66.311341","volume":"7","author":"S.C.H. Lu","year":"1994","unstructured":"Lu, S.C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semi conductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing\u00a07(3), 374\u2013388 (1994)","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"8_CR36","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/j.cie.2008.05.002","volume":"56","author":"A. Manikas","year":"2008","unstructured":"Manikas, A., Chang, Y.L.: Multi-criteria sequence-dependent job shop scheduling using genetic algorithms. Computers and Industrial Engineering\u00a056(1), 179\u2013185 (2008)","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"8_CR37","doi-asserted-by":"publisher","first-page":"644","DOI":"10.1016\/j.ejor.2004.07.013","volume":"167","author":"G. Miragliotta","year":"2005","unstructured":"Miragliotta, G., Perona, M.: Decentralised, multi-objective driven scheduling for reentrant shops: A conceptual development and a test case. European Journal of Operational Research\u00a0167(3), 644\u2013662 (2005)","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"8_CR38","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1080\/09511920500504321","volume":"4","author":"G. Mohammadi","year":"2006","unstructured":"Mohammadi, G., Ozbayrak, M.: Scheduling mixed-model final assembly lines in jit manufacturing. International Journal of Computer Integrated Manufacturing\u00a04(6), 377\u2013382 (2006)","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"3","key":"8_CR39","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1016\/j.cie.2005.06.004","volume":"49","author":"L. M\u00f6nch","year":"2005","unstructured":"M\u00f6nch, L., Drieel, R.: A distributed shifting bottleneck heuristic for complex job shops. Computers and Industrial Engineering\u00a049(3), 363\u2013380 (2005)","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"8_CR40","doi-asserted-by":"publisher","first-page":"2100","DOI":"10.1016\/j.ejor.2005.12.020","volume":"177","author":"L. M\u00f6nch","year":"2007","unstructured":"M\u00f6nch, L., Schabacker, R., Pabst, D., Fowler, J.W.: Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. European Journal of Operational Research\u00a0177(3), 2100\u20132118 (2007)","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"8_CR41","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M. Nawaz","year":"1983","unstructured":"Nawaz, M., Enscore, E.E., Ham, I.: A heuristic algorithm for the m-machine, n-job flow-shop scheduling problem. Omega\u00a011(5), 91\u201395 (1983)","journal-title":"Omega"},{"key":"8_CR42","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/0278-6125(94)90023-X","volume":"13","author":"I.M. Ovacik","year":"1994","unstructured":"Ovacik, I.M., Uzsoy, R.: Exploiting shop stage status information to schedule complex job shops. Journal Manufacturing System\u00a013, 73\u201384 (1994)","journal-title":"Journal Manufacturing System"},{"issue":"4","key":"8_CR43","first-page":"313","volume":"11","author":"J.C.-H. Pan","year":"2004","unstructured":"Pan, J.C.-H., Chen, J.-S.: A comparative study of schedule generation procedures for the re-entrant shops. International Journal of Industrial Engineering - Theory, Applications and Practice\u00a011(4), 313\u2013321 (2004)","journal-title":"International Journal of Industrial Engineering - Theory, Applications and Practice"},{"key":"8_CR44","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1016\/j.cor.2003.10.004","volume":"32","author":"J.C.-H. Pan","year":"2005","unstructured":"Pan, J.C.-H., Chen, J.-S.: Mixed binary integer programming formulations for the reentrant job shop scheduling problem. Computer and Operations Research\u00a032, 1197\u20131212 (2005)","journal-title":"Computer and Operations Research"},{"issue":"5","key":"8_CR45","doi-asserted-by":"publisher","first-page":"637","DOI":"10.1057\/palgrave.jors.2602354","volume":"59","author":"W.L. Pearn","year":"2008","unstructured":"Pearn, W.L., Chung, S.H., Yang, M.H., Shiao, K.P.: Solution strategies for multi-stage wafer probing scheduling problem with reentry. Journal of the Operational Research Society\u00a059(5), 637\u2013651 (2008)","journal-title":"Journal of the Operational Research Society"},{"key":"8_CR46","unstructured":"Riise, A.: Comparing genetic algorithms and tabu search for multi-objective optimization. In: IFORS, Abstract conference proceedings, p. 29 (2002)"},{"issue":"2","key":"8_CR47","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1016\/0165-0114(95)00168-9","volume":"78","author":"W. Slany","year":"1996","unstructured":"Slany, W.: Scheduling as a fuzzy multiple criteria optimization problem. Fuzzy Sets and Systems\u00a078(2), 197\u2013222 (1996)","journal-title":"Fuzzy Sets and Systems"},{"issue":"1","key":"8_CR48","doi-asserted-by":"publisher","first-page":"433","DOI":"10.1016\/j.cie.2008.07.004","volume":"56","author":"A. Suhail","year":"2009","unstructured":"Suhail, A., Khan, Z.A.: Fuzzy production control with limited resources and response delay. Computers & Industrial Engineering\u00a056(1), 433\u2013443 (2009)","journal-title":"Computers & Industrial Engineering"},{"key":"8_CR49","doi-asserted-by":"publisher","first-page":"702","DOI":"10.1287\/opre.45.5.702","volume":"45","author":"M.Y. Wang","year":"1997","unstructured":"Wang, M.Y., Sethi, S.P., Van De Velde, S.L.: Minimizing makespan in a class of re-entrant shops. Operation Research\u00a045, 702\u2013712 (1997)","journal-title":"Operation Research"},{"key":"8_CR50","unstructured":"Wang, Z., Qiao, F., Wu, Q.: A new compound priority control strategy in semiconductor wafer fabrication. Networking, Sensing and Control, 80\u201383 (2005)"},{"issue":"1","key":"8_CR51","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1016\/j.ijpe.2004.11.002","volume":"100","author":"F. Yalaoui","year":"2006","unstructured":"Yalaoui, F., Chu, C.: New exact method to solve the pm\/r j \/\u2211\u2009C j schedule problem. International Journal of Production Economics\u00a0100(1), 168\u2013179 (2006)","journal-title":"International Journal of Production Economics"},{"key":"8_CR52","doi-asserted-by":"crossref","unstructured":"Yalaoui, N., Amodeo, L., Mahdi, H., Yalaoui, F.: Hybrid method to solve a facility layout problem: Genetic algorithm - particle swarm optimization. In: 13 th IFAC on Information Control Problems in Manufacturing, INCOM 2009 (2009) (DVD-rom)","DOI":"10.3182\/20090603-3-RU-2001.0336"},{"issue":"3","key":"8_CR53","doi-asserted-by":"publisher","first-page":"1160","DOI":"10.1016\/j.ejor.2006.06.065","volume":"187","author":"D.-L. Yang","year":"2008","unstructured":"Yang, D.-L., Kuo, W.-H., Chern, M.-S.: Multi-family scheduling in a two-machine reentrant flow shop with setups. European Journal of Operational Research\u00a0187(3), 1160\u20131170 (2008)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"8_CR54","doi-asserted-by":"publisher","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"L.A. Zadeh","year":"1965","unstructured":"Zadeh, L.A.: Fuzzy sets. Information and Control\u00a08(3), 338\u2013353 (1965)","journal-title":"Information and Control"},{"key":"8_CR55","unstructured":"Zitzler, E., Laumanns, M., Thiele, L.: SPEA2: Improving the Strength Pareto Evolutionary Algorithm. Technical Report 103, Computer Engineering and Networks Laboratory (TIK), ETH Zurich, Zurich, Switzerland (2001)"},{"issue":"2","key":"8_CR56","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1109\/4235.797969","volume":"3","author":"E. Zitzler","year":"1999","unstructured":"Zitzler, E., Thiele, L.: Multi objective evolutionary algorithms: a comparative study and strength pareto approach. IEEE Transaction on Evolutionary Computation\u00a03(2), 257\u2013271 (1999)","journal-title":"IEEE Transaction on Evolutionary Computation"}],"container-title":["Studies in Fuzziness and Soft Computing","Production Engineering and Management under Fuzziness"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-12052-7_8.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,24]],"date-time":"2020-11-24T02:47:21Z","timestamp":1606186041000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-12052-7_8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642120510","9783642120527"],"references-count":56,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-12052-7_8","relation":{},"ISSN":["1434-9922","1860-0808"],"issn-type":[{"type":"print","value":"1434-9922"},{"type":"electronic","value":"1860-0808"}],"subject":[],"published":{"date-parts":[[2010]]}}}