{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T19:35:04Z","timestamp":1777664104259,"version":"3.51.4"},"publisher-location":"Berlin, Heidelberg","reference-count":11,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642139345","type":"print"},{"value":"9783642139352","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-13935-2_15","type":"book-chapter","created":{"date-parts":[[2010,7,20]],"date-time":"2010-07-20T10:46:31Z","timestamp":1279622791000},"page":"323-339","source":"Crossref","is-referenced-by-count":5,"title":["The Use of Fuzzy Numbers in Practical Project Planning and Control"],"prefix":"10.1007","author":[{"given":"Dorota","family":"Kuchta","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"2","key":"15_CR1","doi-asserted-by":"publisher","first-page":"136","DOI":"10.1016\/j.ijproman.2005.07.003","volume":"24","author":"D.F. Cioffi","year":"2006","unstructured":"Cioffi, D.F.: Designing project management: A scientific notation and an improved formalism for earned value calculations. International Journal of Project Management\u00a024(2), 136\u2013144 (2006)","journal-title":"International Journal of Project Management"},{"issue":"2","key":"15_CR2","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1016\/S0165-0114(00)00076-2","volume":"122","author":"S. Chanas","year":"2001","unstructured":"Chanas, S., Zielinski, P.: Critical path analysis in the network with fuzzy activity times. Fuzzy Sets and Systems\u00a0122(2), 195\u2013204 (2001)","journal-title":"Fuzzy Sets and Systems"},{"key":"15_CR3","unstructured":"Da\u0142kowski, T.B., Kuchta, D.: Klasyczna i zmodyfikowana metoda Earned Value w zarz\u0105dzaniu projektami (Classic and modified Earned Value Method in project management, in Polish). Bad. Oper. Decyz. nb 3-4, pp. 35\u201352 (2001)"},{"issue":"7","key":"15_CR4","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/S0263-7863(00)00027-2","volume":"19","author":"N. Hardie","year":"2001","unstructured":"Hardie, N.: The prediction and control of project duration: a recursive model. International Journal of Project Management\u00a019(7), 401\u2013409 (2001)","journal-title":"International Journal of Project Management"},{"issue":"12","key":"15_CR5","first-page":"2222","volume":"4","author":"D. Kuchta","year":"2005","unstructured":"Kuchta, D.: Fuzzyfication of the earned value method. WSEAS Trans. Syst.\u00a04(12), 2222\u20132229 (2005)","journal-title":"WSEAS Trans. Syst."},{"issue":"11","key":"15_CR6","doi-asserted-by":"publisher","first-page":"1193","DOI":"10.1061\/(ASCE)0733-9364(2006)132:11(1193)","volume":"132","author":"J. Li","year":"2006","unstructured":"Li, J., Moselhi, O., Alksass, S.: Forecasting project status by using fuzzy logic. J. Constr. Engrg. and Mgmt.\u00a0132(11), 1193\u20131202 (2006)","journal-title":"J. Constr. Engrg. and Mgmt."},{"key":"15_CR7","unstructured":"Lipke, W., Zwikael, O., Henderson, K., Anbari, F.: Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management (in Press) (Available online April 8, 2008)"},{"issue":"4","key":"15_CR8","first-page":"684","volume":"3","author":"S. Noori","year":"2008","unstructured":"Noori, S., Bagherpour, M., Zareei, A.: Applying fuzzy control chart in Earned Value analysis. World Applied Science Journal\u00a03(4), 684\u2013690 (2008)","journal-title":"World Applied Science Journal"},{"issue":"4","key":"15_CR9","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.ijproman.2005.10.004","volume":"24","author":"S. Vandevoorde","year":"2006","unstructured":"Vandevoorde, S., Vanhoucke, M.: A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management\u00a024(4), 289\u2013302 (2006)","journal-title":"International Journal of Project Management"},{"issue":"1","key":"15_CR10","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/j.cie.2006.10.002","volume":"52","author":"S. Vonder van de","year":"2007","unstructured":"van de Vonder, S., Ballest\u00edn, F., Demeulemeester, E., Herroelen, W.: Heuristic procedures for reactive project scheduling. Computers & Industrial Engineering\u00a052(1), 11\u201328 (2007)","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"15_CR11","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/j.fss.2004.08.007","volume":"150","author":"P. Zielinski","year":"2005","unstructured":"Zielinski, P.: On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Sets and Systems\u00a0150(1), 53\u201376 (2005)","journal-title":"Fuzzy Sets and Systems"}],"container-title":["Studies in Fuzziness and Soft Computing","Fuzzy Optimization"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-13935-2_15.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T12:16:12Z","timestamp":1619784972000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-13935-2_15"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642139345","9783642139352"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-13935-2_15","relation":{},"ISSN":["1434-9922","1860-0808"],"issn-type":[{"value":"1434-9922","type":"print"},{"value":"1860-0808","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010]]}}}