{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T20:00:11Z","timestamp":1759694411715},"publisher-location":"Berlin, Heidelberg","reference-count":26,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642329630"},{"type":"electronic","value":"9783642329647"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-32964-7_15","type":"book-chapter","created":{"date-parts":[[2012,8,25]],"date-time":"2012-08-25T18:49:32Z","timestamp":1345920572000},"page":"143-152","source":"Crossref","is-referenced-by-count":21,"title":["An Artificial Bee Colony Algorithm for the Unrelated Parallel Machines Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Francisco J.","family":"Rodriguez","sequence":"first","affiliation":[]},{"given":"Carlos","family":"Garc\u00eda-Mart\u00ednez","sequence":"additional","affiliation":[]},{"given":"Christian","family":"Blum","sequence":"additional","affiliation":[]},{"given":"Manuel","family":"Lozano","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"1","key":"15_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/05695557408974926","volume":"6","author":"S. Elmaghraby","year":"1974","unstructured":"Elmaghraby, S., Park, S.: Scheduling jobs on a number of identical machines. AIIE Transactions\u00a06(1), 1\u201313 (1974)","journal-title":"AIIE Transactions"},{"issue":"1","key":"15_CR2","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0377-2217(97)00427-X","volume":"113","author":"M. Azizoglu","year":"1999","unstructured":"Azizoglu, M., Kirca, O.: On the minimization of total weighted flow time with identical and uniform parallel machines. European Journal of Operational Research\u00a0113(1), 91\u2013100 (1999)","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"15_CR3","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A. Allahverdi","year":"1999","unstructured":"Allahverdi, A., Gupta, J., Aldowaisan, T.: A review of scheduling research involving setup considerations. Omega\u00a027(2), 219\u2013239 (1999)","journal-title":"Omega"},{"key":"15_CR4","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1016\/0377-2217(87)90131-7","volume":"31","author":"E. Rosenbloom","year":"1987","unstructured":"Rosenbloom, E., Goertzen, N.: Cyclic nurse scheduling. European Journal of Operational Research\u00a031, 19\u201323 (1987)","journal-title":"European Journal of Operational Research"},{"key":"15_CR5","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1016\/0377-2217(89)90349-4","volume":"39","author":"G. Buxey","year":"1989","unstructured":"Buxey, G.: Production scheduling: Practice and theory. European Journal of Operational Research\u00a039, 17\u201331 (1989)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"15_CR6","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1016\/0377-2217(91)90162-O","volume":"52","author":"B. Dodin","year":"1991","unstructured":"Dodin, B., Chan, K.H.: Application of production scheduling methods to external and internal audit scheduling. European Journal of Operational Research\u00a052(3), 267\u2013279 (1991)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"15_CR7","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1023\/A:1018958209290","volume":"95","author":"P. Pendharkar","year":"2000","unstructured":"Pendharkar, P., Rodger, J.: Nonlinear programming and genetic search application for production scheduling in coal mines. Annals of Operations Research\u00a095(1), 251\u2013267 (2000)","journal-title":"Annals of Operations Research"},{"issue":"2","key":"15_CR8","doi-asserted-by":"publisher","first-page":"192","DOI":"10.1016\/0377-2217(92)90025-5","volume":"63","author":"A.I.Z. Jarrah","year":"1992","unstructured":"Jarrah, A.I.Z., Bard, J.F., de Silva, A.H.: A heuristic for machine scheduling at general mail facilities. European Journal of Operational Research\u00a063(2), 192\u2013206 (1992)","journal-title":"European Journal of Operational Research"},{"key":"15_CR9","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1023\/A:1009613700772","volume":"4","author":"Y. Rochat","year":"1998","unstructured":"Rochat, Y.: A genetic approach for solving a scheduling problem in a robotized analytical system. Journal of Heuristics\u00a04, 245\u2013261 (1998)","journal-title":"Journal of Heuristics"},{"key":"15_CR10","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1023\/A:1018999101596","volume":"92","author":"F.D. Croce","year":"1999","unstructured":"Croce, F.D., Tadei, R., Asioli, P.: Scheduling a round robin tennis tournamentunder courts and players availability constraints. Annals of Operations Research\u00a092, 349\u2013361 (1999)","journal-title":"Annals of Operations Research"},{"issue":"1","key":"15_CR11","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1023\/A:1018959704264","volume":"96","author":"P. Brucker","year":"2000","unstructured":"Brucker, P., Hurink, J.: Solving a chemical batch scheduling problem by local search. Annals of Operations Research\u00a096(1), 17\u201338 (2000)","journal-title":"Annals of Operations Research"},{"issue":"2","key":"15_CR12","first-page":"153","volume":"31","author":"M. Azizoglu","year":"1999","unstructured":"Azizoglu, M., Kirca, O.: Scheduling jobs on unrelated parallel machines to minimize regular total cost functions. IIE Transactions\u00a031(2), 153\u2013159 (1999)","journal-title":"IIE Transactions"},{"issue":"3","key":"15_CR13","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1007\/s10898-007-9149-x","volume":"39","author":"D. Karaboga","year":"2007","unstructured":"Karaboga, D., Basturk, B.: A powerful and efficient algorithm for numerical function optimization: artificial bee colony (abc) algorithm. J. of Global Optimization\u00a039(3), 459\u2013471 (2007)","journal-title":"J. of Global Optimization"},{"issue":"1","key":"15_CR14","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1016\/j.asoc.2007.05.007","volume":"8","author":"D. Karaboga","year":"2008","unstructured":"Karaboga, D., Basturk, B.: On the performance of artificial bee colony (ABC) algorithm. Applied Soft Computing\u00a08(1), 687\u2013697 (2008)","journal-title":"Applied Soft Computing"},{"issue":"17","key":"15_CR15","doi-asserted-by":"publisher","first-page":"3182","DOI":"10.1016\/j.ins.2010.05.001","volume":"180","author":"S. Sundar","year":"2010","unstructured":"Sundar, S., Singh, A.: A swarm intelligence approach to the quadratic minimum spanning tree problem. Information Sciences\u00a0180(17), 3182\u20133191 (2010)","journal-title":"Information Sciences"},{"issue":"1","key":"15_CR16","doi-asserted-by":"publisher","first-page":"342","DOI":"10.1016\/j.asoc.2011.08.038","volume":"12","author":"M.H. Kashan","year":"2012","unstructured":"Kashan, M.H., Nahavandi, N., Kashan, A.H.: DisABC: A new artificial bee colony algorithm for binary optimization. Applied Soft Computing\u00a012(1), 342\u2013352 (2012)","journal-title":"Applied Soft Computing"},{"key":"15_CR17","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.swevo.2011.08.001","volume":"2","author":"R. Akbari","year":"2012","unstructured":"Akbari, R., Hedayatzadeh, R., Ziarati, K., Hassanizadeh, B.: A multi-objective artificial bee colony algorithm. Swarm and Evolutionary Computation\u00a02, 39\u201352 (2012)","journal-title":"Swarm and Evolutionary Computation"},{"key":"15_CR18","doi-asserted-by":"publisher","first-page":"1129","DOI":"10.1002\/1520-6750(199510)42:7<1129::AID-NAV3220420711>3.0.CO;2-M","volume":"42","author":"L. Jacobs","year":"1995","unstructured":"Jacobs, L., Brusco, M.: A local-search heuristic for large set-covering problems. Naval Research Logistics\u00a042, 1129\u20131140 (1995)","journal-title":"Naval Research Logistics"},{"issue":"3","key":"15_CR19","doi-asserted-by":"publisher","first-page":"2033","DOI":"10.1016\/j.ejor.2005.12.009","volume":"177","author":"R. Ruiz","year":"2007","unstructured":"Ruiz, R., St\u00fctzle, T.: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. European Journal of Operational Research\u00a0177(3), 2033\u20132049 (2007)","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"15_CR20","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/mnsc.6.1.1","volume":"6","author":"R. McNaughton","year":"1959","unstructured":"McNaughton, R.: Scheduling with deadlines and loss functions. Management Science\u00a06(1), 1\u201312 (1959)","journal-title":"Management Science"},{"issue":"2","key":"15_CR21","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1287\/ijoc.14.2.175.119","volume":"14","author":"T. Vredeveld","year":"2002","unstructured":"Vredeveld, T., Hurkens, C.: Experimental comparison of approximation algorithms for scheduling unrelated parallel machines. Informs Journal on Computing\u00a014(2), 175\u2013189 (2002)","journal-title":"Informs Journal on Computing"},{"issue":"6","key":"15_CR22","doi-asserted-by":"publisher","first-page":"901","DOI":"10.1016\/j.cor.2010.08.018","volume":"38","author":"Y. Lin","year":"2011","unstructured":"Lin, Y., Pfund, M., Fowler, J.: Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Computers & Operations Research\u00a038(6), 901\u2013916 (2011)","journal-title":"Computers & Operations Research"},{"issue":"1-4","key":"15_CR23","doi-asserted-by":"publisher","first-page":"513","DOI":"10.1016\/0360-8352(95)00126-L","volume":"29","author":"R. Cheng","year":"1995","unstructured":"Cheng, R., Gen, M., Tozawa, T.: Minmax earliness\/tardiness scheduling in identical parallel machine system using genetic algorithms. Computers & Industrial Engineering\u00a029(1-4), 513\u2013517 (1995)","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"15_CR24","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.ejor.2010.03.030","volume":"207","author":"L. Fanjul-Peyro","year":"2010","unstructured":"Fanjul-Peyro, L., Ruiz, R.: Iterated greedy local search methods for unrelated parallel machine scheduling. European Journal of Operational Research\u00a0207(1), 55\u201369 (2010)","journal-title":"European Journal of Operational Research"},{"key":"15_CR25","unstructured":"Zaidi, M., Jarboui, B., Loukil, T., Kacem, I.: Hybrid meta-heuristics for uniform parallel machine to minimize total weighted completion time. In: Proc. of 8th International Conference of Modeling and Simulation, MOSIM 2010 (2010)"},{"key":"15_CR26","doi-asserted-by":"publisher","first-page":"617","DOI":"10.1007\/s10732-008-9080-4","volume":"15","author":"S. Garcia","year":"2008","unstructured":"Garcia, S., Molina, D., Lozano, M., Herrera, F.: A study on the use of non-parametric tests for analyzing the evolutionary algorithms\u2019 behaviour: A case study on the CEC\u20192005 special session on real parameter optimization. Journal of Heuristics\u00a015, 617\u2013644 (2008)","journal-title":"Journal of Heuristics"}],"container-title":["Lecture Notes in Computer Science","Parallel Problem Solving from Nature - PPSN XII"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-32964-7_15.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T11:50:12Z","timestamp":1620129012000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-32964-7_15"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642329630","9783642329647"],"references-count":26,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-32964-7_15","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2012]]}}}