{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T20:22:14Z","timestamp":1725567734499},"publisher-location":"Berlin, Heidelberg","reference-count":4,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642163579"},{"type":"electronic","value":"9783642163586"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-16358-6_6","type":"book-chapter","created":{"date-parts":[[2010,10,19]],"date-time":"2010-10-19T10:36:18Z","timestamp":1287484578000},"page":"41-48","source":"Crossref","is-referenced-by-count":0,"title":["A Basic Study on the Installation of Distributed Autonomous Production Scheduling System in Ubiquitous Environment"],"prefix":"10.1007","author":[{"given":"Susumu","family":"Fujii","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tomomitsu","family":"Motohashi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Takashi","family":"Irohara","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuichiro","family":"Miyamoto","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"unstructured":"Fujii, S., Motohashi, T., Irohara, T., Miyamoto, Y., Moriguchi, S.: A Study on Job Shop Scheduling based on Two-Way Auction in Ubiquitous Environment. In: APMS 2008 (2008)","key":"6_CR1"},{"issue":"3","key":"6_CR2","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1080\/00207540310001613683","volume":"42","author":"C. Saygin","year":"2004","unstructured":"Saygin, C., Siwamogsatham, T.: Auction-based distributed scheduling and control scheme for flexible manufacturing systems. International Journal of Production Research\u00a042(3), 547\u2013572 (2004)","journal-title":"International Journal of Production Research"},{"issue":"9","key":"6_CR3","doi-asserted-by":"publisher","first-page":"1879","DOI":"10.1080\/00207540310001649530","volume":"42","author":"Srivinas","year":"2004","unstructured":"Srivinas, Tiwari, M.K., Allada, V.: Solving the machine-loading problem in a flexible manufacturing system using a combinational auction-based approach. International Journal of Production Research\u00a042(9), 1879\u20131983 (2004)","journal-title":"International Journal of Production Research"},{"issue":"8","key":"6_CR4","doi-asserted-by":"publisher","first-page":"1503","DOI":"10.1080\/00207540500434713","volume":"44","author":"V. Kumar","year":"2006","unstructured":"Kumar, V., Kumar, S., Tiwari, M.K., Chan, F.T.S.: Auction-based approach to resolve the scheduling problem in the steel making process. International Journal of Production Research\u00a044(8), 1503\u20131522 (2006)","journal-title":"International Journal of Production Research"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. New Challenges, New Approaches"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-16358-6_6.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T12:26:55Z","timestamp":1619785615000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-16358-6_6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642163579","9783642163586"],"references-count":4,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-16358-6_6","relation":{},"ISSN":["1868-4238","1861-2288"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1861-2288"}],"subject":[],"published":{"date-parts":[[2010]]}}}