{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,6]],"date-time":"2025-04-06T19:40:09Z","timestamp":1743968409225,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":25,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642321283"},{"type":"electronic","value":"9783642321290"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-32129-0_11","type":"book-chapter","created":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T11:41:24Z","timestamp":1344598884000},"page":"53-63","source":"Crossref","is-referenced-by-count":8,"title":["0-1 Integer Programming for Generation Maintenance Scheduling in Power Systems Based on Teaching Learning Based Optimization (TLBO)"],"prefix":"10.1007","author":[{"given":"Suresh Chandra","family":"Satapathy","sequence":"first","affiliation":[]},{"given":"Anima","family":"Naik","sequence":"additional","affiliation":[]},{"given":"K.","family":"Parvathi","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"11_CR1","doi-asserted-by":"crossref","unstructured":"Mohammadi Tabari, N., Pirmoradian, M., Hassanpour, S.B.: Implicit enumeration based 0- 1 integer programming for generation maintenance scheduling. In: Proceedings of the International Conference on Computational Technologies in Electrical and Electronics Engineering, IEEE REGION 8 SIBIRCON 2008, pp. 151\u2013154 (2008)","DOI":"10.1109\/SIBIRCON.2008.4602605"},{"issue":"1","key":"11_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ins.2011.08.006","volume":"183","author":"R.V. Rao","year":"2012","unstructured":"Rao, R.V., Savsani, V.J., Vakharia, D.P.: Teaching-Learning-Based Optimization: An optimization method for continuous non-linear large scale problems. Information Sciences\u00a0183(1), 1\u201315 (2012)","journal-title":"Information Sciences"},{"issue":"3","key":"11_CR3","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1016\/j.cad.2010.12.015","volume":"43","author":"R.V. Rao","year":"2011","unstructured":"Rao, R.V., Savsani, V.J., Vakharia, D.P.: Teaching-learning-based optimization: A novel method for constrained mechanical design optimization problems. Computer-Aided Design\u00a043(3), 303\u2013315 (2011)","journal-title":"Computer-Aided Design"},{"key":"11_CR4","doi-asserted-by":"crossref","unstructured":"Rao, R.V., Savsani, V.J., Balic, J.: Teaching-learning-based optimization algorithm for unconstrained and constrained real parameter optimization problems. Engineering Optimization (in press, 2012), http:\/\/dx.doi.org\/10.1080\/0305215X.2011.652103","DOI":"10.1080\/0305215X.2011.652103"},{"key":"11_CR5","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1016\/j.cad.2010.12.015","volume":"43","author":"R.V. Rao","year":"2011","unstructured":"Rao, R.V., Savsani, V.J., Vakharia, D.P.: Teaching\u2013learning-based optimization: A novel method for constrained mechanical design optimization problems. Elsevier, Computer- Aided Design\u00a043, 303\u2013315 (2011)","journal-title":"Elsevier, Computer- Aided Design"},{"key":"11_CR6","unstructured":"Leou, R.C., Yih, S.A.: A flexible unit maintenance scheduling using fuzzy 0-1 integer programming. In: Proceedings of IEEE Power Engineering Society Summer Meeting, pp. 2551\u20132555 (2000)"},{"key":"11_CR7","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1109\/59.932294","volume":"16","author":"R.C. Leou","year":"2001","unstructured":"Leou, R.C.: A flexibleunit maintenance scheduling considering uncertainties. IEEE Transactions on Power Systems\u00a016, 552\u2013559 (2001)","journal-title":"IEEE Transactions on Power Systems"},{"key":"11_CR8","unstructured":"Fetanat, A., Shafipour, G.: Harmony Search Algorithm Based 0-1 Integer Programming For Generation Maintenance Scheduling in Power Systems. Journal of Theoretical and Applied Information Technology"},{"key":"11_CR9","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/0378-7796(92)90042-Y","volume":"24","author":"C.J. Huang","year":"1992","unstructured":"Huang, C.J., Lin, C.E., Huang, C.L.: Fuzzy approach for generator maintenance scheduling. Electr. Power Syst. Res.\u00a024, 31\u201338 (1992)","journal-title":"Electr. Power Syst. Res."},{"key":"11_CR10","doi-asserted-by":"publisher","first-page":"1063","DOI":"10.1109\/59.709100","volume":"13","author":"M.K.C. Marwali","year":"1998","unstructured":"Marwali, M.K.C., Shahidehpour, S.M.: Integrated generation and transmission maintenance scheduling with network constraints. IEEE Transactions on Power Systems\u00a013, 1063\u20131068 (1998)","journal-title":"IEEE Transactions on Power Systems"},{"key":"11_CR11","doi-asserted-by":"publisher","first-page":"626","DOI":"10.1016\/j.ijepes.2009.06.006","volume":"31","author":"T. Geetha","year":"2009","unstructured":"Geetha, T., Shanti Swarup, K.: Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems. International Journal of Electrical Power & Energy Systems\u00a031, 626\u2013638 (2009)","journal-title":"International Journal of Electrical Power & Energy Systems"},{"key":"11_CR12","doi-asserted-by":"publisher","first-page":"1475","DOI":"10.1109\/59.736293","volume":"13","author":"D. Chattopadhyay","year":"1998","unstructured":"Chattopadhyay, D.: A practical maintenance scheduling program: mathematical model and case study. IEEE Transactions on Power Systems\u00a013, 1475\u20131480 (1998)","journal-title":"IEEE Transactions on Power Systems"},{"key":"11_CR13","doi-asserted-by":"publisher","first-page":"838","DOI":"10.1109\/59.867182","volume":"15","author":"E.L. Dailva","year":"2000","unstructured":"Dailva, E.L., Schilling, M.T., Rafael, M.C.: Generation maintenance scheduling considering transmission constraints. IEEE Transactions on Power Systems\u00a015, 838\u2013843 (2000)","journal-title":"IEEE Transactions on Power Systems"},{"key":"11_CR14","doi-asserted-by":"publisher","first-page":"1117","DOI":"10.1109\/59.871742","volume":"15","author":"M.K.C. Marwali","year":"2000","unstructured":"Marwali, M.K.C., Shahidehpour, S.M.: Short-term transmission line maintenance scheduling in a deregulated system. IEEE Transactions on Power Systems\u00a015, 1117\u20131124 (2000)","journal-title":"IEEE Transactions on Power Systems"},{"key":"11_CR15","doi-asserted-by":"publisher","first-page":"1021","DOI":"10.1109\/59.780915","volume":"14","author":"L.M. Moro","year":"1999","unstructured":"Moro, L.M., Ramos, A.: Goal programming approach to maintenance scheduling of generating units in large scale power systems. IEEE Transactions on Power Systems\u00a014, 1021\u20131028 (1999)","journal-title":"IEEE Transactions on Power Systems"},{"key":"11_CR16","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0378-7796(99)00079-6","volume":"54","author":"I. El-Amin","year":"2000","unstructured":"El-Amin, I., Duffuaa, S., Abbas, M.: A Tabu search algorithm for maintenance scheduling of generating units. Electric Power Systems Research\u00a054, 91\u201399 (2000)","journal-title":"Electric Power Systems Research"},{"key":"11_CR17","doi-asserted-by":"crossref","unstructured":"Daha, K.P., Burt, G.M., McDonald, J.R., Galloway, S.J.: Ga\/sa based hybrid techniques for the Scheduling of generator maintenance in power systems. In: Proceedings of Congress on Evolutionary Computation, pp. 547\u2013567 (2000)","DOI":"10.1109\/CEC.2000.870347"},{"key":"11_CR18","doi-asserted-by":"publisher","first-page":"233","DOI":"10.1016\/S0378-7796(96)01194-7","volume":"41","author":"S. Huang","year":"1997","unstructured":"Huang, S.: Generator maintenance scheduling: a fuzzy system approach with genetic enhancement. Electric Power Systems Research\u00a041, 233\u2013239 (1997)","journal-title":"Electric Power Systems Research"},{"key":"11_CR19","first-page":"67","volume":"67","author":"M.Y. El-Sharkh","year":"2003","unstructured":"El-Sharkh, M.Y., El-Keib, A.A., Chen, H.: A fuzzy evolutionary programming-based solution methodology for security-constrained generation maintenance scheduling. ElectricPower Systems Research\u00a067, 67\u201372 (2003)","journal-title":"ElectricPower Systems Research"},{"key":"11_CR20","doi-asserted-by":"crossref","unstructured":"Kim, H., Moon, S., Choi, J., Lee, S., Do, D., Gupta, M.M.: Generation maintenance scheduling considering air pollution based on the fuzzy theory. In: Proceedings of IEEE International Fuzzy System, pp. III-1759\u2013III-1764 (1999)","DOI":"10.1109\/FUZZY.1999.790173"},{"key":"11_CR21","doi-asserted-by":"publisher","first-page":"826","DOI":"10.1016\/j.epsr.2008.11.004","volume":"79","author":"H. Siahkali","year":"2009","unstructured":"Siahkali, H., Vakilian, M.: Electricity generation scheduling with large-scale wind farms using particle swarm optimization. Electric Power Systems Research\u00a079, 826\u2013836 (2009)","journal-title":"Electric Power Systems Research"},{"key":"11_CR22","doi-asserted-by":"crossref","unstructured":"Foong, W.K.: Ant colony optimization for power plant maintenance scheduling. PhD thesis, The University of Adelaide (2007)","DOI":"10.1007\/s10479-007-0277-y"},{"key":"11_CR23","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1007\/978-3-642-27242-4_18","volume-title":"Swarm, Evolutionary, and Memetic Computing","author":"S.C. Satapathy","year":"2011","unstructured":"Satapathy, S.C., Naik, A.: Data Clustering Based on Teaching-Learning-Based Optimization. In: Panigrahi, B.K., Suganthan, P.N., Das, S., Satapathy, S.C. (eds.) SEMCCO 2011, Part II. LNCS, vol.\u00a07077, pp. 148\u2013156. Springer, Heidelberg (2011)"},{"key":"11_CR24","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1007\/978-3-642-27172-4_82","volume-title":"Swarm, Evolutionary, and Memetic Computing","author":"K.R. Krishnanand","year":"2011","unstructured":"Krishnanand, K.R., Panigrahi, B.K., Rout, P.K., Mohapatra, A.: Application of Multi-Objective Teaching-Learning-Based Algorithm to an Economic Load Dispatch Problem with Incommensurable Objectives. In: Panigrahi, B.K., Suganthan, P.N., Das, S., Satapathy, S.C. (eds.) SEMCCO 2011, Part I. LNCS, vol.\u00a07076, pp. 697\u2013705. Springer, Heidelberg (2011)"},{"key":"11_CR25","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-2748-2","volume-title":"Mechanical design optimization using advanced optimization techniques","author":"R.V. Rao","year":"2012","unstructured":"Rao, R.V., Savsani, V.J.: Mechanical design optimization using advanced optimization techniques. Springer, London (2012)"}],"container-title":["Communications in Computer and Information Science","Contemporary Computing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-32129-0_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,6]],"date-time":"2025-04-06T19:26:59Z","timestamp":1743967619000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-32129-0_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642321283","9783642321290"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-32129-0_11","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2012]]}}}