{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T09:47:08Z","timestamp":1743068828152,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":16,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642239373"},{"type":"electronic","value":"9783642239380"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-23938-0_7","type":"book-chapter","created":{"date-parts":[[2011,9,11]],"date-time":"2011-09-11T20:40:55Z","timestamp":1315773655000},"page":"60-69","source":"Crossref","is-referenced-by-count":12,"title":["A Multi-Agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem"],"prefix":"10.1007","author":[{"given":"Si Larabi","family":"Khelifati","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fatima","family":"Benbouzid-Sitayeb","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"7_CR1","doi-asserted-by":"publisher","first-page":"534","DOI":"10.1016\/S0377-2217(03)00261-3","volume":"153","author":"R. Aggoune","year":"2004","unstructured":"Aggoune, R.: Minimizing the makespan for the flow shop scheduling problem with availability constraints. European Journal of Operational Research\u00a0153, 534\u2013543 (2004)","journal-title":"European Journal of Operational Research"},{"key":"7_CR2","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"47","author":"H. Allaoui","year":"2004","unstructured":"Allaoui, H., Artiba, A.: Integrating simulation and optimization to scheduling a hybrid flow shop with maintenance constraints. Computers and Industrial Engineering\u00a047, 431\u2013450 (2004)","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"7_CR3","first-page":"103","volume":"31","author":"F. Bellifemine","year":"2001","unstructured":"Bellifemine, F., Poggi, A., Rimassa, G.: Developing Multi-agent Systems with a FIPA-compliant Agent Framework. Software: Practice and Experience\u00a031(2), 103\u2013128 (2001)","journal-title":"Software: Practice and Experience"},{"key":"7_CR4","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"782","DOI":"10.1007\/3-540-44869-1_99","volume-title":"Artificial Neural Nets. Problem Solving Methods","author":"F. Benbouzid","year":"2003","unstructured":"Benbouzid, F., Varnier, C., Zerhouni, N.: Resolution of joint maintenance\/production scheduling by sequential and integrated strategies. In: Mira, J., \u00c1lvarez, J.R. (eds.) IWANN 2003. LNCS, vol.\u00a02687, pp. 782\u2013789. Springer, Heidelberg (2003)"},{"issue":"6","key":"7_CR5","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"C.R. Cassady","year":"2003","unstructured":"Cassady, C.R., Kutanoglu, E.: Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Transactions\u00a035(6), 503\u2013513 (2003)","journal-title":"IIE Transactions"},{"issue":"18","key":"7_CR6","doi-asserted-by":"publisher","first-page":"4611","DOI":"10.1080\/00207540210159545","volume":"40","author":"T. Coudert","year":"2002","unstructured":"Coudert, T., Grabot, B., Archimede, B.: Production \/Maintenance Co-operative Scheduling Using Multi-Agents and Fuzzy Logic. International Journal of Production Research\u00a040(18), 4611\u20134632 (2002)","journal-title":"International Journal of Production Research"},{"issue":"1","key":"7_CR7","doi-asserted-by":"publisher","first-page":"27","DOI":"10.3166\/jds.13.27-62","volume":"13","author":"T. Coudert","year":"2004","unstructured":"Coudert, T., Grabot, B., Archimede, B.: Systmes multi-agents et logique floue pour un ordonnancement cooperatif Production\/Maintenance. Journal of Decision Systems\u00a013(1), 27\u201362 (2004)","journal-title":"Journal of Decision Systems"},{"key":"7_CR8","volume-title":"Multi-Agent Systems: an Introduction to Distributed Artificial Intelligence.","author":"J. Ferber","year":"1999","unstructured":"Ferber, J.: Multi-Agent Systems: an Introduction to Distributed Artificial Intelligence. Addison-Wesley, Reading (1999)"},{"issue":"7","key":"7_CR9","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1108\/01443579410062121","volume":"14","author":"C.W. Gits","year":"1994","unstructured":"Gits, C.W.: Structuring maintenance control systems. International Journal of Operations and Production Management\u00a014(7), 7\u201315 (1994)","journal-title":"International Journal of Operations and Production Management"},{"key":"7_CR10","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3","volume":"47","author":"C.Y. Lee","year":"2000","unstructured":"Lee, C.Y., Chen, Z.L.: Scheduling jobs and maintenance activities on parallel machines. Naval Research Logistics\u00a047, 145\u2013165 (2000)","journal-title":"Naval Research Logistics"},{"issue":"8","key":"7_CR11","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1108\/01443579410067135","volume":"14","author":"N.M. Paz","year":"1994","unstructured":"Paz, N.M., Leigh, W.: maintenance scheduling: issues, results and research needs. International Journal Of Operations and Production Management\u00a014(8), 47\u201369 (1994)","journal-title":"International Journal Of Operations and Production Management"},{"key":"7_CR12","unstructured":"Ricordel, P.-M.: Programmation Oriente Multi-Agents: Dveloppement et Dploiement de Systmes Multi Agents Voyelles, Ph.D. Thesis, Grenoble University, France (2001)"},{"key":"7_CR13","doi-asserted-by":"publisher","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R. Ruiz","year":"2007","unstructured":"Ruiz, R., Garca-Daz, J.C., Maroto, C.: Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers and Operations Research\u00a034, 3314\u20133330 (2007)","journal-title":"Computers and Operations Research"},{"issue":"2","key":"7_CR14","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1007\/BF03325096","volume":"1","author":"W. Shen","year":"1999","unstructured":"Shen, W., Norrie, D.H.: Agent-based system for intelligent manufacturing: a state of the art survey. Knowledge and Information Systems\u00a01(2), 129\u2013156 (1999)","journal-title":"Knowledge and Information Systems"},{"key":"7_CR15","doi-asserted-by":"publisher","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","volume":"64","author":"E. Taillard","year":"1993","unstructured":"Taillard, E.: Benchmarks for basic scheduling problems. European Journal of Operational Research\u00a064, 278\u2013285 (1993)","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"7_CR16","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1017\/S0269888900008122","volume":"10","author":"M. Wooldridge","year":"1995","unstructured":"Wooldridge, M., Jennings, N.R.: Intelligent agents: theory and practice. The Knowledge Engineering Review\u00a010(2), 115\u2013152 (1995)","journal-title":"The Knowledge Engineering Review"}],"container-title":["Lecture Notes in Computer Science","Computational Collective Intelligence. Technologies and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-23938-0_7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,3]],"date-time":"2019-04-03T17:17:22Z","timestamp":1554311842000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-23938-0_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642239373","9783642239380"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-23938-0_7","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2011]]}}}