{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T21:00:15Z","timestamp":1725570015302},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642152429"},{"type":"electronic","value":"9783642152436"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-15243-6_9","type":"book-chapter","created":{"date-parts":[[2010,11,6]],"date-time":"2010-11-06T12:19:31Z","timestamp":1289045971000},"page":"73-80","source":"Crossref","is-referenced-by-count":1,"title":["Study on Construction Project Bidding Risk Assessment Model"],"prefix":"10.1007","author":[{"given":"Guofeng","family":"Wen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liwen","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2010,9,25]]},"reference":[{"key":"9_CR1_9","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1080\/01446190010002561","volume":"19","author":"Xu Tianji","year":"2001","unstructured":"Xu Tianji, Tiong Robert LK (2001) Risk assessment on contractors pricing strategies. Journal of Construction Management and Economics 19:77\u201384","journal-title":"Journal of Construction Management and Economics"},{"key":"9_CR2_9","doi-asserted-by":"publisher","first-page":"258","DOI":"10.1061\/(ASCE)0733-9364(1992)118:2(258)","volume":"118","author":"A Touran","year":"1992","unstructured":"Touran A, Wiser EP (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management 118:258\u2013272","journal-title":"Journal of Construction Engineering and Management"},{"key":"9_CR3_9","doi-asserted-by":"publisher","first-page":"491","DOI":"10.1080\/01446190050024905","volume":"18","author":"JHM Tah","year":"2000","unstructured":"Tah JHM, Carr V (2000) A proposal for construction project risk assessment using fuzzy logic. Journal of Construction Management and Economics 18:491\u2013500","journal-title":"Journal of Construction Management and Economics"},{"key":"9_CR4_9","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1109\/17.65759","volume":"38","author":"MA Mustafa","year":"1991","unstructured":"Mohammad A. Mustafa, Jamal F. Al-Bahar (1991) Project risk assessment using the analytic hierarchy process. IEEE Transactions on Engineering Management 38:46\u201352","journal-title":"IEEE Transactions on Engineering Management"},{"key":"9_CR5_9","unstructured":"Yang Lanrong, Zhang Jinlong (2000) The Method of Risk Analysis for Project Bidding. Science Research Management 21:47\u201349"},{"key":"9_CR6_9","first-page":"76","volume":"28","author":"SHI Ke-bin","year":"2005","unstructured":"SHI Ke-bin, ZHANG Li-xia, SHI Guo-qing (2005) Study on risk index system and comprehensive evaluation in construction project. Journal of Xinjiang Agriculture University 28:76\u201380","journal-title":"Journal of Xinjiang Agriculture University"},{"key":"9_CR7_9","first-page":"49","volume":"29","author":"D Xidong","year":"2007","unstructured":"Deng Xidong, Wang Chunyan (2007) the Grey Fuzzy theory appraises the risk of the project. Journal of China Three Gorges University (Natural Sciences) 29:49\u201353","journal-title":"Journal of China Three Gorges University (Natural Sciences)"},{"key":"9_CR8_9","doi-asserted-by":"crossref","first-page":"435","DOI":"10.1142\/S012906570200131X","volume":"12","author":"Yasser Hassan and Tazaki Eiichiro","year":"2002","unstructured":"Yasser Hassan and Tazaki Eiichiro (2002) Decision Making Using Hybrid Rough Sets and Neural Networks. International Journal of Neural Systems 12:435\u2013446","journal-title":"International Journal of Neural Systems"},{"key":"9_CR9_9","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1061\/(ASCE)0733-9364(2001)127:1(35)","volume":"127","author":"DKH Chua","year":"2001","unstructured":"Chua DKH, Li DZ, Chan WT (2001) Case-based reasoning approach in bid decision making. Journal of Construction Engineering and Management 127:35\u201345","journal-title":"Journal of Construction Engineering and Management"},{"key":"9_CR10_9","first-page":"378","volume":"15","author":"Q Xijing","year":"1999","unstructured":"Qi Xijing, Liu Li, Wang Shuwei (1999) The evaluation on tendering risk of construction companies. Journal of Shenyang Architectural and Civil Engineering Institute 15:378\u2013382","journal-title":"Journal of Shenyang Architectural and Civil Engineering Institute"},{"key":"9_CR11_9","first-page":"165","volume":"30","author":"Shun-guo Li","year":"2008","unstructured":"Li Shun-guo, Li Hui, Huang Qing-ping et al. (2008) Research on Predicting Model of Architectural Engineering Project Bidding Risk. Journal of Wuhan University of Technology 30:165\u2013168","journal-title":"Journal of Wuhan University of Technology"},{"key":"9_CR12_9","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0165-0114(97)00377-1","volume":"114","author":"C-T Chen","year":"2000","unstructured":"Chen Chen-Tung (2000) Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets and Systems 114:1\u20139","journal-title":"Fuzzy Sets and Systems"},{"key":"9_CR13_9","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1007\/BF01001956","volume":"11","author":"Z Pawlak","year":"1982","unstructured":"Z Pawlak (1982) Rough sets. International Journal of Computer and Information Sciences 11:341\u2013356","journal-title":"International Journal of Computer and Information Sciences"},{"key":"9_CR14_9","unstructured":"Sun L (2003) Construction project bidding risk knowledge discovery based on Rough set. PhD Thesis of Huazhong University of Science and Technology"}],"container-title":["Computational Risk Management","Modeling Risk Management in Sustainable Construction"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-15243-6_9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,3,21]],"date-time":"2019-03-21T23:42:37Z","timestamp":1553211757000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-15243-6_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,9,25]]},"ISBN":["9783642152429","9783642152436"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-15243-6_9","relation":{},"ISSN":["2191-1436"],"issn-type":[{"type":"print","value":"2191-1436"}],"subject":[],"published":{"date-parts":[[2010,9,25]]}}}