{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,27]],"date-time":"2025-10-27T20:36:18Z","timestamp":1761597378161},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642339790"},{"type":"electronic","value":"9783642339806"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-33980-6_5","type":"book-chapter","created":{"date-parts":[[2012,9,26]],"date-time":"2012-09-26T18:33:08Z","timestamp":1348684388000},"page":"37-44","source":"Crossref","is-referenced-by-count":2,"title":["Mathematical Formulation for Mobile Robot Scheduling Problem in a Manufacturing Cell"],"prefix":"10.1007","author":[{"given":"Quang-Vinh","family":"Dang","sequence":"first","affiliation":[]},{"given":"Izabela","family":"Nielsen","sequence":"additional","affiliation":[]},{"given":"Kenn","family":"Steger-Jensen","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"5_CR1","doi-asserted-by":"publisher","first-page":"952","DOI":"10.1287\/opre.45.6.952","volume":"45","author":"Y. Crama","year":"1997","unstructured":"Crama, Y., van de Klundert, J.: Cyclic Scheduling of Identical Parts in a Robotic Cell. Oper. Res.\u00a045, 952\u2013965 (1997)","journal-title":"Oper. Res."},{"key":"5_CR2","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1002\/(SICI)1099-1425(199901\/02)2:1<35::AID-JOS15>3.0.CO;2-J","volume":"2","author":"Y. Crama","year":"1999","unstructured":"Crama, Y., van de Klundert, J.: Cyclic Scheduling in 3-machine Robotic Flow Shops. J. Sched.\u00a02, 35\u201354 (1999)","journal-title":"J. Sched."},{"key":"5_CR3","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1023\/A:1018995317468","volume":"96","author":"Y. Crama","year":"2000","unstructured":"Crama, Y., Kats, V., van de Klundert, J., Levner, E.: Cyclic Scheduling in Robotic Flowshops. Ann. Oper. Res.\u00a096, 97\u2013124 (2000)","journal-title":"Ann. Oper. Res."},{"key":"5_CR4","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/0360-8352(87)90022-2","volume":"12","author":"M. Dror","year":"1987","unstructured":"Dror, M., Stulman, A.: Optimizing Robot\u2019s Service Movement: a One Dimensional Case. Comput. Ind. Eng.\u00a012, 39\u201346 (1987)","journal-title":"Comput. Ind. Eng."},{"key":"5_CR5","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1007\/s10951-010-0166-0","volume":"14","author":"V. Kats","year":"2011","unstructured":"Kats, V., Levner, E.: Parametric Algorithms for 2-cyclic Robot Scheduling with Interval Processing Times. J. Sched.\u00a014, 267\u2013279 (2011)","journal-title":"J. Sched."},{"key":"5_CR6","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/j.ejor.2010.10.002","volume":"209","author":"V. Kats","year":"2011","unstructured":"Kats, V., Levner, E.: A Faster Algorithm for 2-cyclic Robotic Scheduling with a Fixed Robot Route and Interval Processing Times. Eur. J. Oper. Res.\u00a0209, 51\u201356 (2011)","journal-title":"Eur. J. Oper. Res."},{"key":"5_CR7","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1016\/S0954-1810(00)00008-X","volume":"14","author":"O. Maimon","year":"2000","unstructured":"Maimon, O., Braha, D., Seth, V.: A Neural Network Approach for a Robot Task Sequencing Problem. Artif. Intell. Eng.\u00a014, 175\u2013189 (2000)","journal-title":"Artif. Intell. Eng."},{"key":"5_CR8","doi-asserted-by":"publisher","first-page":"185","DOI":"10.1016\/j.rcim.2004.07.013","volume":"21","author":"R. Su\u00e1rez","year":"2005","unstructured":"Su\u00e1rez, R., Rosell, J.: Feeding Sequence Selection in a Manufacturing Cell with Four Parallel Machines. Robot Comput. Integrated Manuf.\u00a021, 185\u2013195 (2005)","journal-title":"Robot Comput. Integrated Manuf."},{"key":"5_CR9","doi-asserted-by":"publisher","DOI":"10.1137\/1.9780898718515","volume-title":"The Vehicle Routing Problem","author":"P. Toth","year":"2002","unstructured":"Toth, P., Vigo, D.: The Vehicle Routing Problem. SIAM, Philadelphia (2002)"},{"key":"5_CR10","volume-title":"Inventory Management and Production Planning and Scheduling","author":"E.A. Silver","year":"1998","unstructured":"Silver, E.A., Pyke, D.F., Peterson, R.: Inventory Management and Production Planning and Scheduling. John Wiley & Sons, New York (1998)"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-33980-6_5.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T12:28:19Z","timestamp":1620131299000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-33980-6_5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642339790","9783642339806"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-33980-6_5","relation":{},"ISSN":["1868-4238","1861-2288"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1861-2288"}],"subject":[],"published":{"date-parts":[[2012]]}}}