{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,17]],"date-time":"2025-11-17T02:50:01Z","timestamp":1763347801832},"publisher-location":"Berlin, Heidelberg","reference-count":4,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642238802"},{"type":"electronic","value":"9783642238819"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-23881-9_74","type":"book-chapter","created":{"date-parts":[[2011,9,24]],"date-time":"2011-09-24T04:51:47Z","timestamp":1316839907000},"page":"571-579","source":"Crossref","is-referenced-by-count":3,"title":["Evaluation on System Risk of Capsule Object Piped Hydraulic Transportation Based on Fuzzy Analytic Hierarchy Process"],"prefix":"10.1007","author":[{"given":"Rui","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xihuan","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yongye","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"2","key":"74_CR1","first-page":"1","volume":"24","author":"Z. Ma","year":"2005","unstructured":"Ma, Z.: Risk Management of Oil and Gas. Long Transportation Pipeline. Oil and Gas Storage and Transportation\u00a024(2), 1\u20137 (2005)","journal-title":"Long Transportation Pipeline. Oil and Gas Storage and Transportation"},{"issue":"10","key":"74_CR2","first-page":"748","volume":"72","author":"Y.D. Jo","year":"2004","unstructured":"Jo, Y.D., Park, K.S., Ahn, B.J.: Risk Assessment for a High-pressure Natural Has Pipeline in an Urban Area. Ecology and the Environment\u00a072(10), 748\u2013755 (2004)","journal-title":"Ecology and the Environment"},{"issue":"8","key":"74_CR3","first-page":"32","volume":"16","author":"w.-y. Zhang","year":"2006","unstructured":"Zhang, w.-y., Yao, a.-l., Li, y.-l., Li, k., Wu, x.-l.: Hierarchy and Fuzzy Evaluation of Embedded Gas Pipeline. China Safety Science Journal\u00a016(8), 32\u201336 (2006)","journal-title":"China Safety Science Journal"},{"issue":"1","key":"74_CR4","first-page":"84","volume":"26","author":"H. Huang","year":"2007","unstructured":"Huang, H., Yu, S., Zhou, Y.: The Application of Fuzzy Comprehensive Evaluation Methord Based on AHP on Scheme Evaluation. Value Engineering\u00a026(1), 84\u201386 (2007)","journal-title":"Value Engineering"}],"container-title":["Lecture Notes in Computer Science","Artificial Intelligence and Computational Intelligence"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-23881-9_74","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,7]],"date-time":"2019-04-07T19:42:35Z","timestamp":1554666155000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-23881-9_74"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642238802","9783642238819"],"references-count":4,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-23881-9_74","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2011]]}}}