{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T09:40:15Z","timestamp":1742982015819,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":7,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642200083"},{"type":"electronic","value":"9783642200090"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-20009-0_45","type":"book-chapter","created":{"date-parts":[[2011,6,25]],"date-time":"2011-06-25T18:32:23Z","timestamp":1309026743000},"page":"281-286","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Planning and Control of Automated Material Handling Systems: The Merge Module"],"prefix":"10.1007","author":[{"given":"Sameh","family":"Haneyah","sequence":"first","affiliation":[]},{"given":"Johann","family":"Hurink","sequence":"additional","affiliation":[]},{"given":"Marco","family":"Schutten","sequence":"additional","affiliation":[]},{"given":"Henk","family":"Zijm","sequence":"additional","affiliation":[]},{"given":"Peter","family":"Schuur","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,6,21]]},"reference":[{"issue":"17","key":"45_CR1_45","doi-asserted-by":"publisher","first-page":"3551","DOI":"10.1080\/00207540410001705284","volume":"42","author":"F.F. Chen","year":"2004","unstructured":"Chen F.F. Sturges R.H. Babiceanu, R.F. Framework for the control of automated material-handling systems using the holonic manufacturing approach. International Journal of Production Research, 42(17): 3551\u20133564, 2004.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"45_CR2_45","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/0278-6125(91)90049-8","volume":"10","author":"N.P. Boyd","year":"1991","unstructured":"Boyd N.P. Whorms H.H. Dilts, D.M. The evolution of control architectures for automated manufacturing systems. Journal of Manufacturing Systems, 10(1): 79\u201393, 1991.","journal-title":"Journal of Manufacturing Systems"},{"key":"45_CR3_45","doi-asserted-by":"crossref","unstructured":"Bozer Y.A. Hsieh, Y.-J. Analytical modeling of closed-loop conveyors with load recirculation. volume 3483, pages 437\u2013447, 2005.","DOI":"10.1007\/11424925_47"},{"issue":"3","key":"45_CR4_45","doi-asserted-by":"publisher","first-page":"958","DOI":"10.1016\/j.cie.2009.03.013","volume":"57","author":"Douglas L. McWilliams","year":"2009","unstructured":"Douglas L. McWilliams. A dynamic load-balancing scheme for the parcel hub-scheduling problem. Computers & Industrial Engineering, 57(3): 958\u2013962, 2009.","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"45_CR5_45","doi-asserted-by":"publisher","first-page":"136","DOI":"10.1016\/j.cie.2010.03.010","volume":"59","author":"Douglas L. McWilliams","year":"2010","unstructured":"Douglas L. McWilliams. Iterative improvement to solve the parcel hub scheduling problem. Computers \u2026 Industrial Engineering, 59(1): 136\u2013144, 2010.","journal-title":"Computers \u2026 Industrial Engineering"},{"key":"45_CR6_45","doi-asserted-by":"crossref","unstructured":"El-Nashar A. Nazzal, D. Survey of research in modeling conveyor-based automated material handling systems in wafer fabs. 2007.","DOI":"10.1109\/WSC.2007.4419803"},{"issue":"2","key":"45_CR7_45","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/0191-2607(80)90109-0","volume":"14","author":"S.E. Shladover","year":"1980","unstructured":"S.E. Shladover. Operation of merge junctions in a dynamically entrained automated guideway transit system. Transportation Research Part A: General, 14(2): 85\u2013112, 1980.","journal-title":"Transportation Research Part A: General"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2010"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-20009-0_45","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,31]],"date-time":"2023-01-31T22:11:28Z","timestamp":1675203088000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-20009-0_45"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642200083","9783642200090"],"references-count":7,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-20009-0_45","relation":{},"ISSN":["0721-5924"],"issn-type":[{"type":"print","value":"0721-5924"}],"subject":[],"published":{"date-parts":[[2011]]},"assertion":[{"value":"21 June 2011","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}