{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,21]],"date-time":"2026-03-21T21:24:59Z","timestamp":1774128299224,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":25,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642143052","type":"print"},{"value":"9783642143069","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-14306-9_18","type":"book-chapter","created":{"date-parts":[[2010,6,29]],"date-time":"2010-06-29T14:20:26Z","timestamp":1277821226000},"page":"172-183","source":"Crossref","is-referenced-by-count":3,"title":["Solving the Problem of Flow Shop Scheduling by Neural Network Approach"],"prefix":"10.1007","author":[{"given":"Saeed","family":"Rouhani","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohammad","family":"Fathian","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mostafa","family":"Jafari","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Peyman","family":"Akhavan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"18_CR1","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-80693-3","volume-title":"Sequencing Theory","author":"S. Ashour","year":"1972","unstructured":"Ashour, S.: Sequencing Theory. Springer, Berlin (1972)"},{"key":"18_CR2","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1057\/jors.1966.25","volume":"17","author":"A.P.G. Brown","year":"1966","unstructured":"Brown, A.P.G., Lomnicki, Z.A.: Some applications of the branch and bound algorithm to the machine scheduling problem. Operational Research Quarterly\u00a017, 173\u2013186 (1966)","journal-title":"Operational Research Quarterly"},{"key":"18_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03612-9","volume-title":"Scheduling Algorithms","author":"P. Brucker","year":"1998","unstructured":"Brucker, P.: Scheduling Algorithms. Springer, Berlin (1998)"},{"key":"18_CR4","volume-title":"Theory of Scheduling","author":"R.L. Conway","year":"1967","unstructured":"Conway, R.L., Maxwell, W.L., Miller, L.W.: Theory of Scheduling. Addison Wesley, Reading (1967)"},{"key":"18_CR5","volume-title":"Deterministic and Stochastic Scheduling","year":"1982","unstructured":"Dempster, M.A.H., Lenstra, J.K., Rinnooy Kan, A.H.G. (eds.): Deterministic and Stochastic Scheduling. Reidel, Dordrecht (1982)"},{"key":"18_CR6","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1016\/j.cie.2004.05.005","volume":"46","author":"D.E. Akyol","year":"2004","unstructured":"Akyol, D.E.: Application of neural networks to heuristic scheduling algorithms. Computers & Industrial Engineering\u00a046, 679\u2013696 (2004)","journal-title":"Computers & Industrial Engineering"},{"key":"18_CR7","doi-asserted-by":"publisher","first-page":"474","DOI":"10.1016\/S0377-2217(99)00302-1","volume":"126","author":"A. El-Bouri","year":"2000","unstructured":"El-Bouri, A., Balakrishnan, S., Popplewell, N.: Jobs on a single machine: A neural network approach. European Journal of Operational Research\u00a0126, 474\u2013490 (2000)","journal-title":"European Journal of Operational Research"},{"key":"18_CR8","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1016\/j.cie.2005.04.001","volume":"49","author":"A. El-Bouri","year":"2005","unstructured":"El-Bouri, A., Balakrishnan, S., Popplewell, N.: A neural network to enhance local search in the permutation flowshop. Computers & Industrial Engineering\u00a049, 182\u2013196 (2005)","journal-title":"Computers & Industrial Engineering"},{"key":"18_CR9","doi-asserted-by":"publisher","first-page":"1243","DOI":"10.1057\/palgrave.jors.2601784","volume":"55","author":"J.M. Framinan","year":"2004","unstructured":"Framinan, J.M., Gupta, J.N.D., Leisten, R.: A review and classification of heuristics for permutation flow-shop scheduling with makespan objective. Journal of the Operational Research Society\u00a055, 1243\u20131255 (2004)","journal-title":"Journal of the Operational Research Society"},{"key":"18_CR10","volume-title":"Computers and Intractability: A Guide to the Theory of NP-completeness","author":"M.R. Garey","year":"1979","unstructured":"Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-completeness. W.H. Freeman and Company, San Francisco (1979)"},{"key":"18_CR11","doi-asserted-by":"publisher","first-page":"375","DOI":"10.1023\/B:JOSH.0000036861.28456.5d","volume":"7","author":"H.N. Geismar","year":"2004","unstructured":"Geismar, H.N., Dawande, M., Sriskandarajah, C.: Robotic cells with parallel machines: Throughput maximization in constant travel-time cells. Journal of Scheduling\u00a07, 375\u2013395 (2004)","journal-title":"Journal of Scheduling"},{"key":"18_CR12","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1080\/05695557208974823","volume":"4","author":"J.N.D. Gupta","year":"1972","unstructured":"Gupta, J.N.D.: Heuristic algorithms for multistage flowshop scheduling problem. AIIE Transactions\u00a04, 11\u201318 (1972)","journal-title":"AIIE Transactions"},{"key":"18_CR13","doi-asserted-by":"crossref","unstructured":"Gupta, J.N.D.: A review of flowshop scheduling research. In: Ritzman, L.P., Krajewski, L.J., Berry, W.L., Goodman, S.T., Hardy, S.T., Vitt, L.D. (eds.) Disaggregation Problems in Manufacturing and Service Organizations. Martinus Nijhoff, The Hague, pp. 363\u2013388 (1979)","DOI":"10.1007\/978-94-015-7636-9_23"},{"key":"18_CR14","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1287\/opre.13.3.400","volume":"13","author":"E. Ignall","year":"1965","unstructured":"Ignall, E., Schrage, L.: Application of branch-and-bound technique to some flow shop problems. Operations Research\u00a013, 400\u2013412 (1965)","journal-title":"Operations Research"},{"key":"18_CR15","doi-asserted-by":"publisher","first-page":"699","DOI":"10.1016\/j.ejor.2005.02.001","volume":"169","author":"J.N.D. Gupta","year":"2006","unstructured":"Gupta, J.N.D., Stafford Jr., E.F.: Flowshop scheduling research after five decades. European Journal of Operational Research\u00a0169, 699\u2013711 (2006)","journal-title":"European Journal of Operational Research"},{"key":"18_CR16","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S.M. Johnson","year":"1954","unstructured":"Johnson, S.M.: Optimal two- and three-stage production schedules with setup times included. Naval Research logistics Quarterly\u00a01, 61\u201368 (1954)","journal-title":"Naval Research logistics Quarterly"},{"key":"18_CR17","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1057\/jors.1965.7","volume":"16","author":"Z.A. Lomnicki","year":"1965","unstructured":"Lomnicki, Z.A.: A branch and bound algorithm for the exact solution of the three machine scheduling problem. Operational Research Quarterly\u00a016, 89\u2013100 (1965)","journal-title":"Operational Research Quarterly"},{"key":"18_CR18","doi-asserted-by":"publisher","first-page":"473","DOI":"10.1287\/opre.15.3.473","volume":"15","author":"G.B. McMahon","year":"1967","unstructured":"McMahon, G.B., Burton, P.G.: Flowshop scheduling with the branch and bound method. Operations Research\u00a015, 473\u2013481 (1967)","journal-title":"Operations Research"},{"key":"18_CR19","volume-title":"Heuristic Scheduling Systems","author":"T.E. Morton","year":"1993","unstructured":"Morton, T.E., Pentico, D.W.: Heuristic Scheduling Systems. Wiley, New York (1993)"},{"key":"18_CR20","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4613-1361-8","volume-title":"Meta-heuristics: Theory and Applications","author":"I.H. Osman","year":"1996","unstructured":"Osman, I.H., Kelly, J.P.: Meta-heuristics: Theory and Applications. Kluwer Academic Publishers, Boston (1996)"},{"key":"18_CR21","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C.N. Potts","year":"2000","unstructured":"Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: A review. European Journal of Operational Research\u00a0120, 228\u2013249 (2000)","journal-title":"European Journal of Operational Research"},{"key":"18_CR22","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1016\/j.ejor.2004.01.022","volume":"165","author":"R. Ruiz","year":"2005","unstructured":"Ruiz, R., Maroto, C., Alcaraz, J.: Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. European Journal of Operational Research\u00a0165, 34\u201354 (2005)","journal-title":"European Journal of Operational Research"},{"key":"18_CR23","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1016\/0377-2217(96)00041-0","volume":"93","author":"I. Sabuncuoglu","year":"1996","unstructured":"Sabuncuoglu, I., Gurgun, B.: A neural network model for scheduling problems. European Journal of Operational Research\u00a093, 288\u2013299 (1996)","journal-title":"European Journal of Operational Research"},{"key":"18_CR24","volume-title":"Scheduling Theory: Multi-stage Systems","author":"V.S. Tanaev","year":"1994","unstructured":"Tanaev, V.S., Sotskov, Y.N., Strusevich, V.A.: Scheduling Theory: Multi-stage Systems. Kluwer Academic Publishers, Dordrecht (1994)"},{"key":"18_CR25","doi-asserted-by":"publisher","first-page":"131","DOI":"10.1002\/nav.3800060205","volume":"6","author":"H.M. Wagner","year":"1959","unstructured":"Wagner, H.M.: An integer linear-programming model for machine scheduling. Naval Research Logistics Quarterly\u00a06, 131\u2013140 (1959)","journal-title":"Naval Research Logistics Quarterly"}],"container-title":["Communications in Computer and Information Science","Networked Digital Technologies"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-14306-9_18.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T12:23:42Z","timestamp":1619785422000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-14306-9_18"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642143052","9783642143069"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-14306-9_18","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010]]}}}