{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T21:08:48Z","timestamp":1725570528491},"publisher-location":"Berlin, Heidelberg","reference-count":21,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642176401"},{"type":"electronic","value":"9783642176418"}],"license":[{"start":{"date-parts":[[2010,1,1]],"date-time":"2010-01-01T00:00:00Z","timestamp":1262304000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010]]},"DOI":"10.1007\/978-3-642-17641-8_31","type":"book-chapter","created":{"date-parts":[[2010,11,24]],"date-time":"2010-11-24T10:52:31Z","timestamp":1290595951000},"page":"260-266","source":"Crossref","is-referenced-by-count":1,"title":["Scheduling and Planning Software for Corrugation Process"],"prefix":"10.1007","author":[{"given":"C.","family":"Chantrapornchai","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"T.","family":"Sathapanawat","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"31_CR1","unstructured":"Affshar, A., Amiri, H., Eshtelardian, E.: An improved linear programming model for one dimensional cutting stock problem. In: 1st Intl. Conf. on Construction in Developing Countries (ICCIDE-1), Pakistan (August 2008)"},{"issue":"5","key":"31_CR2","doi-asserted-by":"publisher","first-page":"729","DOI":"10.1287\/opre.46.5.729","volume":"46","author":"L.M.A. Chan","year":"1998","unstructured":"Chan, L.M.A., Muriel, A., Simchi-Levi, D.: Parallel Machine Scheduling, Linear Programming, and Parameter List Scheduling Heuristics. Operations Research\u00a046(5), 729\u2013741 (1998)","journal-title":"Operations Research"},{"key":"31_CR3","unstructured":"Chiong, R., Beng, O.: A comparison between genetic algorithms and evolutionary programming based on cutting stock problem. Engineering Letter\u00a014(1) (2007) (advance online publication: February 12, 2007)"},{"key":"31_CR4","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1016\/j.ejor.2009.10.028","volume":"204","author":"Y. Cui","year":"2010","unstructured":"Cui, Y., Yang, Y.: A heuristic for one-dimensional cutting stock problem with usable leftover. European Journal of Operation Research\u00a0204, 245\u2013250 (2010)","journal-title":"European Journal of Operation Research"},{"key":"31_CR5","doi-asserted-by":"publisher","first-page":"1092","DOI":"10.1287\/opre.29.6.1092","volume":"29","author":"H. Dyckhoff","year":"1981","unstructured":"Dyckhoff, H.: A new linear programming approach to the cutting stock problem. Operations Research\u00a029, 1092\u20131104 (1981)","journal-title":"Operations Research"},{"key":"31_CR6","unstructured":"Santa Cruz, C.D., Sandstrom, W.R.: Method for bending a corrugated sheet, United States Patent 6354130 (2002)"},{"key":"31_CR7","unstructured":"Darley, V., von Tessin, P., Sandler, D.: An Agent-Based Model of a Corrugated Box Factory: Tradeoff between Finished-GoodStock and On-Time-in-Full Delivery, \n                  \n                    www.santafe.edu\/~vince\/pub\/CorrugatedBoxFactory.pdf\n                  \n                  \n                 (accessed February 20, 2008)"},{"key":"31_CR8","unstructured":"Goldratt, E.M., Cox, J.: The Goal. North River Press, 3rd Revised edn. (2004)"},{"key":"31_CR9","doi-asserted-by":"publisher","first-page":"793","DOI":"10.1287\/mnsc.17.12.B793","volume":"17","author":"R.W. Haessler","year":"1971","unstructured":"Haessler, R.W.: A heuristic programming solution to a nonlinear cutting stock problem. Management Science\u00a017, 793\u2013802 (1971)","journal-title":"Management Science"},{"issue":"4","key":"31_CR10","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1016\/0005-1098(85)90080-9","volume":"21","author":"R.W. Haessler","year":"1985","unstructured":"Haessler, R.W.: Production Planning and Scheduling for an Integrated Container Company. Automatica\u00a021(4), 445\u2013452 (1985)","journal-title":"Automatica"},{"key":"31_CR11","unstructured":"Haessler, R.W., Brian Talbot, F.: A 0-1 Model For Solving The Corrugator Trim Problem, Working Paper No. 205, Division of Research, Graduate School of Business Administration, The University of Michigan (February 1980)"},{"key":"31_CR12","unstructured":"Haessler, R.W.: Short Term Planning and Scheduling in a Paper Mill, Working Paper No. 268, Division of Research, Graduate School of Business Administration, The University of Michigan (May 1981)"},{"key":"31_CR13","unstructured":"Haessler, R.W., Sweeny, P.E.: Evaluating the Impact of Small Changes in Ordered Widths on Trim Yields, Working Paper No. 640, Division of Research, Graduate School of Business Administration, The University of Michigan (July 1990)"},{"issue":"6","key":"31_CR14","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1061\/(ASCE)0733-9364(2007)133:6(417)","volume":"133","author":"P.G. Ipsilandis","year":"2007","unstructured":"Ipsilandis, P.G.: Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects. Journal of Construction Engineering and Management\u00a0133(6), 417\u2013424 (2007), doi:10.1061\/(ASCE)0733-9364(2007)133:6(417)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"3","key":"31_CR15","doi-asserted-by":"publisher","first-page":"204","DOI":"10.1007\/BF01754599","volume":"9","author":"L. Kops","year":"1994","unstructured":"Kops, L., Natarajan, S.: Time partitioning based on the job-flow schedule \u2014 A new approach to optimum allocation of jobs on machine tools. International Journal of Advanced Manufacturing Technology\u00a09(3), 204\u2013210 (1994)","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"31_CR16","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1016\/j.omega.2003.10.001","volume":"32","author":"S.M. Lee","year":"2004","unstructured":"Lee, S.M., Asllani, A.A.: Job scheduling with dual criteria and sequence-dependent setups: mathematical versus genetic programming. Omega\u00a032(2), 145\u2013153 (2004)","journal-title":"Omega"},{"key":"31_CR17","unstructured":"Mccullough, J.: Improved Planning Results in Success, Softwar Technology Case Studies. Corrugated Technologies Inc., (January-February 2007)"},{"key":"31_CR18","volume-title":"Scheduling: Theory, Algorithms, and Systems","author":"M.L. Pinedo","year":"2008","unstructured":"Pinedo, M.L.: Scheduling: Theory, Algorithms, and Systems, 3rd edn. Springer, Heidelberg (2008)","edition":"3"},{"key":"31_CR19","unstructured":"Renildo, G., et al.: Linear Programming Models for the One-dimensional Cutting Stock Problem, INPE ePRint:sid.inpe.br\/ePrint@80\/2006\/12.18.16.52 v1 2006-12-19 (2006)"},{"key":"31_CR20","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"1175","DOI":"10.1007\/978-3-540-72590-9_177","volume-title":"Computational Science \u2013 ICCS 2007","author":"X. Shen","year":"2007","unstructured":"Shen, X., et al.: A Heuristic particle swarm optimization for cutting stock problem based on cutting pattern. In: Shi, Y., van Albada, G.D., Dongarra, J., Sloot, P.M.A. (eds.) ICCS 2007. LNCS, vol.\u00a04490, pp. 1175\u20131178. Springer, Heidelberg (2007)"},{"key":"31_CR21","unstructured":"SolarSoft Co. Ltd., \n                  \n                    http:\/\/www.solarsoft.com\/industries\/packaging\/corrugated_packaging.htm"}],"container-title":["Communications in Computer and Information Science","Signal Processing and Multimedia"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-17641-8_31","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,10,12]],"date-time":"2018-10-12T01:43:42Z","timestamp":1539308622000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-17641-8_31"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010]]},"ISBN":["9783642176401","9783642176418"],"references-count":21,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-17641-8_31","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2010]]}}}