{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T05:31:57Z","timestamp":1725687117202},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642292095"},{"type":"electronic","value":"9783642292101"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-29210-1_75","type":"book-chapter","created":{"date-parts":[[2012,6,6]],"date-time":"2012-06-06T14:47:55Z","timestamp":1338994075000},"page":"471-476","source":"Crossref","is-referenced-by-count":3,"title":["Lower bounds for a multi-skill project scheduling problem"],"prefix":"10.1007","author":[{"given":"Cheikh","family":"Dhib","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Anis","family":"Kooli","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ameur","family":"Soukhal","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Emmanuel","family":"N\u00e9ron","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,4,14]]},"reference":[{"key":"75_CR1","unstructured":"Montoya, C., Bellenguez-Morineau, O., Rivreau, D.: New models for the multi-skill project scheduling problem. In EURO 2010. Lisbonne, July 2010."},{"key":"75_CR2","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1007\/s00291-009-0169-4","volume":"32","author":"Ch Heimerl","year":"2010","unstructured":"Heimerl, Ch., Kolisch, R.: Scheduling and staffing multiple projects with a multi- skilled workforce. OR Spectrum. 32, 343\u2013368 (2010)","journal-title":"OR Spectrum."},{"key":"75_CR3","unstructured":"Dhib, Ch., Roumdani, T., Soukhal, A., N\u00b4eron, E.: Bornes infrieures pour un problme dordonnancement de projets multi-comptence premptif. ROADEF 2011, Saint Etienne, France, 2011."},{"key":"75_CR4","doi-asserted-by":"crossref","first-page":"252","DOI":"10.1080\/05695557808975212","volume":"10","author":"J. Stinson","year":"1978","unstructured":"Stinson,J., Davis, E., Khumawala, B.:Multiple resource constraine d scheduling using branch and bound, AIEE Transactions 10 (1978) 252-259.","journal-title":"AIEE Transactions"},{"key":"75_CR5","doi-asserted-by":"crossref","unstructured":"Haouari, M., Kooli, A., N\u00b4eron, E.: Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem. Computers & Operations Research. (2011) doi:10.1016\/j.cor.2011.05.022","DOI":"10.1016\/j.cor.2011.05.022"},{"key":"75_CR6","doi-asserted-by":"crossref","unstructured":"Bellenguez-Morineau, O., N\u00b4eron, E.: Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills. In Practice and Theory of Automated Timetabling (PATAT2004), pages 429432, Pittsburgh, PA, USA, 2004.","DOI":"10.1007\/11593577_14"},{"key":"75_CR7","unstructured":"Bellenguez-Morineau, O., N\u00b4eron, E.: Methods for solving the multi-skill project scheduling problem. In 9th International Workshop on Project Management and Scheduling (PMS2004), pages 6669, Nancy, France, 2004."},{"key":"75_CR8","first-page":"305","volume":"92","author":"P Baptiste","year":"1999","unstructured":"Baptiste, P., Le Pape, C., Nuijten, W.: Constrained project scheduling problem, Satisfiability tests and time bound adjustments for cumulative scheduling problems. Annals of Operations Research . 92, 305\u2013333 (1999)","journal-title":"Satisfiability tests and time bound adjustments for cumulative scheduling problems. Annals of Operations Research."},{"key":"75_CR9","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R Kolisch","year":"1997","unstructured":"Kolisch, R., Sprecher, A., Drexl, A.: PSPLIB-a project scheduling library. European Journal of Operational Research. 96, 205\u2013216 (1997).","journal-title":"European Journal of Operational Research."},{"issue":"1","key":"75_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource- constrained project scheduling problem. European Journal of Operational Research. 207(1), 1\u201314 (2010)","journal-title":"European Journal of Operational Research."}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2011"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-29210-1_75.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T11:31:44Z","timestamp":1620127904000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-29210-1_75"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642292095","9783642292101"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-29210-1_75","relation":{},"ISSN":["0721-5924"],"issn-type":[{"type":"print","value":"0721-5924"}],"subject":[],"published":{"date-parts":[[2012]]}}}