{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,19]],"date-time":"2026-03-19T11:45:07Z","timestamp":1773920707373,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642200083","type":"print"},{"value":"9783642200090","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-20009-0_79","type":"book-chapter","created":{"date-parts":[[2011,6,25]],"date-time":"2011-06-25T18:32:23Z","timestamp":1309026743000},"page":"497-502","source":"Crossref","is-referenced-by-count":5,"title":["The Joint Load Balancing and Parallel Machine Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Yassine","family":"Ouazene","sequence":"first","affiliation":[]},{"given":"Faicel","family":"Hnaien","sequence":"additional","affiliation":[]},{"given":"Farouk","family":"Yalaoui","sequence":"additional","affiliation":[]},{"given":"Lionel","family":"Amodeo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,6,21]]},"reference":[{"key":"79_CR1_79","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1016\/S0925-5273(98)00034-6","volume":"55","author":"M. Azizo\u01e7lu","year":"1998","unstructured":"M. Azizo\u01e7lu and O. Kirca. Tardiness minimization on parallel machines. International Journal of Production Economics, 55: 163\u2013168, 1998.","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"79_CR2_79","doi-asserted-by":"publisher","first-page":"769","DOI":"10.1080\/002075499191517","volume":"37","author":"R.R. Gung","year":"1999","unstructured":"R.R. Gung and H.J. Steudel. A workload balancing model for determining set-up time and batch size reductions in GT flow line work cells. International Journal of Production Research, 37(4): 769\u2013791, 1999.","journal-title":"International Journal of Production Research"},{"key":"79_CR3_79","doi-asserted-by":"publisher","first-page":"1025","DOI":"10.1287\/opre.42.6.1025","volume":"42","author":"C. Koulamas","year":"1994","unstructured":"C. Koulamas. The total tardiness problem: review and extensions. Operations Research, 42:1025\u20131041,1994.","journal-title":"Operations Research"},{"key":"79_CR4_79","doi-asserted-by":"publisher","first-page":"1043","DOI":"10.1016\/j.ejor.2005.06.025","volume":"175","author":"A. Kumar","year":"2006","unstructured":"A. Kumar, Prakash, M. Tiwari, R. Shankar, and A. Baveja. Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach. European Journal of Operational Research, 175: 1043\u20131069, 2006.","journal-title":"European Journal of Operational Research"},{"key":"79_CR5_79","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/0925-5273(94)90048-5","volume":"34","author":"B.K. Modi","year":"1994","unstructured":"B.K. Modi and K. Shanker. A formulation and solution methodology for part movement minimization and workload balancing at loading decisions in FMS. International Journal of Production Economics, 34: 73\u201382, 1994.","journal-title":"International Journal of Production Economics"},{"key":"79_CR6_79","doi-asserted-by":"publisher","first-page":"366","DOI":"10.1007\/s00170-003-1603-4","volume":"23","author":"S. Rajakumar","year":"2004","unstructured":"S. Rajakumar, V.P. Arunachalam, and V. Selladurai. Workflow balancing strategies in parallel machine scheduling. International Journal of Advanced Manufacturing, 23: 366\u2013374, 2004.","journal-title":"International Journal of Advanced Manufacturing"},{"key":"79_CR7_79","doi-asserted-by":"publisher","first-page":"1212","DOI":"10.1007\/s00170-006-0553-z","volume":"33","author":"S. Rajakumar","year":"2007","unstructured":"S. Rajakumar, V.P. Arunachalam, and V. Selladurai. Workflow balancing in parallel machines through genetic algorithm. International Journal of Advanced Manufacturing Technology, 33: 1212\u20131221, 2007.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"79_CR8_79","unstructured":"K. Shanker and S. Rajamathanandan. Loading problemin FMS: part movement minimization. In Proc. 3rd ORSA\/TIMS conf. on flexible manufacturing systems: Operations Research Models and Applications, pages 99\u2013104, 1989."},{"key":"79_CR9_79","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1287\/mnsc.29.3.273","volume":"29","author":"K.E. Stecke","year":"1983","unstructured":"K.E. Stecke. Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Science, 29: 273\u2013289, 1983.","journal-title":"Management Science"},{"key":"79_CR10_79","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1016\/j.ijpe.2004.01.003","volume":"95","author":"D.S. Sun","year":"2005","unstructured":"D.S. Sun, T.E. Lee, and K.H. Kim. Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool. International Journal of Production Economics, 95: 245\u2013264, 2005.","journal-title":"International Journal of Production Economics"},{"issue":"14","key":"79_CR11_79","doi-asserted-by":"publisher","first-page":"3357","DOI":"10.1080\/002075400418298","volume":"38","author":"M.K. Tiwari","year":"2000","unstructured":"M.K. Tiwari and N.K. Vidyarthi. Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach. International Journal of Production Research, 38(14): 3357\u20133384, 2000.","journal-title":"International Journal of Production Research"},{"key":"79_CR12_79","doi-asserted-by":"publisher","first-page":"265","DOI":"10.1016\/S0925-5273(01)00175-X","volume":"76","author":"F. Yalaoui","year":"2002","unstructured":"F. Yalaoui and C. Chu. Parallel machine scheduling to minimize total tardiness. International Journal of Production Economics, 76: 265\u2013279, 2002.","journal-title":"International Journal of Production Economics"},{"key":"79_CR13_79","first-page":"42","volume":"4","author":"M.B. Yildirim","year":"2007","unstructured":"M.B. Yildirim, E. Duman, K. Krishna, and K. Senniappan. Parallel machine scheduling with load balancing and sequence dependent setups. International Journal of Operations Research, 4: 42\u201349, 2007.","journal-title":"International Journal of Operations Research"},{"key":"79_CR14_79","first-page":"921","volume":"34","author":"L. YU","year":"2002","unstructured":"L. YU, M. Shih, M. Pfund, M.W. Carlyle, and W.J. Fowler. Scheduling unrelated parallel machines: an application to PWB manufacturing. IIE Transactions, 34: 921\u2013931, 2002.","journal-title":"IIE Transactions"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2010"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-20009-0_79.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,30]],"date-time":"2021-04-30T12:59:35Z","timestamp":1619787575000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-20009-0_79"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642200083","9783642200090"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-20009-0_79","relation":{},"ISSN":["0721-5924"],"issn-type":[{"value":"0721-5924","type":"print"}],"subject":[],"published":{"date-parts":[[2011]]}}}