{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T04:42:22Z","timestamp":1725597742132},"publisher-location":"Berlin, Heidelberg","reference-count":36,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642217043"},{"type":"electronic","value":"9783642217050"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-21705-0_4","type":"book-chapter","created":{"date-parts":[[2011,7,25]],"date-time":"2011-07-25T21:46:02Z","timestamp":1311630362000},"page":"85-107","source":"Crossref","is-referenced-by-count":0,"title":["Framework for Integrating Optimization and Heuristic Models for Solving Planning and Scheduling Problem in a Resin Manufacturing Plant"],"prefix":"10.1007","author":[{"given":"Mohamed K.","family":"Omar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yasothei","family":"Suppiah","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"4_CR1","doi-asserted-by":"publisher","first-page":"2223","DOI":"10.1016\/S0098-1354(00)00584-6","volume":"24","author":"C.A. Mendez","year":"2000","unstructured":"Mendez, C.A., Henning, G.P., Cerda, J.: Optimal scheduling of batches plants satisfying multiple product orders with different due-dates. Computers and Chemical Engineering\u00a024, 2223\u20132245 (2000)","journal-title":"Computers and Chemical Engineering"},{"key":"4_CR2","series-title":"TIMS Studies in Management Science","volume-title":"Logistics","author":"A.C. Hax","year":"1975","unstructured":"Hax, A.C., Meal, H.C.: Hierarchical integration of production planning and scheduling. In: Geisler, M. (ed.) Logistics. TIMS Studies in Management Science, vol.\u00a01. North-Holland, American Elsevier, New York (1975)"},{"key":"4_CR3","unstructured":"Gabbay, H.: A Hierarchical Approach to Production Planning. Technical Report No. 120, Operation Research Center, MIT, USA (1975)"},{"key":"4_CR4","doi-asserted-by":"publisher","first-page":"523","DOI":"10.1016\/S0927-0507(05)80190-2","volume-title":"Logistics of Production and Inventory","author":"G.R. Bitran","year":"1993","unstructured":"Bitran, G.R., Tirupati, D.: Hierarchical production planning. In: Graves, S.C., Rinnooy Kan, A.H.G., Zipkin, P.H. (eds.) Logistics of Production and Inventory, pp. 523\u2013567. North-Holland, Amsterdam (1993)"},{"key":"4_CR5","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/inte.15.4.1","volume":"15","author":"J.M. Liberator","year":"1985","unstructured":"Liberator, J.M., Miller, T.: A hierarchical production planning system. Interface\u00a015, 1\u201311 (1985)","journal-title":"Interface"},{"key":"4_CR6","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1080\/00207548008919682","volume":"18","author":"G.T. Mackulak","year":"1980","unstructured":"Mackulak, G.T., Moodie, C.L., Williams, J.T.: Computerized hierarchical production control in steel manufacturing. International Journal of Production Research\u00a018, 455\u2013465 (1980)","journal-title":"International Journal of Production Research"},{"key":"4_CR7","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1016\/0377-2217(93)90126-8","volume":"64","author":"W.G.M.M. Rutten","year":"1993","unstructured":"Rutten, W.G.M.M.: Hierarchical mathematical programming for operational planning in a process industry. European Journal of Operational Research\u00a064, 363\u2013369 (1993)","journal-title":"European Journal of Operational Research"},{"key":"4_CR8","doi-asserted-by":"publisher","first-page":"36","DOI":"10.1108\/eb003018","volume":"5","author":"M.R. Bowers","year":"1993","unstructured":"Bowers, M.R., Agarwal, A.: Hierarchical production planning: scheduling in the apparel industry. International Journal of Clothing Science and Technology\u00a05, 36\u201343 (1993)","journal-title":"International Journal of Clothing Science and Technology"},{"key":"4_CR9","doi-asserted-by":"publisher","first-page":"3023","DOI":"10.1080\/002075497194273","volume":"35","author":"M.M. Qiu","year":"1997","unstructured":"Qiu, M.M., Burch, E.E.: Hierarchical production planning and scheduling in a multiproduct, multi-machine environment. International Journal of Production Research\u00a035, 3023\u20133042 (1997)","journal-title":"International Journal of Production Research"},{"key":"4_CR10","doi-asserted-by":"publisher","first-page":"1517","DOI":"10.1080\/00207549608904982","volume":"6","author":"R. Venkataraman","year":"1996","unstructured":"Venkataraman, R., Smith, S.B.: Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions. International Journal of Production Research\u00a06, 1517\u20131537 (1996)","journal-title":"International Journal of Production Research"},{"key":"4_CR11","doi-asserted-by":"publisher","first-page":"625","DOI":"10.1016\/S0098-1354(00)80014-9","volume":"24","author":"B.P. Das","year":"2000","unstructured":"Das, B.P., Richard, J.G., Shah, N., Macchietto, S.: An investigation on integration of aggregate production planning, master production scheduling and short-term production scheduling of batch process operations through a common data model. Computers and Chemical Engineering\u00a024, 625\u20131631 (2000)","journal-title":"Computers and Chemical Engineering"},{"key":"4_CR12","doi-asserted-by":"publisher","first-page":"1029","DOI":"10.1080\/00207540600724989","volume":"45","author":"M.K. Omar","year":"2007","unstructured":"Omar, M.K., Teo, S.C.: Hierarchical production planning and scheduling in multiproduct, batch process environment. International Journal of Production Research\u00a045, 1029\u20131047 (2007)","journal-title":"International Journal of Production Research"},{"key":"4_CR13","doi-asserted-by":"publisher","first-page":"384","DOI":"10.1080\/09537289508930295","volume":"6","author":"K.N. McKay","year":"1995","unstructured":"McKay, K.N., Safayeni, F., Buzacott, J.A.: A Review of hierarchical production planning and its applicability to modern manufacturing. Production Planning and Control\u00a06, 384\u2013394 (1995)","journal-title":"Production Planning and Control"},{"key":"4_CR14","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1504\/IJMTM.2001.001406","volume":"3","author":"K. Okuda","year":"2001","unstructured":"Okuda, K.: Hierarchical structure in manufacturing systems: a literature survey. International Journal of Manufacturing Technology Management\u00a03, 210\u2013224 (2001)","journal-title":"International Journal of Manufacturing Technology Management"},{"key":"4_CR15","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1080\/07408178708975389","volume":"19","author":"M.D. Oliff","year":"1987","unstructured":"Oliff, M.D.: Disaggregate planning for parallel processors. IIE Transactions\u00a019, 215\u2013221 (1987)","journal-title":"IIE Transactions"},{"key":"4_CR16","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1016\/0272-6963(89)90014-4","volume":"8","author":"G.K. Leong","year":"1989","unstructured":"Leong, G.K., Oliff, M.D., Markland, R.E.: Improved hierarchical production-planning model. Journal of Operations Management\u00a08, 90\u2013114 (1989)","journal-title":"Journal of Operations Management"},{"key":"4_CR17","first-page":"1","volume":"8","author":"S. Toppan","year":"2003","unstructured":"Toppan, S., Joanne, M.S., Parthasarati, D.: Static scheduling research to minimize weighted and unweighted tardiness: A state of-the-art survey. International Journal of Production Economics\u00a08, 1\u201312 (2003)","journal-title":"International Journal of Production Economics"},{"key":"4_CR18","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C.T., Cheng, T.C.E., Mikhail, Y.: A survey of scheduling problems with setup times or costs. European Journal of Operational Research\u00a0187, 985\u20131032 (2008)","journal-title":"European Journal of Operational Research"},{"key":"4_CR19","first-page":"342","volume":"1","author":"J.K. Lenstra","year":"1997","unstructured":"Lenstra, J.K., Rinnooy Kan, A.H.G., Brucker, P.: Complexity of machine scheduling problems. Annals of Decision Mathematics\u00a01, 342\u2013362 (1997)","journal-title":"Annals of Decision Mathematics"},{"key":"4_CR20","volume-title":"Scheduling theory, algorithms and systems","author":"M. Pinedo","year":"2002","unstructured":"Pinedo, M.: Scheduling theory, algorithms and systems, 2nd edn. Prentice Hall, New Jersey (2002)","edition":"2"},{"key":"4_CR21","doi-asserted-by":"crossref","first-page":"1365","DOI":"10.1057\/jors.1995.184","volume":"46","author":"S.R. Das","year":"1995","unstructured":"Das, S.R., Gupta, J.N.D., Khumawala, B.M.: A saving index heuristic algorithm for flowshope scheduling with sequence dependent set-up times. Journal of the Operational Research Society\u00a046, 1365\u20131373 (1995)","journal-title":"Journal of the Operational Research Society"},{"key":"4_CR22","doi-asserted-by":"publisher","first-page":"3031","DOI":"10.1080\/00207540050117422","volume":"38","author":"M. Gravel","year":"2000","unstructured":"Gravel, M., Price, W., Gagnec, C.: Scheduling jobs in a Alcan aluminium factory using a genetic algorithm. International Journal of Production Research\u00a038, 3031\u20133041 (2000)","journal-title":"International Journal of Production Research"},{"key":"4_CR23","doi-asserted-by":"publisher","first-page":"3263","DOI":"10.1080\/00207549608905019","volume":"34","author":"M.P. Fanti","year":"1996","unstructured":"Fanti, M.P., Maione, B., Piscitelli, G., Turchiano, B.: Heuristic scheduling of jobs on a multi-product batch processing machine. International Journal of Production Research\u00a034, 3263\u20133286 (1996)","journal-title":"International Journal of Production Research"},{"key":"4_CR24","doi-asserted-by":"publisher","first-page":"52","DOI":"10.1287\/opre.49.1.52.11189","volume":"49","author":"G. Dobson","year":"2001","unstructured":"Dobson, G., Nambimadom, R.S.: The batch loading and scheduling problem. Operations Research\u00a049, 52\u201365 (2001)","journal-title":"Operations Research"},{"key":"4_CR25","doi-asserted-by":"publisher","first-page":"325","DOI":"10.1016\/S0360-8352(01)00009-2","volume":"39","author":"M. Azizoglu","year":"2001","unstructured":"Azizoglu, M., Webster, S.: Scheduling a batch process machine with incompatible job families. Computers and Industrial Engineering\u00a039, 325\u2013335 (2001)","journal-title":"Computers and Industrial Engineering"},{"key":"4_CR26","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/S0305-0548(03)00239-9","volume":"32","author":"I.C. Perez","year":"2005","unstructured":"Perez, I.C., Fowler, J.W., Carlyle, W.M.: Minimizing total weighted tardiness on a single batch process machine with incompatible job families. Computers and Operations Research\u00a032, 327\u2013341 (2005)","journal-title":"Computers and Operations Research"},{"key":"4_CR27","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1080\/07408179708966311","volume":"29","author":"Y.H. Lee","year":"1997","unstructured":"Lee, Y.H., Bhaskaran, K., Pinedo, M.: A heuristic to minimize the total weighted tardiness with sequence-dependent setups. IIE Transactions\u00a029, 45\u201352 (1997)","journal-title":"IIE Transactions"},{"key":"4_CR28","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/0305-0548(93)E0021-K","volume":"22","author":"P.A. Rubin","year":"1995","unstructured":"Rubin, P.A., Ragatz, G.L.: Scheduling in a sequence dependent setup environment with genetic search. Computers and Operations Research\u00a022, 85\u201399 (1995)","journal-title":"Computers and Operations Research"},{"key":"4_CR29","doi-asserted-by":"publisher","first-page":"619","DOI":"10.1016\/S0305-0483(97)00024-8","volume":"25","author":"K.C. Tan","year":"1997","unstructured":"Tan, K.C., Narasimhan, R.: Minimizing tardiness on a single processor with sequencedependent setup times: a simulated annealing approach. Omega\u00a025, 619\u2013634 (1997)","journal-title":"Omega"},{"key":"4_CR30","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/S0305-0483(99)00050-X","volume":"28","author":"K.C. Tan","year":"2000","unstructured":"Tan, K.C., Narasimhan, R., Rubin, P.A., Ragatz, G.L.: A comparison of four methods for minimizing total tardiness on a single processor with sequence-dependent setup times. Omega\u00a028, 313\u2013326 (2000)","journal-title":"Omega"},{"key":"4_CR31","unstructured":"Cicirello, V.A.: Weighted Tardiness Scheduling with Sequence-Dependent Setups: A Benchmark Library, The Robotics Institute, Carnegie Mellon University, Pittsburgh, PA (2004), \n                    \n                      http:\/\/www.cs.drexel.edu\/~cicirello\/benchmarks\/wtsbenchmarks.pdf"},{"key":"4_CR32","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1287\/ijoc.1.3.190","volume":"1","author":"F. Glover","year":"1989","unstructured":"Glover, F.: Tabu search-Part I. ORSA Journal on Computing\u00a01, 190\u2013206 (1989)","journal-title":"ORSA Journal on Computing"},{"key":"4_CR33","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1287\/ijoc.2.1.4","volume":"2","author":"F. Glover","year":"1990","unstructured":"Glover, F.: Tabu search-Part II. ORSA Journal on Computing\u00a02, 4\u201332 (1990)","journal-title":"ORSA Journal on Computing"},{"key":"4_CR34","doi-asserted-by":"publisher","first-page":"1243","DOI":"10.1080\/00207549408956998","volume":"32","author":"T.M. Ovacik","year":"1994","unstructured":"Ovacik, T.M., Uzsoy, R.: Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research\u00a032, 1243\u20131263 (1994)","journal-title":"International Journal of Production Research"},{"key":"4_CR35","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1016\/S0925-5273(02)00262-1","volume":"83","author":"J. Xie","year":"2003","unstructured":"Xie, J., Zahao, X., Lee, T.S.: Freezing the master production schedule under single resource constrain and demand uncertainty. International Journal of Production Economics\u00a083, 65\u201385 (2003)","journal-title":"International Journal of Production Economics"},{"key":"4_CR36","volume-title":"Manufacturing planning and control systems","author":"T.E. Vollmann","year":"1992","unstructured":"Vollmann, T.E., Berry, W.L., Whybork, D.L.: Manufacturing planning and control systems, 3rd edn. Homewood, Irwin (1992)","edition":"3"}],"container-title":["Studies in Computational Intelligence","Intelligent Computational Optimization in Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-21705-0_4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,17]],"date-time":"2019-05-17T20:18:37Z","timestamp":1558124317000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-21705-0_4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642217043","9783642217050"],"references-count":36,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-21705-0_4","relation":{},"ISSN":["1860-949X","1860-9503"],"issn-type":[{"type":"print","value":"1860-949X"},{"type":"electronic","value":"1860-9503"}],"subject":[],"published":{"date-parts":[[2011]]}}}