{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T12:04:16Z","timestamp":1770984256028,"version":"3.50.1"},"publisher-location":"Berlin, Heidelberg","reference-count":19,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"value":"9783642329210","type":"print"},{"value":"9783642329227","type":"electronic"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-32922-7_1","type":"book-chapter","created":{"date-parts":[[2012,8,23]],"date-time":"2012-08-23T05:26:37Z","timestamp":1345699597000},"page":"1-12","source":"Crossref","is-referenced-by-count":2,"title":["A Hybrid Discrete Differential Evolution Algorithm for Economic Lot Scheduling Problem with Time Variant Lot Sizing"],"prefix":"10.1007","author":[{"given":"Srinjoy","family":"Ganguly","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Arkabandhu","family":"Chowdhury","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Swahum","family":"Mukherjee","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P. N.","family":"Suganthan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Swagatam","family":"Das","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tay Jin","family":"Chua","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"1_CR1","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1287\/mnsc.29.1.93","volume":"29","author":"W. Hsu","year":"1983","unstructured":"Hsu, W.: On the general feasibility test of scheduling lot sizes for several products on one machine. Management Science\u00a029, 93\u2013105 (1983)","journal-title":"Management Science"},{"key":"1_CR2","doi-asserted-by":"publisher","first-page":"1025","DOI":"10.1016\/j.cie.2011.12.030","volume":"62","author":"S. Zanoni","year":"2012","unstructured":"Zanoni, S., Segerstedt, A., Tang, O., Mazzoldi, L.: Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic policy period. Computers and Industrial Engineering\u00a062, 1025\u20131033 (2012)","journal-title":"Computers and Industrial Engineering"},{"key":"1_CR3","volume-title":"Operations Research in Production and Inventory","author":"F. Hanssmann","year":"1962","unstructured":"Hanssmann, F.: Operations Research in Production and Inventory. Wiley, New York (1962)"},{"key":"1_CR4","doi-asserted-by":"crossref","unstructured":"Tasgeterin, M.F., Bulut, O., Fadiloglu, M.M.: A discrete artificial bee colony for the economic lot scheduling problem. In: IEEE Congress on Evolutionary Computing (CEC), New Orleans, USA, pp. 347\u2013353 (2012)","DOI":"10.1109\/CEC.2011.5949639"},{"key":"1_CR5","doi-asserted-by":"publisher","first-page":"764","DOI":"10.1287\/opre.35.5.764","volume":"35","author":"G. Dobson","year":"1987","unstructured":"Dobson, G.: The economic lot scheduling problem: achieving feasibility using time- varying lot sizes. Operations Research\u00a035, 764\u2013771 (1987)","journal-title":"Operations Research"},{"key":"1_CR6","doi-asserted-by":"publisher","first-page":"355","DOI":"10.1016\/S0305-0483(96)00056-4","volume":"25","author":"J. Grznar","year":"1997","unstructured":"Grznar, J., Riggle, C.: An optimal algorithm for the basic period approach to the economic lot schedule problem. Omega\u00a025, 355\u2013364 (1997)","journal-title":"Omega"},{"key":"1_CR7","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1007\/s11590-009-0154-5","volume":"4","author":"H. Sun","year":"2010","unstructured":"Sun, H., Huang, H., Jaruphongsa, W.: The economic lot scheduling problem under extended basic period and power-of-two policy. Optimization Letters\u00a04, 157\u2013172 (2010)","journal-title":"Optimization Letters"},{"key":"1_CR8","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1002\/nav.3800110202","volume":"11","author":"W. Maxwell","year":"1964","unstructured":"Maxwell, W.: The scheduling of economic lot sizes. Naval Research Logistics Quarterly\u00a011, 89\u2013124 (1964)","journal-title":"Naval Research Logistics Quarterly"},{"key":"1_CR9","doi-asserted-by":"publisher","first-page":"778","DOI":"10.1287\/mnsc.12.11.778","volume":"12","author":"E. Bomberger","year":"1966","unstructured":"Bomberger, E.: A dynamic programming approach to a lot size scheduling problem. Management Science\u00a012, 778\u2013784 (1966)","journal-title":"Management Science"},{"issue":"4","key":"1_CR10","doi-asserted-by":"publisher","first-page":"809","DOI":"10.1080\/00207540110095222","volume":"40","author":"I. Moon","year":"2002","unstructured":"Moon, I., Silver, E.A., Choi, S.: Hybrid Genetic Algorithm for the Economic Lot Scheduling Problem. International Journal of Production Research\u00a040(4), 809\u2013824 (2002)","journal-title":"International Journal of Production Research"},{"issue":"1","key":"1_CR11","doi-asserted-by":"publisher","first-page":"56","DOI":"10.1287\/opre.39.1.56","volume":"39","author":"P.H. Zipkin","year":"1991","unstructured":"Zipkin, P.H.: Computing optimal lot sizes in the economic lot scheduling problem. Operations Research\u00a039(1), 56\u201363 (1991)","journal-title":"Operations Research"},{"issue":"1-3","key":"1_CR12","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1016\/0925-5273(95)00072-0","volume":"41","author":"C. Dagli","year":"1993","unstructured":"Dagli, C., Sittisathanchai, S.: Genetic neuro-scheduler for job shop scheduling. International Journal of Production Economics\u00a041(1-3), 135\u2013145 (1993)","journal-title":"International Journal of Production Economics"},{"key":"1_CR13","first-page":"42","volume-title":"Genetic Algorithms and Simulated Annealing","author":"J.J. Grefenstette","year":"1987","unstructured":"Grefenstette, J.J.: Incorporating problem specific knowledge into genetic algorithms. In: Davis, L. (ed.) Genetic Algorithms and Simulated Annealing, pp. 42\u201360. Morgan Kaufmann, Los Altos (1987)"},{"issue":"1","key":"1_CR14","doi-asserted-by":"publisher","first-page":"4","DOI":"10.1109\/TEVC.2010.2059031","volume":"15","author":"S. Das","year":"2011","unstructured":"Das, S., Suganthan, P.N.: Differential evolution: a strategy of the state of the art. IEEE Transactions on Evolutionary Computation\u00a015(1), 4\u201331 (2011)","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"1_CR15","doi-asserted-by":"publisher","first-page":"795","DOI":"10.1016\/j.cie.2008.03.003","volume":"55","author":"Q.K. Pan","year":"2007","unstructured":"Pan, Q.K., Tasgetiren, M.F., Liang, Y.: A discrete differential evolution algorithm for the discrete flow-shop scheduling problem. Computers and Industrial Engineering\u00a055, 795\u2013816 (2007)","journal-title":"Computers and Industrial Engineering"},{"key":"1_CR16","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1016\/0305-0483(92)90027-5","volume":"20","author":"R. Mallya","year":"1992","unstructured":"Mallya, R.: Multi-product scheduling on a single machine: a case study. Omega\u00a020, 529\u2013534 (1992)","journal-title":"Omega"},{"key":"1_CR17","doi-asserted-by":"publisher","first-page":"509","DOI":"10.1016\/S0377-2217(97)00270-1","volume":"110","author":"M. Khouza","year":"1998","unstructured":"Khouza, M., Michalewicz, Z., Wilmot, M.: The use of genetic algorithms to solve the economic lot size scheduling problem. European Journal of Operational Research\u00a0110, 509\u2013524 (1998)","journal-title":"European Journal of Operational Research"},{"key":"1_CR18","doi-asserted-by":"publisher","first-page":"736","DOI":"10.1287\/opre.40.4.736","volume":"40","author":"G. Dobson","year":"1992","unstructured":"Dobson, G.: The cyclic lot scheduling problem with sequence-dependent setups. Operations Research\u00a040, 736\u2013749 (1992)","journal-title":"Operations Research"},{"key":"1_CR19","doi-asserted-by":"crossref","unstructured":"Ouyang, H., Zhu, X.: An economic lot scheduling problem for manufacturing and remanufacturing. In: IEEE Conference on Cybernetics and Intelligent Systems, Chengdu, pp. 1171\u20131175 (2008)","DOI":"10.1109\/ICCIS.2008.4670892"}],"container-title":["Advances in Intelligent Systems and Computing","Soft Computing Models in Industrial and Environmental Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-32922-7_1.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,7]],"date-time":"2025-04-07T03:45:14Z","timestamp":1743997514000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-32922-7_1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642329210","9783642329227"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-32922-7_1","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"value":"2194-5357","type":"print"},{"value":"2194-5365","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013]]}}}