{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T14:22:49Z","timestamp":1761488569152},"publisher-location":"Berlin, Heidelberg","reference-count":13,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642163579"},{"type":"electronic","value":"9783642163586"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-16358-6_31","type":"book-chapter","created":{"date-parts":[[2010,10,19]],"date-time":"2010-10-19T10:36:18Z","timestamp":1287484578000},"page":"243-250","source":"Crossref","is-referenced-by-count":8,"title":["The Application of Lean Production Control Methods within a Process-Type Industry: The Case of Hydro Automotive Structures"],"prefix":"10.1007","author":[{"given":"Daryl","family":"Powell","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Erlend","family":"Alfnes","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marco","family":"Semini","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"31_CR1","unstructured":"Andersen, B., Strandhagen, J.O., Haavardtun, L.J.: Material- og Produksjonsstyring. Cappelen, Oslo"},{"key":"31_CR2","volume-title":"The Lean Toolbox","author":"J. Bicheno","year":"2009","unstructured":"Bicheno, J., Holweg, M.: The Lean Toolbox, 4th edn. PICSIE Books, Buckingham (2009)","edition":"4"},{"key":"31_CR3","unstructured":"Fauske, H., Alfnes, E., Semini, M.: Lean Supply Chain Control in Hydro Automotive Structures. In: APMS 2008 Conference Proceedings (2008)"},{"key":"31_CR4","unstructured":"Glenday, I., Sather, R. (2005), Breaking Through to Flow, \n                      \n                        http:\/\/www.leanuk.org\/downloads\/LFL_2005\/Day2_Plenary_Glenday_Sather.pdf\n                      \n                      \n                     (accessed May 2009)"},{"key":"31_CR5","volume-title":"Cyclic Planning","author":"H. Groenevelt","year":"1992","unstructured":"Groenevelt, H., Johansen, J., Lederer, P.J.: Cyclic Planning. University of Rochester, New York (1992)"},{"key":"31_CR6","unstructured":"Hayes, R.H., Wheelwright, S.C.: Link manufacturing process and product life cycles. Harvard Business Review, 133\u2013140 (January-February 1979)"},{"key":"31_CR7","volume-title":"Operations Management","author":"T. Hill","year":"2005","unstructured":"Hill, T.: Operations Management. Palgrave Macmillan, New York (2005)"},{"key":"31_CR8","volume-title":"Factory Physics","author":"W. Hopp","year":"2000","unstructured":"Hopp, W., Spearman, M.: Factory Physics. McGraw-Hill, New York (2000)"},{"issue":"5","key":"31_CR9","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1016\/S0278-6125(97)88462-2","volume":"16","author":"R.R. Inmann","year":"1997","unstructured":"Inmann, R.R., Jordan, W.C.: Integrated Assembly Line Loading, Design and Labour Planning. Journal of Manufacturing Systems\u00a016(5), 315\u2013322 (1997)","journal-title":"Journal of Manufacturing Systems"},{"key":"31_CR10","volume-title":"Lean for the Process Industries","author":"P.L. King","year":"2009","unstructured":"King, P.L.: Lean for the Process Industries. Productivity Press, New York (2009)"},{"key":"31_CR11","volume-title":"Learning to See","author":"M. Rother","year":"2003","unstructured":"Rother, M., Shook, J.: Learning to See. Lean Enterprise Institute Inc, Cambridge (2003)"},{"key":"31_CR12","volume-title":"A Study of the Toyota Production System","author":"S. Shingo","year":"1989","unstructured":"Shingo, S.: A Study of the Toyota Production System. Productivity Press, New York (1989)"},{"key":"31_CR13","volume-title":"Production Operations Management","author":"R. Wild","year":"1980","unstructured":"Wild, R.: Production Operations Management. Holt, Rinehart and Winston, New York (1980)"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. New Challenges, New Approaches"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-16358-6_31.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T12:26:46Z","timestamp":1619785606000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-16358-6_31"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642163579","9783642163586"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-16358-6_31","relation":{},"ISSN":["1868-4238","1861-2288"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1861-2288"}],"subject":[],"published":{"date-parts":[[2010]]}}}