{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,29]],"date-time":"2025-10-29T03:31:30Z","timestamp":1761708690683},"publisher-location":"Berlin, Heidelberg","reference-count":9,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642200083"},{"type":"electronic","value":"9783642200090"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-20009-0_68","type":"book-chapter","created":{"date-parts":[[2011,6,25]],"date-time":"2011-06-25T14:32:23Z","timestamp":1309012343000},"page":"429-434","source":"Crossref","is-referenced-by-count":8,"title":["Tactical Planning in Flexible Production Networks in the Automotive Industry"],"prefix":"10.1007","author":[{"given":"Kai","family":"Wittek","sequence":"first","affiliation":[]},{"given":"Thomas","family":"Volling","sequence":"additional","affiliation":[]},{"given":"Thomas S.","family":"Spengler","sequence":"additional","affiliation":[]},{"given":"Friedrich-Wilhelm","family":"Gundlach","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,6,21]]},"reference":[{"key":"68_CR1_68","doi-asserted-by":"publisher","first-page":"479","DOI":"10.1007\/978-3-540-69995-8_76","volume-title":"Operations Research Proceedings 2006","author":"G. Askar","year":"2007","unstructured":"G. Askar and J. Zimmermann. Optimal usage of flexibility instruments in automotive plants. In K.-H. Waldmann and U.M. Stocker, editors, Operations Research Proceedings 2006, pages 479\u2013484, Berlin, Heidelberg, 2007. Springer Verlag."},{"issue":"2","key":"68_CR2_68","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1007\/s00291-008-0147-2","volume":"31","author":"R. Bihlmaier","year":"2009","unstructured":"R. Bihlmaier, A. Koberstein, and R. Obst. Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty. OR Spectrum, 31(2): 311\u2013 336, 2009.","journal-title":"OR Spectrum"},{"issue":"3","key":"68_CR3_68","doi-asserted-by":"publisher","first-page":"194","DOI":"10.1287\/inte.1050.0187","volume":"36","author":"B. Fleischmann","year":"2006","unstructured":"B. Fleischmann, S. Ferber, and P. Henrich. Strategic planning of BMW)s global production network. Interfaces, 36(3): 194\u2013208, 2006.","journal-title":"Interfaces"},{"issue":"2","key":"68_CR4_68","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1016\/j.ijpe.2006.12.062","volume":"121","author":"D. Francas","year":"2009","unstructured":"D. Francas, M. Kremer, S. Minner, and M. Friese. Strategic process flexibility under lifecycle demand. International Journal of Production Economics, 121(2): 427\u2013440, 2009.","journal-title":"International Journal of Production Economics"},{"key":"68_CR5_68","volume-title":"Supply Chain Design fuer modulare Fahrzeugarchitekturen","author":"P.R. Gneiting","year":"2009","unstructured":"P.R. Gneiting. Supply Chain Design fuer modulare Fahrzeugarchitekturen. Eidgenoessisch Technische Hochschule, Zuerich, 2009."},{"issue":"4","key":"68_CR6_68","doi-asserted-by":"publisher","first-page":"577","DOI":"10.1287\/mnsc.41.4.577","volume":"41","author":"W. C. Jordan","year":"1995","unstructured":"W. C. Jordan and S. C. Graves. Principles on the benefits of manufacturing process flexibility. Management Science, 41(4): 577\u2013594, 1995.","journal-title":"Management Science"},{"issue":"3","key":"68_CR7_68","doi-asserted-by":"publisher","first-page":"507","DOI":"10.1007\/s00291-009-0171-x","volume":"31","author":"S. Kauder","year":"2009","unstructured":"S. Kauder and H. Meyr. Strategic network planning for an international automotive manufacturer: Balancing flexibility and economical efficiency. OR Spectrum, 31(3): 507\u2013532, 2009.","journal-title":"OR Spectrum"},{"issue":"4","key":"68_CR8_68","doi-asserted-by":"publisher","first-page":"447","DOI":"10.1007\/s00291-004-0168-4","volume":"26","author":"H. Meyr","year":"2004","unstructured":"H. Meyr. Supply chain planning in the german automotive industry. OR Spectrum, 26(4): 447\u2013470, 2004.","journal-title":"OR Spectrum"},{"issue":"4","key":"68_CR9_68","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/BF00186471","volume":"2","author":"A. K. Sethi","year":"1990","unstructured":"A. K. Sethi and S. P. Sethi. Flexibility in manufacturing: a survey. The International Journal of Flexible Manufacturing Systems, 2(4): 289\u2013328, 1990.","journal-title":"The International Journal of Flexible Manufacturing Systems"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2010"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-20009-0_68.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T08:59:32Z","timestamp":1619773172000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-20009-0_68"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642200083","9783642200090"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-20009-0_68","relation":{},"ISSN":["0721-5924"],"issn-type":[{"type":"print","value":"0721-5924"}],"subject":[],"published":{"date-parts":[[2011]]}}}