{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,6]],"date-time":"2025-10-06T18:54:17Z","timestamp":1759776857751,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":9,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642292095"},{"type":"electronic","value":"9783642292101"}],"license":[{"start":{"date-parts":[[2012,1,1]],"date-time":"2012-01-01T00:00:00Z","timestamp":1325376000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2012,1,1]],"date-time":"2012-01-01T00:00:00Z","timestamp":1325376000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-29210-1_72","type":"book-chapter","created":{"date-parts":[[2012,6,6]],"date-time":"2012-06-06T14:47:55Z","timestamp":1338994075000},"page":"451-456","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Enhancing Aggregate Production Planning with an Integrated Stochastic Queuing Model"],"prefix":"10.1007","author":[{"given":"Gerd J.","family":"Hahn","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chris","family":"Kaiser","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Heinrich","family":"Kuhn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lien","family":"Perdu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nico J.","family":"Vandaele","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,4,14]]},"reference":[{"key":"72_CR1","doi-asserted-by":"publisher","first-page":"142","DOI":"10.1002\/nav.20335","volume":"56","author":"J Asmundsson","year":"2009","unstructured":"Asmundsson, J., Rardin, R.L., Turkseven, C.H., Uzsoy, R.: Production planning with resources subject to congestion. Nav. Res. Logist. 56, 142\u2013157 (2009)","journal-title":"Nav. Res. Logist."},{"key":"72_CR2","volume-title":"Factory physics","author":"WJ Hopp","year":"2008","unstructured":"Hopp, W.J., Spearman, M.L.: Factory physics. McGraw-Hill\/Irwin, New York (2008)"},{"key":"72_CR3","first-page":"55","volume":"18","author":"Y-F Hung","year":"2001","unstructured":"Hung, Y.-F., Hou, M.-C.: A production planning approach based on iterations of linear programming optimization and flow time prediction. J. Chin. Inst. Ind. Eng. 18, 55\u201367 (2001)","journal-title":"J. Chin. Inst. Ind. Eng."},{"key":"72_CR4","doi-asserted-by":"crossref","unstructured":"Jansen, M.M., de Kok, T.G., Fransoo, J.C.: Lead time anticipation in supply chain operations planning. OR Spectrum (2011) doi: 10.1007\/s00291-011-0267-y","DOI":"10.1007\/s00291-011-0267-y"},{"key":"72_CR5","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1287\/mnsc.33.3.409","volume":"33","author":"US Karmarkar","year":"1987","unstructured":"Karmarkar, U.S.: Lot sizes, lead times and in-process inventories. Manag. Sci. 33, 409\u2013418 (1987)","journal-title":"Manag. Sci."},{"key":"72_CR6","doi-asserted-by":"crossref","first-page":"1548","DOI":"10.1287\/mnsc.44.11.1548","volume":"44","author":"M.R Lambrecht","year":"1998","unstructured":"Lambrecht, M.R, Ivens, P.L., Vandaele, N.J.: ACLIPS \u2013 a capacity and lead time integrated procedure for scheduling. Manag. Sci. 44, 1548\u20131561 (1998)","journal-title":"Manag. Sci."},{"key":"72_CR7","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/0377-2217(92)90356-E","volume":"61","author":"S-J Nam","year":"1992","unstructured":"Nam, S.-J., Logendran, R.: Aggregate production planning \u2013 a survey of models and methodologies. Eur. J. Oper. Res. 61, 255\u2013272 (1992)","journal-title":"Eur. J. Oper. Res."},{"key":"72_CR8","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1007\/s10479-007-0173-5","volume":"153","author":"J Pahl","year":"2007","unstructured":"Pahl, J., Vo\u00df, S., Woodruff, D.L.: Production planning with load dependent lead times \u2013 an update of research. Ann. Oper. Res. 153, 297\u2013345 (2007)","journal-title":"Ann. Oper. Res."},{"key":"72_CR9","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0377-2217(95)00062-U","volume":"86","author":"V. S\u00a8ohner","year":"1995","unstructured":"S\u00a8ohner, V., Schneeweiss, C.: Hierarchically integrated lot size optimization. Eur. J. Oper. Res. 86, 73\u201390 (1995)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2011"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-29210-1_72","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,11]],"date-time":"2023-02-11T21:53:35Z","timestamp":1676152415000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-29210-1_72"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642292095","9783642292101"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-29210-1_72","relation":{},"ISSN":["0721-5924"],"issn-type":[{"type":"print","value":"0721-5924"}],"subject":[],"published":{"date-parts":[[2012]]},"assertion":[{"value":"14 April 2012","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}