{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,27]],"date-time":"2026-04-27T23:05:08Z","timestamp":1777331108767,"version":"3.51.4"},"publisher-location":"Berlin, Heidelberg","reference-count":42,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642272066","type":"print"},{"value":"9783642272073","type":"electronic"}],"license":[{"start":{"date-parts":[[2011,1,1]],"date-time":"2011-01-01T00:00:00Z","timestamp":1293840000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011]]},"DOI":"10.1007\/978-3-642-27207-3_9","type":"book-chapter","created":{"date-parts":[[2011,12,2]],"date-time":"2011-12-02T09:05:35Z","timestamp":1322816735000},"page":"74-84","source":"Crossref","is-referenced-by-count":2,"title":["Development of Intelligent Effort Estimation Model Based on Fuzzy Logic Using Bayesian Networks"],"prefix":"10.1007","author":[{"given":"Jahangir","family":"Khan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zubair A.","family":"Shaikh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abou Bakar","family":"Nauman","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"9_CR1","unstructured":"Royce, W.: Software Project Management, A Unified Frame work. Pearson Education (2000)"},{"key":"9_CR2","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1016\/S0950-5849(96)00006-7","volume":"39","author":"A.R. Gray","year":"1997","unstructured":"Gray, A.R., MacDonell, S.G.: A comparison of techniques for developing predictive models of software metrics. Information and Software Technology\u00a039, 425\u2013437 (1997)","journal-title":"Information and Software Technology"},{"key":"9_CR3","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1023\/A:1018991717352","volume":"10","author":"B. Boehm","year":"2000","unstructured":"Boehm, B., Abts, C., Chulani, S.: Software development cost estimation ap-proaches-\u2014A survey. Annals of Software Engineering\u00a010, 177\u2013205 (2000)","journal-title":"Annals of Software Engineering"},{"key":"9_CR4","doi-asserted-by":"crossref","unstructured":"Azzeh, M., et al.: Software Effort Estimation Based on Weighted Fuzzy Grey Relational Analysis. ACM (2009)","DOI":"10.1145\/1540438.1540450"},{"key":"9_CR5","doi-asserted-by":"crossref","unstructured":"Bohem, B., et al.: Cost models for future life cycle processes: COCOMO2.0. Annals of Software Engineering 1 (1995)","DOI":"10.1007\/BF02249046"},{"key":"9_CR6","unstructured":"ISBSG data release 10 (2007), http:\/\/www.isbsg.org (accessed on February 18, 2009)"},{"key":"9_CR7","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1007\/978-3-642-22386-0_18","volume-title":"Software Engineering Techniques","author":"A. Trendowicz","year":"2011","unstructured":"Trendowicz, A., M\u00fcnch, J., Jeffery, R.: State of the Practice in Software Effort Estimation: A Survey and Literature Review. In: Huzar, Z., Koci, R., Meyer, B., Walter, B., Zendulka, J. (eds.) CEE-SET 2008. LNCS, vol.\u00a04980, pp. 232\u2013245. Springer, Heidelberg (2011), doi:10.1007\/978-3-642-22386-0_18"},{"key":"9_CR8","doi-asserted-by":"crossref","unstructured":"Li, J., Ruhe, G.: Decision Support Analysis for Software Effort Estimation by Analogy. In: Third International Workshop on Predictor Models in Software Engineering (PROMISE 2007) (2007)","DOI":"10.1109\/PROMISE.2007.5"},{"key":"9_CR9","unstructured":"Larman, C.: Agile and Iterative Development: A Manager\u2019s Guide. Addison Wesley (2003)"},{"key":"9_CR10","doi-asserted-by":"crossref","unstructured":"Witting, G., Finnie, G.: Estimating software development effort with connectionist models. In: Proceedings of the Information and Software Technology Conference, pp. 469\u2013476 (1997)","DOI":"10.1016\/S0950-5849(97)00004-9"},{"key":"9_CR11","doi-asserted-by":"crossref","unstructured":"Trendowicz, A., Heidrich, J., M\u00fcnch, J., Ishigai, Y., Yokoyama, K., Kikuchi, N.: Development of a hybrid cost estimation model in an iterative manner. In: ICSE 2006, Shanghai, China, May 20-28 (2006)","DOI":"10.1145\/1134285.1134332"},{"key":"9_CR12","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.infsof.2004.05.004","volume":"47","author":"M.A. Ahmeda","year":"2005","unstructured":"Ahmeda, M.A., Saliub, M.O., AlGhamdia, J.: Adaptive fuzzy logic-based framework for software development effort prediction. Information and Software Technology\u00a047, 31\u201348 (2005)","journal-title":"Information and Software Technology"},{"key":"9_CR13","doi-asserted-by":"crossref","unstructured":"Verma, H.K., Sharma, V.: Handling imprecision in inputs using fuzzy logic to predict effort in software development. In: 2010 IEEE 2nd International Advance Computing Conference (IACC), February 19-20 (2010), references cited: 25","DOI":"10.1109\/IADCC.2010.5422889"},{"key":"9_CR14","doi-asserted-by":"crossref","unstructured":"Ahmed, M.A., Muzaffar, Z.: Handling imprecision and uncertainty in software development effort prediction: A type-2 fuzzy logic based framework. Journal Information and Software Technology 51(3) (March 2009) cited 2, acm","DOI":"10.1016\/j.infsof.2008.09.004"},{"key":"9_CR15","unstructured":"Jensen, F.V.: An Introduction to Bayesian Networks. UCL Press (1996)"},{"key":"9_CR16","unstructured":"Murphy, K.: A Brief Introduction to Graphical Models and Bayesian Networks (1998)"},{"key":"9_CR17","doi-asserted-by":"crossref","unstructured":"Fenton, N.E., Krause, P., Lane, C., Neil, M.: A Probabilistic Model for Software Defect Prediction, citeseer, manuscript available from the authors (2001)","DOI":"10.1007\/3-540-44652-4_39"},{"issue":"7","key":"9_CR18","doi-asserted-by":"publisher","first-page":"615","DOI":"10.1109\/TSE.2005.75","volume":"31","author":"P.C. Pendharkar","year":"2005","unstructured":"Pendharkar, P.C., Subramanian, G.H., Rodger, J.A.: A Probabilistic Model for Predicting Software Development Effort. IEEE Transactions on Software Engineering\u00a031(7), 615\u2013624 (2005)","journal-title":"IEEE Transactions on Software Engineering"},{"key":"9_CR19","doi-asserted-by":"crossref","unstructured":"Martin, N., Fenton, N.E., Nielson, L.: Building large-scale Bayesian networks. Journal of Knowledge Engineering Review\u00a015(3) (2000)","DOI":"10.1017\/S0269888900003039"},{"key":"9_CR20","unstructured":"Bibi, S., Stamelos, I.: Software Process Modeling with Bayesian Belief Networks. In: IEEE Software Metrics 2004, Online proceedings (2004)"},{"key":"9_CR21","unstructured":"Shamsaei, A.: M.Sc. Project report, Advanced Method in computer science at the University of London (2005)"},{"key":"9_CR22","doi-asserted-by":"crossref","unstructured":"Hearty, P., Fenton, N.E., Marquez, D., Neil, M.: Predicting Project Velocity in XP using a Learning Dynamic Bayesian Network Model. IEEE Transactions on Software Engineering 35(1) (January 2009)","DOI":"10.1109\/TSE.2008.76"},{"key":"9_CR23","doi-asserted-by":"crossref","unstructured":"Fenton, N.E., Marsh, W., Neil, M., Cates, P., Forey, S., Tailor, M.: Making Resource Decisions for Software Projects. In: Proceedings of the 26th International Conference on Software Engineering (ICSE 2004) (2004)","DOI":"10.1109\/ICSE.2004.1317462"},{"key":"9_CR24","doi-asserted-by":"crossref","unstructured":"Fenton, N.E., Neil, M., Marsh, W., Hearty, P., Marquez, D., Krause, P., Mishra, R.: Predicting software defects in varying development lifecycles using Bayesian Nets. Information and Software Technology\u00a049(1) (2007)","DOI":"10.1016\/j.infsof.2006.09.001"},{"key":"9_CR25","unstructured":"Khodakarami, V., Fenton, N., Neil, M.: Project scheduling: Improved approach incorporating uncertainty using Bayesian networks. Project Management Journal (2009)"},{"key":"9_CR26","unstructured":"Mendes, E.: Predicting Web Development Effort Using a Bayesian Network. In: Proceedings of 11th International Conference on Evaluation and Assessment in Software Engineering, EASE 2007, April 2-3, pp. 83\u201393 (2007)"},{"key":"9_CR27","unstructured":"Nauman, A.B., Aziz, R.: Development of Simple Effort Estimation Model based on Fuzzy Logic using Bayesian Networks. IJCA Special Issue on Artificial Intelligence Techniques - Novel Approaches & Practical Applications\u00a0(3), 4\u20137 (2011)"},{"key":"9_CR28","doi-asserted-by":"crossref","unstructured":"Gencel, C., Buglione, L., Abran, A.: Improvement Opportunities and Suggestions for Benchmarking. In: Proceedings of IWSM\/MENSURA 2009, Amsterdam, Netherlands, November 4-6, pp. 144\u2013156 (2009)","DOI":"10.1007\/978-3-642-05415-0_11"},{"key":"9_CR29","unstructured":"Lokan, C., Mendes, E.: Using Chronological Splitting to Compare Cross- and Single-company Effort Models: Further Investigation. In: 32nd Australasian Computer Science Conference, ACSC 2009, Wellington, New Zealand (January 2009)"},{"key":"9_CR30","doi-asserted-by":"crossref","unstructured":"Lokan, C., Mendes, E.: Investigating the Use of Chronological Splitting to Compare Software Cross-company and Single-company Effort Predictions. In: EASE 2008, 12th Interna-tional Conference on Evaluation and Assessment in Software Engineering, Bari, Italy (June 2008)","DOI":"10.14236\/ewic\/EASE2008.15"},{"issue":"1","key":"9_CR31","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1007\/s10664-007-9045-5","volume":"13","author":"E. Mendes","year":"2008","unstructured":"Mendes, E., Lokan, C.: Replicating Studies on Cross- vs. Single-company Effort Models using the ISBSG Data-base. Empirical Software Engineering\u00a013(1), 3\u201337 (2008)","journal-title":"Empirical Software Engineering"},{"key":"9_CR32","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1007\/978-3-540-69566-0_9","volume-title":"Product-Focused Software Process Improvement","author":"L. Buglione","year":"2008","unstructured":"Buglione, L., Gencel, C.: Impact of Base Functional Component Types on Software Functional Size based Effort Estimation. In: Jedlitschka, A., Salo, O. (eds.) PROFES 2008. LNCS, vol.\u00a05089, pp. 75\u201389. Springer, Heidelberg (2008)"},{"key":"9_CR33","unstructured":"Buglione, L., Abran, A.: Performance calculation and estimation with QEST\/LIME using ISBSG r10 data. In: Proceedings of the 5th Software Measurement European Forum (SMEF 2008), Milan, Italy, May 28-30, pp. 175\u2013192 (2008) ISBN 9-788870-909999"},{"key":"9_CR34","unstructured":"Deng, K.: The value and validity of software effort estimation models built from a multiple organization data set, Masters thesis, University of Auckland (2008)"},{"key":"9_CR35","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1002\/spip.310","volume":"12","author":"A. Abran","year":"2007","unstructured":"Abran, A., Ndiaye, I., Bourque, P.: Evaluation of a black-box estimation tool: a case study. Software Process Improvement and Practice\u00a012, 199\u2013218 (2007)","journal-title":"Software Process Improvement and Practice"},{"key":"9_CR36","first-page":"1","volume":"26","author":"J.J. Cuadrado-Gallego","year":"2007","unstructured":"Cuadrado-Gallego, J.J., Sicilia, M.-A.: An Algorithm for the Generation of Segmented Parametric Software Estimation Models and its Empirical Evaluation. Computing and Informatics\u00a026, 1\u201315 (2007)","journal-title":"Computing and Informatics"},{"issue":"1","key":"9_CR37","first-page":"46","volume":"7","author":"L. Cheikhi","year":"2006","unstructured":"Cheikhi, L., Abran, A., Buglione, L.: ISBSG Software Project Repository & ISO 9126: An Opportunity for Quality Bench-marking. European Journal for the Informatics Professional\u00a07(1), 46\u201352 (2006)","journal-title":"European Journal for the Informatics Professional"},{"key":"9_CR38","unstructured":"Desharnais, J.-M., Abran, A., Cuadrado, J.: Convertibility of Function Points to COSMIC-FFP: Identification and Analysis of Functional Outliers (2006), http:\/\/www.cc.uah.es\/cubit\/CuBITIFPUG\/MENSURA2006.pdf"},{"key":"9_CR39","doi-asserted-by":"publisher","first-page":"353","DOI":"10.1016\/j.jss.2005.04.040","volume":"79","author":"J.J. Cuadrado-Gallego","year":"2006","unstructured":"Cuadrado-Gallego, J.J., Sicilia, M.-A., Garre, M., Rodr\u00fdguez, D.: An empirical study of process related attributes in segmented software cost estimation relationships. The Journal of Systems and Software\u00a079, 353\u2013361 (2006)","journal-title":"The Journal of Systems and Software"},{"key":"9_CR40","unstructured":"Mendes, E., Lokan, C., Harrison, R., Triggs, C.: A Replicated Comparison of Cross-company and Within-company Effort Estimation Models using the ISBSG Database"},{"key":"9_CR41","unstructured":"Garre, M., Cuadrado, J.J., Sicilia, M.A., Charro, M., Rodr\u00edguez, D.: Segmented Parametric Software Estimation Models: Using the EM Algorithm with the ISBSG 8 Database"},{"key":"9_CR42","unstructured":"ISBSG Productivity table, https:\/\/sites.google.com\/a\/suit.edu.pk\/csitresearch\/"}],"container-title":["Communications in Computer and Information Science","Software Engineering, Business Continuity, and Education"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-27207-3_9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,6,11]],"date-time":"2023-06-11T07:02:46Z","timestamp":1686466966000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-27207-3_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011]]},"ISBN":["9783642272066","9783642272073"],"references-count":42,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-27207-3_9","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"value":"1865-0929","type":"print"},{"value":"1865-0937","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011]]}}}