{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T09:08:45Z","timestamp":1725613725994},"publisher-location":"Berlin, Heidelberg","reference-count":17,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642335860"},{"type":"electronic","value":"9783642335877"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-33587-7_12","type":"book-chapter","created":{"date-parts":[[2012,8,24]],"date-time":"2012-08-24T22:24:09Z","timestamp":1345847049000},"page":"159-170","source":"Crossref","is-referenced-by-count":1,"title":["Application of Cycle-Based Simulation to Estimate Loss of Logistics Productivity on Construction Sites"],"prefix":"10.1007","author":[{"given":"Feng","family":"Xu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuanbin","family":"Song","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hao","family":"Hu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"12_CR1","doi-asserted-by":"publisher","first-page":"740","DOI":"10.1061\/40513(279)97","volume-title":"Computing in Civil and Building Engineering","author":"B. Akinci","year":"2000","unstructured":"Akinci, B., Fischen, M.: Four-dimensional Workplanner\u2014A Prototype System for Automated Generation of Construction Spaces and Analysis of Time-space Conflicts. In: Fruchter, R., et al. (eds.) Computing in Civil and Building Engineering, pp. 740\u2013747. ASCE, Reston (2000)"},{"issue":"2","key":"12_CR2","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1061\/(ASCE)0887-3801(2002)16:2(124)","volume":"16","author":"B. Akinci","year":"2002","unstructured":"Akinci, B., Fischen, M., Levitt, R., et al.: Formalization and Automation of Time-Space Conflict Analysis. Journal of Computing in Civil Engineering\u00a016(2), 124\u2013134 (2002)","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"3","key":"12_CR3","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1061\/JCCEAZ.0000712","volume":"103","author":"D.W. Halpin","year":"1977","unstructured":"Halpin, D.W.: CYCLONE-method for Modeling Job Site Processes. Journal of Construction Division, ASCE 103(3), 489\u2013499 (1977)","journal-title":"Journal of Construction Division, ASCE"},{"key":"12_CR4","unstructured":"Halpin, D.W.: MicroCYCLONE User\u2019s Manual. West Lafayette, Division of Construction Engineering and Management, Purdue University, Indiana (1990)"},{"key":"12_CR5","unstructured":"Howell, G., Ballard, G.: Factors Affecting Project Success in the Piping Function. In: Alarcon, L. (ed.) Lean Construction, Rotterdam, The Netherlands, pp. 161\u2013185 (1997)"},{"issue":"7","key":"12_CR6","first-page":"1194","volume":"42","author":"Y.-P. Kuang","year":"2008","unstructured":"Kuang, Y.-P., Xiong, Y., Zhang, M.-F.: Ant Colony Algorithm for Construction Resource Leveling. Journal of Zhejiang University (Engineering Science)\u00a042(7), 1194\u20131198 (2008) (in Chinese)","journal-title":"Journal of Zhejiang University (Engineering Science)"},{"issue":"3","key":"12_CR7","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1061\/(ASCE)0733-9364(1998)124:3(232)","volume":"124","author":"K.G. Mattila","year":"1998","unstructured":"Mattila, K.G., Abraham, D.M.: Resource Leveling of Linear Schedules Using Integer Linear Programming. Journal of Construction Engineering and Management\u00a0124(3), 232\u2013244 (1998)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"1","key":"12_CR8","doi-asserted-by":"publisher","first-page":"30","DOI":"10.1061\/(ASCE)CO.1943-7862.0000246","volume":"137","author":"M. Panagiotis","year":"2011","unstructured":"Panagiotis, M., Manoj, N.: New Method for Measuring the Safety Risk of Construction Activities: Task Demand Assessment. Journal of Construction Engineering and Management\u00a0137(1), 30\u201338 (2011)","journal-title":"Journal of Construction Engineering and Management"},{"issue":"7","key":"12_CR9","doi-asserted-by":"publisher","first-page":"625","DOI":"10.1080\/01446190903002771","volume":"27","author":"R. Ophir","year":"2009","unstructured":"Ophir, R., Rafael, S., Yehiel, R.: \u2018CHASTE\u2019: Construction Hazard Assessment with Spatial and Temporal Exposure. Construction Management and Economics\u00a027(7), 625\u2013638 (2009)","journal-title":"Construction Management and Economics"},{"issue":"8","key":"12_CR10","doi-asserted-by":"publisher","first-page":"726","DOI":"10.1061\/(ASCE)0733-9364(2009)135:8(726)","volume":"135","author":"R. Sacks","year":"2009","unstructured":"Sacks, R., Rozenfeld, O., Rosenfeld, Y.: Spatial and Temporal Exposure to Safety Hazards in Construction. Journal of Construction Engineering and Management\u00a0135(8), 726\u2013736 (2009)","journal-title":"Journal of Construction Engineering and Management"},{"key":"12_CR11","unstructured":"Sanders, S.R., Thomas, H.R., Smith, G.R.: An Analysis of Factors Affecting Labor Productivity in Masonry Construction. PTI#9003, Pennsylvania State Univ., University Park, PA, Pennsylvania (1989)"},{"key":"12_CR12","unstructured":"Serra, S.M.B., Oliveira, O.J.: Development of the Logistics Plan in Building Construction. In: Bontempi (ed.) System-based Vision for Strategic and Creative Design, pp. 75\u201380. Lisse, Swets&Zeitlinger (2003)"},{"issue":"1","key":"12_CR13","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(23)","volume":"125","author":"J. Son","year":"1999","unstructured":"Son, J., Skibniewski, M.J.: Multi-heuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. Journal of Construction Engineering and Management\u00a0125(1), 23\u201331 (1999)","journal-title":"Journal of Construction Engineering and Management"},{"key":"12_CR14","unstructured":"Strategic Forum for Construction Logistics Group (2005). Improving Construction Logistics, Technical Report, p. 5 (August 2005)"},{"key":"12_CR15","unstructured":"Veiseth, M., Rostad, C.C., Andersen, B.: Productivity and Logistics in the Construction Industry. In: Conference Proceeding, Nordnet 2003, Oslo, September 26 (2003)"},{"key":"12_CR16","first-page":"513","volume-title":"Proceedings of the International Conference on Information Management, Innovation Management and Industrial Engineering","author":"F. Xu","year":"2009","unstructured":"Xu, F., Song, Y.: Spatio-Temporal Analysis of Hazards to Achieve Safer Schedule. In: Proceedings of the International Conference on Information Management, Innovation Management and Industrial Engineering, pp. 513\u2013516. IEEE Computer Society\u2019s Conference Publishing Services, Xi\u2019an (2009)"},{"issue":"4","key":"12_CR17","first-page":"102","volume":"21","author":"F. Xu","year":"2011","unstructured":"Xu, F., Song, Y.-B., Hu, H.: Hazard Space Modeling for Falling from Edge of High Places on Construction Site. China Safety Science Journal\u00a021(4), 102\u2013108 (2011) (in Chinese)","journal-title":"China Safety Science Journal"}],"container-title":["Lecture Notes in Computer Science","Computational Logistics"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-33587-7_12.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,27]],"date-time":"2022-01-27T08:14:33Z","timestamp":1643271273000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-33587-7_12"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642335860","9783642335877"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-33587-7_12","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2012]]}}}