{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T20:19:17Z","timestamp":1725567557185},"publisher-location":"Berlin, Heidelberg","reference-count":23,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642165269"},{"type":"electronic","value":"9783642165276"}],"license":[{"start":{"date-parts":[[2010,1,1]],"date-time":"2010-01-01T00:00:00Z","timestamp":1262304000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-16527-6_23","type":"book-chapter","created":{"date-parts":[[2010,10,21]],"date-time":"2010-10-21T04:02:37Z","timestamp":1287633757000},"page":"175-184","source":"Crossref","is-referenced-by-count":0,"title":["An Optimization Model of Site Batch Plant Layout for Infrastructure Project"],"prefix":"10.1007","author":[{"given":"Kwan-Chew","family":"Ng","sequence":"first","affiliation":[]},{"given":"Jing","family":"Li","sequence":"additional","affiliation":[]},{"given":"Chen-Xi","family":"Shi","sequence":"additional","affiliation":[]},{"given":"Qian","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"23_CR1","doi-asserted-by":"publisher","first-page":"348","DOI":"10.1016\/j.simpat.2008.09.011","volume":"17","author":"S.M. AbouRizk","year":"2009","unstructured":"AbouRizk, S.M., Zhou, F., AL-Battaineh, H.: Optimisation of construction site layout using a hybrid simulation-based system. Simulation Modeling Practice and Theory\u00a017, 348\u2013363 (2009)","journal-title":"Simulation Modeling Practice and Theory"},{"key":"23_CR2","doi-asserted-by":"crossref","unstructured":"Cheng, M.Y.: Automated site layout of temporary construction facilities using geographic information systems (GIS). Ph.D. thesis, University of Texas, Austin, TX (1992)","DOI":"10.22260\/ISARC1993\/0052"},{"issue":"4","key":"23_CR3","doi-asserted-by":"publisher","first-page":"329","DOI":"10.1061\/(ASCE)0733-9364(1996)122:4(329)","volume":"122","author":"M.Y. Cheng","year":"1996","unstructured":"Cheng, M.Y., O\u2019Connor, J.T.: Arc Site: Enhanced GIS for construction site layout. J. Constr. Eng. Manage.\u00a0122(4), 329\u2013336 (1996)","journal-title":"J. Constr. Eng. Manage."},{"key":"23_CR4","doi-asserted-by":"publisher","first-page":"327","DOI":"10.1016\/j.autcon.2003.10.001","volume":"13","author":"C. Feng","year":"2004","unstructured":"Feng, C., Cheng, T., Wu, H.: Optimizing the schedule of dispatching RMC trucks through genetic algorithms. Automation in Construction\u00a013, 327\u2013340 (2004)","journal-title":"Automation in Construction"},{"issue":"4","key":"23_CR5","doi-asserted-by":"publisher","first-page":"534","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(534)","volume":"130","author":"E. Elbeltagi","year":"2004","unstructured":"Elbeltagi, E., Hegazy, T., Eldosouky, A.: Dynamic Layout of Construction Temporary Facilities Considering Safety. Journal of Construction Engineering and Management\u00a0130(4), 534\u2013541 (2004)","journal-title":"Journal of Construction Engineering and Management"},{"key":"23_CR6","doi-asserted-by":"publisher","first-page":"749","DOI":"10.1016\/S0926-5805(03)00058-X","volume":"12","author":"H.M. Osman","year":"2003","unstructured":"Osman, H.M., Georgy, G.E., Ibrahi, M.E.: A hybrid CAD-based construction site layout planning system using genetic algorithms. Automation in Construction\u00a012, 749\u2013764 (2003)","journal-title":"Automation in Construction"},{"key":"23_CR7","unstructured":"Hamiani, A.: CONSITE: A knowledge-based expert system framework for construction site layout, Ph.D. thesis, University of Texas, Austin, TX (1987)"},{"key":"23_CR8","first-page":"248","volume-title":"Microcomputers to supercomputers","author":"A. Hamiani","year":"1988","unstructured":"Hamiani, A., Popescu, G.: CONSITE: A knowledge-based expert system for site layout Computing in Civil Engineering. In: Will, K.M. (ed.) Microcomputers to supercomputers, pp. 248\u2013256. ASCE, New York (1988)"},{"issue":"3","key":"23_CR9","doi-asserted-by":"publisher","first-page":"198","DOI":"10.1061\/(ASCE)0887-3801(1999)13:3(198)","volume":"13","author":"T. Hegazy","year":"1999","unstructured":"Hegazy, T., Elbeltagi, E.: EvoSite: An evolution-based model for site layout planning. Journal of Computing in Civil Engineering, ASCE\u00a013(3), 198\u2013206 (1999)","journal-title":"Journal of Computing in Civil Engineering, ASCE"},{"key":"23_CR10","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1111\/0885-9507.00215","volume":"16","author":"E. Elbeltagi","year":"2001","unstructured":"Elbeltagi, E., Hegazy, T.: A Hybrid AI-Based System for Site Layout Planning in Construction. Computer-Aided Civil and Infrastructure Engineering\u00a016, 79\u201393 (2001)","journal-title":"Computer-Aided Civil and Infrastructure Engineering"},{"issue":"4","key":"23_CR11","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1061\/(ASCE)0887-3801(1998)12:4(227)","volume":"12","author":"H. Li","year":"1998","unstructured":"Li, H., Love, P.: Site-level facilities layout using genetic algorithms. Journal of Computing in Civil Engineering, ASCE\u00a012(4), 227\u2013231 (1998)","journal-title":"Journal of Computing in Civil Engineering, ASCE"},{"issue":"2","key":"23_CR12","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/S0926-5805(99)00006-0","volume":"9","author":"H. Li","year":"2000","unstructured":"Li, H., Love, P.: Genetic search for solving construction site-level unequal-area facility layout problems. Automation in Construction\u00a09(2), 217\u2013226 (2000)","journal-title":"Automation in Construction"},{"key":"23_CR13","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.autcon.2009.09.002","volume":"19","author":"X. Ning","year":"2010","unstructured":"Ning, X., Lam, K.C., Lam, M.C.K.: Dynamic construction site layout planning using max-min ant system. Automation in Construction\u00a019, 55\u201365 (2010)","journal-title":"Automation in Construction"},{"issue":"5","key":"23_CR14","doi-asserted-by":"publisher","first-page":"418","DOI":"10.1061\/(ASCE)0733-9364(2002)128:5(418)","volume":"128","author":"M.J. Mawdesley","year":"2002","unstructured":"Mawdesley, M.J., Al-jibouri, S.H., Yang, H.: Genetic algorithms for construction site layout in project planning. J. Const. Eng. Manage, ASCE\u00a0128(5), 418\u2013426 (2002)","journal-title":"J. Const. Eng. Manage, ASCE"},{"key":"23_CR15","volume-title":"Reinforced Concrete: A fundamental approach","author":"E.G. Nawy","year":"1984","unstructured":"Nawy, E.G.: Reinforced Concrete: A fundamental approach. Prentice-Hall, Englewood Cliffs (1984)"},{"issue":"4","key":"23_CR16","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1061\/(ASCE)0733-9364(1983)109:4(387)","volume":"109","author":"W.E. Rodriguez-Ramos","year":"1983","unstructured":"Rodriguez-Ramos, W.E., Francis, R.L.: Single crane location optimization. Journal of Construction Division, ASCE\u00a0109(4), 387\u2013397 (1983)","journal-title":"Journal of Construction Division, ASCE"},{"key":"23_CR17","doi-asserted-by":"publisher","first-page":"701","DOI":"10.1016\/j.autcon.2004.02.004","volume":"13","author":"F. Sadeghpour","year":"2004","unstructured":"Sadeghpour, F., Moselhi, O., Alkass, S.: A CAD-based model for site planning. Automation in Construction\u00a013, 701\u2013715 (2004)","journal-title":"Automation in Construction"},{"issue":"4","key":"23_CR18","doi-asserted-by":"publisher","first-page":"749","DOI":"10.1061\/(ASCE)0733-9364(1992)118:4(749)","volume":"118","author":"I.D. Tommelein","year":"1992","unstructured":"Tommelein, I.D., Levitt, R.E., Hayes-Roth, B.: SightPlan for site layout. Journal of Construction Engineering and Management, ASCE\u00a0118(4), 749\u2013766 (1992)","journal-title":"Journal of Construction Engineering and Management, ASCE"},{"issue":"4","key":"23_CR19","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1061\/(ASCE)0733-9364(2001)127:4(315)","volume":"127","author":"C.M. Tam","year":"2001","unstructured":"Tam, C.M., Tong, T.K., Chan, W.K.: Genetic algorithm for optimizing supply locations around tower crane. J. Constr. Eng. Manag., ASCE\u00a0127(4), 315\u2013321 (2001)","journal-title":"J. Constr. Eng. Manag., ASCE"},{"issue":"1","key":"23_CR20","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1057\/jors.1973.6","volume":"24","author":"A. Warszawski","year":"1973","unstructured":"Warszawski, A., Peer, S.: Optimizing the location of facilities on a building site. Operational Research Quarterly\u00a024(1), 35\u201344 (1973)","journal-title":"Operational Research Quarterly"},{"issue":"3","key":"23_CR21","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1061\/(ASCE)0887-3801(1995)9:3(201)","volume":"9","author":"I.-C. Yeh","year":"1995","unstructured":"Yeh, I.-C.: Construction-site layout using annealed neural network. ASCE Journal of Computing in Civil Engineering\u00a09(3), 201\u2013208 (1995)","journal-title":"ASCE Journal of Computing in Civil Engineering"},{"key":"23_CR22","unstructured":"Zouein, P.P.: MoveSchedule: A planning tool for scheduling space use on construction sites. Ph.D. thesis, University of Michigan, Ann Arbor, MI (1995)"},{"key":"23_CR23","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1061\/(ASCE)0733-9364(1999)125:6(400)","volume":"125","author":"P.P. Zouein","year":"1999","unstructured":"Zouein, P.P., Tommelien, I.D.: Dynamic layout planning using a hybrid incremental solution method. J. Constr. Eng. Manag., ASCE\u00a0125, 400\u2013408 (1999)","journal-title":"J. Constr. Eng. Manag., ASCE"}],"container-title":["Lecture Notes in Computer Science","Artificial Intelligence and Computational Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-16527-6_23","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,5]],"date-time":"2019-06-05T14:16:11Z","timestamp":1559744171000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-16527-6_23"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642165269","9783642165276"],"references-count":23,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-16527-6_23","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2010]]}}}