{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T17:35:27Z","timestamp":1725557727593},"publisher-location":"Berlin, Heidelberg","reference-count":23,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642143465"},{"type":"electronic","value":"9783642143472"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-14347-2_21","type":"book-chapter","created":{"date-parts":[[2010,6,20]],"date-time":"2010-06-20T20:11:27Z","timestamp":1277064687000},"page":"234-247","source":"Crossref","is-referenced-by-count":4,"title":["Disruption-Driven Resource Rescheduling in Software Development Processes"],"prefix":"10.1007","author":[{"given":"Junchao","family":"Xiao","sequence":"first","affiliation":[]},{"given":"Leon J.","family":"Osterweil","sequence":"additional","affiliation":[]},{"given":"Qing","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Mingshu","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"21_CR1","doi-asserted-by":"publisher","first-page":"2380","DOI":"10.1016\/j.ins.2006.12.020","volume":"177","author":"E. Alba","year":"2007","unstructured":"Alba, E., Chicano, J.F.: Software Project Management with GAs. Journal of Information Sciences\u00a0177, 2380\u20132401 (2007)","journal-title":"Journal of Information Sciences"},{"key":"21_CR2","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1007\/978-3-642-01680-6_7","volume-title":"Trustworthy Software Development Processes","author":"J. Xiao","year":"2009","unstructured":"Xiao, J., Wang, Q., Li, M., Yang, Q., Xie, L., Liu, D.: Value-based Multiple Software Projects Scheduling with Genetic Algorithm. In: Wang, Q., Garousi, V., Madachy, R., Pfahl, D. (eds.) ICSP 2009. LNCS, vol.\u00a05543, pp. 50\u201362. Springer, Heidelberg (2009)"},{"key":"21_CR3","volume-title":"Value-Based Software Engineering","author":"S. Biffl","year":"2005","unstructured":"Biffl, S., Aurum, A., Boehm, B., Erdogmus, H., Gr\u00fcnbacher, P.: Value-Based Software Engineering. Springer, Heidelberg (2005)"},{"key":"21_CR4","doi-asserted-by":"publisher","first-page":"3073","DOI":"10.1016\/j.cor.2007.01.010","volume":"35","author":"A. Barreto","year":"2008","unstructured":"Barreto, A., Barros, M.d.O., Werner, C.M.L.: Staffing a software project: A constraint satisfaction and optimization-based approach. Computer & Operations Research\u00a035, 3073\u20133089 (2008)","journal-title":"Computer & Operations Research"},{"key":"21_CR5","doi-asserted-by":"publisher","first-page":"1011","DOI":"10.1016\/j.ejor.2006.03.059","volume":"185","author":"D.-N. Pham","year":"2008","unstructured":"Pham, D.-N., Klinkert, A.: Surgical case scheduling as a generalized job shop scheduling problem. European Journal of Operational Research\u00a0185, 1011\u20131025 (2008)","journal-title":"European Journal of Operational Research"},{"key":"21_CR6","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1016\/j.ejor.2006.06.074","volume":"189","author":"J.F. Goncalves","year":"2008","unstructured":"Goncalves, J.F., Mendes, J.J.M., Resende, M.G.C.: A Genetic Algorithm for the Resource Constrained Multi-project Scheduling Problem. European Journal of Operational Research\u00a0189, 1171\u20131190 (2008)","journal-title":"European Journal of Operational Research"},{"key":"21_CR7","doi-asserted-by":"crossref","unstructured":"Peteghem, V.V., Vanhoucke, M.: A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. European Journal of Operational Research (2009)","DOI":"10.1016\/j.ejor.2009.03.034"},{"key":"21_CR8","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1007\/0-387-33117-4_5","volume-title":"Handbook of Production Scheduling","author":"J.W. Fowler","year":"2006","unstructured":"Fowler, J.W., Monch, L., Rose, O.: Scheduling and Simulation. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 109\u2013133. Springer, US (2006)"},{"key":"21_CR9","doi-asserted-by":"publisher","first-page":"630","DOI":"10.1016\/j.compind.2007.05.009","volume":"58","author":"A.s. Pfeiffer","year":"2007","unstructured":"Pfeiffer, A.s., Kadar, B., Monostori, L.s.: Stability-oriented evaluation of rescheduling strategies, by using simulation. Computers in Industry\u00a058, 630\u2013643 (2007)","journal-title":"Computers in Industry"},{"key":"21_CR10","doi-asserted-by":"crossref","unstructured":"Herrmann, J.W.: Rescheduling Startegies, Policies, and Methods. In: Handbook of Production Scheduling, pp. 135\u2013148","DOI":"10.1007\/0-387-33117-4_6"},{"key":"21_CR11","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","volume":"165","author":"W. Herroelen","year":"2005","unstructured":"Herroelen, W., Leus, R.: Project Scheduling under Uncertainty: Survey and Research Potentials. European Journal of Operational Research\u00a0165, 289\u2013306 (2005)","journal-title":"European Journal of Operational Research"},{"key":"21_CR12","doi-asserted-by":"crossref","unstructured":"Antoniol, G., Penta, M.D., Harman, M.: A Robust Search\u2013Based Approach to Project Management in the Presence of Abandonment, Rework, Error and Uncertainty. In: Proceedings of the 10th International Symposium on Software Metrics, pp. 172\u2013183 (2004)","DOI":"10.1109\/METRIC.2004.1357901"},{"key":"21_CR13","doi-asserted-by":"publisher","first-page":"4148","DOI":"10.1021\/ie071431u","volume":"47","author":"Z. Li","year":"2008","unstructured":"Li, Z., Ierapetritou, M.G.: Robust Optimization for Process Scheduling Under Uncer-tainty. Industrial and Engineering Chemistry Research\u00a047, 4148\u20134157 (2008)","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"21_CR14","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1016\/j.ijpe.2004.04.002","volume":"96","author":"M.A. Al-Fawzan","year":"2005","unstructured":"Al-Fawzan, M.A., Haouari, M.: A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics\u00a096, 175\u2013187 (2005)","journal-title":"International Journal of Production Economics"},{"key":"21_CR15","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1016\/S0377-2217(02)00701-4","volume":"152","author":"J. Wang","year":"2004","unstructured":"Wang, J.: A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research\u00a0152, 180\u2013194 (2004)","journal-title":"European Journal of Operational Research"},{"key":"21_CR16","doi-asserted-by":"crossref","unstructured":"Ghezail, F., Pierreval, H., Hajri-Gabouj, S.: Analysis of robustness in proactive scheduling: A graphical approach. Computers & Industrial Engineering (2009)","DOI":"10.1016\/j.cie.2009.03.004"},{"key":"21_CR17","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.cie.2003.09.007","volume":"46","author":"R. Rangsaritratsamee","year":"2004","unstructured":"Rangsaritratsamee, R., Ferrell Jr., W.G., Kurz, M.B.: Dynamic rescheduling that simulta-neously considers efficiency and stability. Computers & Industrial Engineering\u00a046, 1\u201315 (2004)","journal-title":"Computers & Industrial Engineering"},{"key":"21_CR18","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1007\/s00170-006-0590-7","volume":"34","author":"B. Yang","year":"2007","unstructured":"Yang, B.: Single Machine Rescheduling with New Jobs Arrivals and Processing Time Compression. International Journal of Advanced Manufacturing Technology\u00a034, 378\u2013384 (2007)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"21_CR19","unstructured":"Xiao, J., Osterweil, L.J., Wang, Q., Li, M.: Dynamic Resource Scheduling in Disruption-Prone Software Development Environments. Department of Computer Science, University of Massachusetts, Amherst, MA 01003 UM-CS-2009-050 (2009)"},{"key":"21_CR20","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/1090.001.0001","volume-title":"Adaptation in natural and artificial systems","author":"J.H. Holland","year":"1992","unstructured":"Holland, J.H.: Adaptation in natural and artificial systems. MIT Press, Cambridge (1992)"},{"key":"21_CR21","doi-asserted-by":"crossref","unstructured":"Cass, A.G., Lerner, B.S., McCall, E.K., Osterweil, L.J., Stanley, J., Sutton, M., Wise, A.: Little-JIL\/Juliette: A Process Definition Language and Interpreter. In: Proceedings of the 22nd International Conference on Software Engineering, Limerick, Ireland, pp. 754\u2013757 (2000)","DOI":"10.1145\/337180.337623"},{"key":"21_CR22","unstructured":"Wise, A.: Little-JIL 1.5 Language Report, Department of Computer Science, University of Massachusetts, Amherst UM-CS-2006-51 (2006)"},{"key":"21_CR23","unstructured":"Xiao, J., Osterweil, L.J., Wang, Q., Li, M.: Dynamic Scheduling in Systems with Complex Resource Allocation Requirements. Department of Computer Science at the University of Massachusetts Amherst. Technical report: UM-CS-2009-049 (2009)"}],"container-title":["Lecture Notes in Computer Science","New Modeling Concepts for Today\u2019s Software Processes"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-14347-2_21.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,11,23]],"date-time":"2020-11-23T21:51:22Z","timestamp":1606168282000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-14347-2_21"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642143465","9783642143472"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-14347-2_21","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2010]]}}}