{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T20:32:34Z","timestamp":1725654754455},"publisher-location":"Berlin, Heidelberg","reference-count":16,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642281143"},{"type":"electronic","value":"9783642281150"}],"license":[{"start":{"date-parts":[[2012,1,1]],"date-time":"2012-01-01T00:00:00Z","timestamp":1325376000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-28115-0_15","type":"book-chapter","created":{"date-parts":[[2012,1,24]],"date-time":"2012-01-24T15:44:07Z","timestamp":1327419847000},"page":"152-161","source":"Crossref","is-referenced-by-count":0,"title":["Evolutionary Algorithm for Scheduling Production Jobs and Preventive Maintenance Activities"],"prefix":"10.1007","author":[{"given":"Maher","family":"Rebai","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Imed","family":"Kacem","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kondo H.","family":"Adjallah","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"15_CR1","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1016\/j.ejor.2006.06.032","volume":"181","author":"E.H. Aghezzaf","year":"2007","unstructured":"Aghezzaf, E.H., Jamali, M.A., Ait-Kadi, D.: An integrated production and preventive maintenance planning model. European Journal of Operational Research\u00a0181, 679\u2013685 (2007)","journal-title":"European Journal of Operational Research"},{"key":"15_CR2","doi-asserted-by":"publisher","first-page":"3382","DOI":"10.1016\/j.ins.2008.05.007","volume":"178","author":"E.H. Aghezzaf","year":"2008","unstructured":"Aghezzaf, E.H., Najid, N.M.: Integrated production planning and preventive maintenance in deteriorating production systems. Information Sciences\u00a0178, 3382\u20133392 (2008)","journal-title":"Information Sciences"},{"key":"15_CR3","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1287\/mnsc.11.2.268","volume":"11","author":"W.L. Eastman","year":"1964","unstructured":"Eastman, W.L., Even, S., Isaacs, I.M.: Bounds for optimal scheduling of n jobs on m processors. Management science\u00a011, 268\u2013279 (1964)","journal-title":"Management science"},{"key":"15_CR4","doi-asserted-by":"publisher","first-page":"1150","DOI":"10.1016\/j.ejor.2008.03.043","volume":"197","author":"R. Mellouli","year":"2009","unstructured":"Mellouli, R., Cherif, S., Chou, C., Kacem, I.: Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times. European Journal of Operational Research\u00a0197, 1150\u20131167 (2009)","journal-title":"European Journal of Operational Research"},{"key":"15_CR5","doi-asserted-by":"publisher","first-page":"845","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#","volume":"46","author":"H.G. Graves","year":"1999","unstructured":"Graves, H.G., Lee, C.-Y.: Scheduling Maintenance and Semiresumable Jobs on a Single Machine. Naval Research Logistics\u00a046, 845\u2013863 (1999)","journal-title":"Naval Research Logistics"},{"key":"15_CR6","doi-asserted-by":"publisher","first-page":"827","DOI":"10.1016\/j.cor.2006.04.010","volume":"35","author":"I. Kacem","year":"2008","unstructured":"Kacem, I., Chu, C., Souissi, A.: Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times. Computers & Operations Research\u00a035, 827\u2013844 (2008)","journal-title":"Computers & Operations Research"},{"key":"15_CR7","doi-asserted-by":"publisher","first-page":"528","DOI":"10.1016\/S0377-2217(01)00083-2","volume":"136","author":"W. Kubiak","year":"2002","unstructured":"Kubiak, W., Blazewicz, J., Formanowicz, P., Breit, J., Schmidt, G.: Two-machine flow shops with limited machine availability. European Journal of Operational Research\u00a0136, 528\u2013540 (2002)","journal-title":"European Journal of Operational Research"},{"key":"15_CR8","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1016\/S0167-6377(96)00041-7","volume":"20","author":"C.-Y. Lee","year":"2000","unstructured":"Lee, C.-Y.: Minimising the makespan in the two machine scheduling scheduling problem with an availability constraint. Operational Research Letters\u00a020, 129\u2013139 (2000)","journal-title":"Operational Research Letters"},{"key":"15_CR9","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3","volume":"47","author":"C.-Y. Lee","year":"2000","unstructured":"Lee, C.-Y., Chen, Z.-L.: Scheduling Jobs and Maintenance Activities on Parallel Machines. Naval Research Logistics\u00a047, 145\u2013165 (2000)","journal-title":"Naval Research Logistics"},{"key":"15_CR10","first-page":"546","volume":"26","author":"G. Li","year":"1997","unstructured":"Li, G.: Single machine earliness and tardiness scheduling. European Journal of Operational Research\u00a026, 546\u2013558 (1997)","journal-title":"European Journal of Operational Research"},{"key":"15_CR11","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1016\/S0305-0548(98)00081-1","volume":"26","author":"C.-F. Liaw","year":"1999","unstructured":"Liaw, C.-F.: A branch and bound algorithm for the single machine earliness and tardiness scheduling problem. Computers & Operations Research\u00a026, 679\u2013693 (1999)","journal-title":"Computers & Operations Research"},{"issue":"2","key":"15_CR12","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1287\/opre.33.2.363","volume":"33","author":"C.N. Potts","year":"1985","unstructured":"Potts, C.N., van Wassenhove, L.N.: A Branch and Bound Algorithm for the Total Weighted Tardiness Problem. Operations Research\u00a033(2), 363\u2013377 (1985)","journal-title":"Operations Research"},{"doi-asserted-by":"crossref","unstructured":"Rebai, M., Kacem, I., Adjallah, K.H.: Earliness tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods. Journal of Intelligent Manufacturing (2010), doi:10.1007\/s10845-010-0425-0","key":"15_CR13","DOI":"10.1007\/s10845-010-0425-0"},{"unstructured":"Rebai, M.: Ordonnancement des taches de production et de maintenance preventive sur machines paralleles. PhD Thesis of Troyes University of Technology 2011, Troyes, France July 1 (2011)","key":"15_CR14"},{"key":"15_CR15","doi-asserted-by":"publisher","first-page":"1305","DOI":"10.1016\/j.ejor.2006.05.052","volume":"189","author":"F. Sourd","year":"2008","unstructured":"Sourd, F., Keded-Sidhoum, S., Rio Solis, Y.: Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates. European Journal of Operational Research\u00a0189, 1305\u20131319 (2008)","journal-title":"European Journal of Operational Research"},{"key":"15_CR16","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W.E. Smith","year":"1956","unstructured":"Smith, W.E.: Various optimizers for single-stage production. Naval Research Logistics Quarterly\u00a03, 59\u201366 (1956)","journal-title":"Naval Research Logistics Quarterly"}],"container-title":["Lecture Notes in Business Information Processing","Business Process Management Workshops"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-28115-0_15","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,25]],"date-time":"2019-04-25T05:27:56Z","timestamp":1556170076000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-28115-0_15"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642281143","9783642281150"],"references-count":16,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-28115-0_15","relation":{},"ISSN":["1865-1348","1865-1356"],"issn-type":[{"type":"print","value":"1865-1348"},{"type":"electronic","value":"1865-1356"}],"subject":[],"published":{"date-parts":[[2012]]}}}