{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T14:34:12Z","timestamp":1742913252555,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642200083"},{"type":"electronic","value":"9783642200090"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-20009-0_66","type":"book-chapter","created":{"date-parts":[[2011,6,25]],"date-time":"2011-06-25T18:32:23Z","timestamp":1309026743000},"page":"417-422","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Achieving Better Utilization of Semiconductor Supply Chain Resources by Using an Appropriate Capacity Modeling Approach on the Example of Infineon Technologies AG"],"prefix":"10.1007","author":[{"given":"Hans","family":"Ehm","sequence":"first","affiliation":[]},{"given":"Christian","family":"Schiller","sequence":"additional","affiliation":[]},{"given":"Thomas","family":"Ponsignon","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,6,21]]},"reference":[{"key":"66_CR1_66","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1002\/nav.20086","volume":"52","author":"F. Barahona","year":"2005","unstructured":"F. Barahona, S. Bermon, O. G\u00fcnl\u00fck, and S. Hood. Robust Capacity Planning in Semiconductor Manufacturing. Naval Research Logistics, 52: 459\u2013468, 2005.","journal-title":"Naval Research Logistics"},{"issue":"5","key":"66_CR2_66","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1287\/inte.29.5.31","volume":"29","author":"S. Bermon","year":"1999","unstructured":"S. Bermon and S. J. Hood. Capacity Optimization Planning System (CAPS). Interfaces, 29(5): 31\u201350, 1999.","journal-title":"Interfaces"},{"key":"66_CR3_66","doi-asserted-by":"crossref","unstructured":"C.-F. Chien, S. Dauz\u00e8re-P\u00e9r\u00e8s, H. Ehm, J. W. Fowler, Z. Jiang, S. Krishnaswamy, L. M\u00f6nch, and R. Uzsoy. Modeling and Analysis of Semiconductor Manufacturing in a Shrinking World: Challenges and Successes. Proceedings of the Winter Simulation Conference, pages 2093\u2013 2099, 2008.","DOI":"10.1109\/WSC.2008.4736306"},{"issue":"5","key":"66_CR4_66","doi-asserted-by":"publisher","first-page":"386","DOI":"10.1287\/inte.1060.0238","volume":"36","author":"B.T. Denton","year":"2006","unstructured":"B.T. Denton, J. Forrest, and R. J. Milne. IBM Solves a Mixed-Integer Program to Optimize Its Semiconductor Supply Chain. Interfaces, 36(5): 386\u2013399, 2006.","journal-title":"Interfaces"},{"issue":"7","key":"66_CR5_66","doi-asserted-by":"publisher","first-page":"639","DOI":"10.1080\/09537280600900733","volume":"17","author":"J. N. D. Gupta","year":"2006","unstructured":"J. N. D. Gupta, R. Ruiz, J. W. Fowler, and S. J. Mason. Operational Planning and Control of Semiconductor Wafer Fabrication. Production Planning and Control, 17(7): 639\u2013647, 2006.","journal-title":"Production Planning and Control"},{"key":"66_CR6_66","doi-asserted-by":"crossref","unstructured":"C. Habla and L. M\u00f6nch. Solving Volume and Capacity Planning Problems in Semiconductor Manufacturing: A Computational Study. Proceedings of the Winter Simulation Conference, pages 2260\u20132266, 2008.","DOI":"10.1109\/WSC.2008.4736328"},{"key":"66_CR7_66","unstructured":"J. Kallrath and T. I. Maindl. Real Optimization with SAP\u00aeAPO. Springer, 2006."},{"key":"66_CR8_66","unstructured":"C. Schiller. Practical Problems in Implemented Decisions Supporting Systems within the Planning Process at Infineon Technologies AG. Intelligente Systeme zur Entscheidungsunter-st\u00fctzung, pages 99\u2013112, 2008."},{"key":"66_CR9_66","unstructured":"Supply Chain Council. SCOR, 2010.http:\/\/supply-chain.org\/scor."},{"issue":"4","key":"66_CR10_66","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1080\/07408179208964233","volume":"24","author":"R. Uzsoy","year":"1992","unstructured":"R.Uzsoy, C.-Y. Lee, and L. A. Martin-Vega. A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning. IIE Transactions, 24(4): 47\u201360, 1992.","journal-title":"IIE Transactions"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2010"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-20009-0_66","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,1]],"date-time":"2023-02-01T16:38:20Z","timestamp":1675269500000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-20009-0_66"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642200083","9783642200090"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-20009-0_66","relation":{},"ISSN":["0721-5924"],"issn-type":[{"type":"print","value":"0721-5924"}],"subject":[],"published":{"date-parts":[[2011]]},"assertion":[{"value":"21 June 2011","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}