{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T10:00:52Z","timestamp":1725703252721},"publisher-location":"Berlin, Heidelberg","reference-count":58,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642339790"},{"type":"electronic","value":"9783642339806"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-33980-6_7","type":"book-chapter","created":{"date-parts":[[2012,9,26]],"date-time":"2012-09-26T18:33:08Z","timestamp":1348684388000},"page":"54-65","source":"Crossref","is-referenced-by-count":1,"title":["A Conceptual Model for Integrating Transport Planning: MRP IV"],"prefix":"10.1007","author":[{"given":"Josefa","family":"Mula","sequence":"first","affiliation":[]},{"given":"Manuel","family":"D\u00edaz-Madro\u00f1ero","sequence":"additional","affiliation":[]},{"given":"David","family":"Peidro","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"7_CR1","volume-title":"Material Requirements Planning","author":"J. Orlicky","year":"1975","unstructured":"Orlicky, J.: Material Requirements Planning. McGraw-Hill, New York (1975)"},{"key":"7_CR2","volume-title":"MRP II\u2014Unlocking America\u2019s Productivity Potential","author":"O.W. White","year":"1981","unstructured":"White, O.W.: MRP II\u2014Unlocking America\u2019s Productivity Potential. CBI Publishing, Boston (1981)"},{"key":"7_CR3","unstructured":"Schollaert, F.: Money resource planning, MRP-III: the ultimate marriage between business logistics and financial management information systems. Library Albert (1994)"},{"issue":"339.2","key":"7_CR4","first-page":"1","volume":"300","author":"L. Wylie","year":"1990","unstructured":"Wylie, L.: ERP: A vision of the next-generation MRP II. Computer Integrated Manufacturing\u00a0300(339.2), 1\u20135 (1990)","journal-title":"Computer Integrated Manufacturing"},{"key":"7_CR5","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-74512-9","volume-title":"Supply chain management and advanced planning: concepts, models, software and case studies","author":"H. Stadtler","year":"2008","unstructured":"Stadtler, H., Kilger, C.: Supply chain management and advanced planning: concepts, models, software and case studies. Springer, Berlin (2008)"},{"key":"7_CR6","unstructured":"Ptak, C., Smith, C.: Orlicky\u2019s Material Requirements Planning 3\/E. McGraw-Hill Professional (2011)"},{"issue":"2","key":"7_CR7","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1007\/BF00934577","volume":"35","author":"R. Karni","year":"1981","unstructured":"Karni, R.: Integer linear programming formulation of the material requirements planning problem. Journal of Optimization Theory and Applications\u00a035(2), 217\u2013230 (1981)","journal-title":"Journal of Optimization Theory and Applications"},{"key":"7_CR8","doi-asserted-by":"crossref","unstructured":"Billington, P.J., McClain, J.O., Thomas, L.J.: Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Management Science, 1126\u20131141 (1983)","DOI":"10.1287\/mnsc.29.10.1126"},{"issue":"2","key":"7_CR9","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1016\/j.ijpe.2005.04.002","volume":"102","author":"M.M. Yenisey","year":"2006","unstructured":"Yenisey, M.M.: A flow-network approach for equilibrium of material requirements planning. International Journal of Production Economics\u00a0102(2), 317\u2013332 (2006)","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"7_CR10","doi-asserted-by":"publisher","first-page":"887","DOI":"10.1243\/09544054JEM1014","volume":"222","author":"S. Noori","year":"2008","unstructured":"Noori, S., Feylizadeh, M.R., Bagherpour, M., Zorriassatine, F., Parkin, R.M.: Optimization of material requirement planning by fuzzy multi-objective linear programming. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture\u00a0222(7), 887\u2013900 (2008)","journal-title":"Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture"},{"key":"7_CR11","unstructured":"Tavakoli-Moghaddam, R., Bagherpour, M., Noora, A.A., Sassani, F.: Application of fuzzy lead time to a material requirement planning system. In: Proceedings of the 8th Conference on 8th WSEAS International Conference on Fuzzy Systems, vol.\u00a08, pp. 208\u2013213 (2007)"},{"key":"7_CR12","doi-asserted-by":"crossref","unstructured":"Sun, L., Heragu, S.S., Chen, L., Spearman, M.L.: Simulation analysis of a multi-item MRP system based on factorial design. In: Proceedings of the 2009 Winter Simulation Conference (WSC), pp. 2107\u20132114 (2009)","DOI":"10.1109\/WSC.2009.5429655"},{"issue":"2","key":"7_CR13","doi-asserted-by":"publisher","first-page":"474","DOI":"10.1016\/j.ijpe.2007.02.005","volume":"121","author":"K. Inderfurth","year":"2009","unstructured":"Inderfurth, K.: How to protect against demand and yield risks in MRP systems. International Journal of Production Economics\u00a0121(2), 474\u2013481 (2009)","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"7_CR14","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1007\/s00170-007-1351-y","volume":"40","author":"Y. Barba-Guti\u00e9rrez","year":"2009","unstructured":"Barba-Guti\u00e9rrez, Y., Adenso-D\u00edaz, B.: Reverse MRP under uncertain and imprecise demand. The International Journal of Advanced Manufacturing Technology\u00a040(3), 413\u2013424 (2009)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"7_CR15","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1016\/j.fss.2005.05.045","volume":"157","author":"J. Mula","year":"2006","unstructured":"Mula, J., Poler, R., Garcia, J.P.: MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets and Systems\u00a0157(1), 74\u201397 (2006)","journal-title":"Fuzzy Sets and Systems"},{"issue":"7","key":"7_CR16","doi-asserted-by":"publisher","first-page":"783","DOI":"10.1016\/j.fss.2006.11.003","volume":"158","author":"J. Mula","year":"2007","unstructured":"Mula, J., Poler, R., Garcia-Sabater, J.P.: Material Requirement Planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets and Systems\u00a0158(7), 783\u2013793 (2007)","journal-title":"Fuzzy Sets and Systems"},{"issue":"20","key":"7_CR17","doi-asserted-by":"publisher","first-page":"5589","DOI":"10.1080\/00207540701413912","volume":"46","author":"J. Mula","year":"2008","unstructured":"Mula, J., Poler, R., Garcia-Sabater, J.P.: Capacity and material requirement planning modelling by comparing deterministic and fuzzy models. International Journal of Production Research\u00a046(20), 5589\u20135606 (2008)","journal-title":"International Journal of Production Research"},{"key":"7_CR18","series-title":"STUDFUZZ","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1007\/978-3-642-12052-7_3","volume-title":"Production Engineering and Management under Fuzziness","author":"J. Mula","year":"2010","unstructured":"Mula, J., Poler, R.: Fuzzy Material Requirement Planning. In: Kahraman, C., Yavuz, M. (eds.) Production Engineering and Management under Fuzziness. STUDFUZZ, vol.\u00a0252, pp. 39\u201357. Springer, Heidelberg (2010)"},{"key":"7_CR19","doi-asserted-by":"crossref","unstructured":"Li, T., Lin, P., Sun, G.J., Liu, H.H.: Application of Fuzzy Programming with Recourse in Material Requirement Planning Problem. In: International Conference on Measuring Technology and Mechatronics Automation, ICMTMA 2009, vol.\u00a02, pp. 546\u2013549 (2009)","DOI":"10.1109\/ICMTMA.2009.568"},{"issue":"2","key":"7_CR20","doi-asserted-by":"publisher","first-page":"132","DOI":"10.1007\/s11518-008-5072-z","volume":"17","author":"F. Hnaien","year":"2008","unstructured":"Hnaien, F., Dolgui, A., Ould Louly, M.A.: Planned lead time optimization in material requirement planning environment for multilevel production systems. Journal of Systems Science and Systems Engineering\u00a017(2), 132\u2013155 (2008)","journal-title":"Journal of Systems Science and Systems Engineering"},{"issue":"19","key":"7_CR21","doi-asserted-by":"publisher","first-page":"5441","DOI":"10.1080\/00207540802273827","volume":"46","author":"M.A. Louly","year":"2008","unstructured":"Louly, M.A., Dolgui, A., Hnaien, F.: Optimal supply planning in MRP environments for assembly systems with random component procurement times. International Journal of Production Research\u00a046(19), 5441\u20135467 (2008)","journal-title":"International Journal of Production Research"},{"issue":"1","key":"7_CR22","doi-asserted-by":"publisher","first-page":"76","DOI":"10.1016\/j.ijpe.2010.04.042","volume":"131","author":"M.A. Louly","year":"2011","unstructured":"Louly, M.A., Dolgui, A.: Optimal time phasing and periodicity for MRP with POQ policy. International Journal of Production Economics\u00a0131(1), 76\u201386 (2011)","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"7_CR23","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/j.ijpe.2005.09.001","volume":"103","author":"J. Mula","year":"2006","unstructured":"Mula, J., Poler, R., Garcia-Sabater, J.P., Lario, F.C.: Models for production planning under uncertainty: A review. International Journal of Production Economics\u00a0103(1), 271\u2013285 (2006)","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"7_CR24","doi-asserted-by":"publisher","first-page":"269","DOI":"10.1016\/j.arcontrol.2007.02.007","volume":"31","author":"A. Dolgui","year":"2007","unstructured":"Dolgui, A., Prodhon, C.: Supply planning under uncertainties in MRP environments: A state of the art. Annual Reviews in Control\u00a031(2), 269\u2013279 (2007)","journal-title":"Annual Reviews in Control"},{"key":"7_CR25","doi-asserted-by":"crossref","unstructured":"Wazed, M., Ahmed, S., Nukman, Y.: A review of manufacturing resources planning models under different uncertainties: state-of-the-art and future directions (2010)","DOI":"10.7166\/21-1-63"},{"issue":"6","key":"7_CR26","doi-asserted-by":"publisher","first-page":"616","DOI":"10.1080\/09537280802476078","volume":"19","author":"Y. Chen","year":"2008","unstructured":"Chen, Y., Miao, W.M., Lin, Z.Q., Chen, G.L.: Adjusting MRP for dynamic differen-tiation of identical items for process customisation. Production Planning and Control\u00a019(6), 616\u2013626 (2008)","journal-title":"Production Planning and Control"},{"issue":"2","key":"7_CR27","doi-asserted-by":"publisher","first-page":"399","DOI":"10.1080\/00207540500251505","volume":"44","author":"B. Ram","year":"2006","unstructured":"Ram, B., Naghshineh-Pour, M.R., Yu, X.: Material requirements planning with flexible bills-of-material. International Journal of Production Research\u00a044(2), 399\u2013415 (2006)","journal-title":"International Journal of Production Research"},{"issue":"2","key":"7_CR28","doi-asserted-by":"publisher","first-page":"639","DOI":"10.1016\/j.ijpe.2009.05.027","volume":"122","author":"J.T. Lin","year":"2009","unstructured":"Lin, J.T., Chen, T.L., Lin, Y.T.: Critical material planning for TFT-LCD production industry. International Journal of Production Economics\u00a0122(2), 639\u2013655 (2009)","journal-title":"International Journal of Production Economics"},{"issue":"5","key":"7_CR29","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B. Karimi","year":"2003","unstructured":"Karimi, B., Fatemi Ghomi, S.M.T., Wilson, J.M.: The capacitated lot sizing problem: a review of models and algorithms. Omega\u00a031(5), 365\u2013378 (2003)","journal-title":"Omega"},{"issue":"6","key":"7_CR30","doi-asserted-by":"publisher","first-page":"1619","DOI":"10.1080\/00207540600902262","volume":"46","author":"R. Jans","year":"2008","unstructured":"Jans, R., Degraeve, Z.: Modeling industrial lot sizing problems: a review. International Journal of Production Research\u00a046(6), 1619\u20131643 (2008)","journal-title":"International Journal of Production Research"},{"issue":"1","key":"7_CR31","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1007\/s10288-007-0057-1","volume":"6","author":"D. Quadt","year":"2008","unstructured":"Quadt, D., Kuhn, H.: Capacitated lot-sizing with extensions: a review. 4OR: A Quarterly Journal of Operations Research\u00a06(1), 61\u201383 (2008)","journal-title":"4OR: A Quarterly Journal of Operations Research"},{"issue":"2","key":"7_CR32","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1007\/s00291-008-0150-7","volume":"32","author":"L. Buschk\u00fchl","year":"2010","unstructured":"Buschk\u00fchl, L., Sahling, F., Helber, S., Tempelmeier, H.: Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectrum\u00a032(2), 231\u2013261 (2010)","journal-title":"OR Spectrum"},{"issue":"2","key":"7_CR33","doi-asserted-by":"publisher","first-page":"275","DOI":"10.1016\/S0305-0483(98)00045-0","volume":"27","author":"V.A. Armentano","year":"1999","unstructured":"Armentano, V.A., Fran\u00e7a, P.M., de Toledo, F.M.B.: A network flow model for the capacitated lot-sizing problem. Omega\u00a027(2), 275\u2013284 (1999)","journal-title":"Omega"},{"issue":"2","key":"7_CR34","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1016\/0377-2217(94)90076-0","volume":"75","author":"H. Tempelmeier","year":"1994","unstructured":"Tempelmeier, H., Helber, S.: A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures. European Journal of Operational Research\u00a075(2), 296\u2013311 (1994)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"7_CR35","doi-asserted-by":"publisher","first-page":"561","DOI":"10.1016\/0377-2217(95)00094-1","volume":"94","author":"H. Stadtler","year":"1996","unstructured":"Stadtler, H.: Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing. European Journal of Operational Research\u00a094(3), 561\u2013581 (1996)","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"7_CR36","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1007\/BF01545506","volume":"19","author":"H. Stadtler","year":"1997","unstructured":"Stadtler, H.: Reformulations of the shortest route model for dynamic multi-item multi-level capacitated lotsizing. OR Spectrum\u00a019(2), 87\u201396 (1997)","journal-title":"OR Spectrum"},{"issue":"4","key":"7_CR37","doi-asserted-by":"publisher","first-page":"773","DOI":"10.1007\/s00291-007-0094-3","volume":"30","author":"M. Denizel","year":"2008","unstructured":"Denizel, M., Altekin, F.T., S\u00fcral, H., Stadtler, H.: Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times. OR Spectrum\u00a030(4), 773\u2013785 (2008)","journal-title":"OR Spectrum"},{"key":"7_CR38","doi-asserted-by":"crossref","unstructured":"Belvaux, G., Wolsey, L.A.: Modelling practical lot-sizing problems as mixed-integer programs. Management Science, 993\u20131007 (2001)","DOI":"10.1287\/mnsc.47.7.993.9800"},{"issue":"2","key":"7_CR39","doi-asserted-by":"publisher","first-page":"874","DOI":"10.1016\/j.ejor.2005.03.033","volume":"174","author":"C. Suerie","year":"2006","unstructured":"Suerie, C.: Modeling of period overlapping setup times. European Journal of Operational Research\u00a0174(2), 874\u2013886 (2006)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"7_CR40","doi-asserted-by":"publisher","first-page":"1351","DOI":"10.1016\/j.ejor.2006.01.053","volume":"185","author":"N. Absi","year":"2008","unstructured":"Absi, N., Kedad-Sidhoum, S.: The multi-item capacitated lot-sizing problem with setup times and shortage costs. European Journal of Operational Research\u00a0185(3), 1351\u20131374 (2008)","journal-title":"European Journal of Operational Research"},{"key":"7_CR41","doi-asserted-by":"crossref","unstructured":"Suerie, C., Stadtler, H.: The capacitated lot-sizing problem with linked lot sizes. Management Science, 1039\u20131054 (2003)","DOI":"10.1287\/mnsc.49.8.1039.16406"},{"issue":"3","key":"7_CR42","doi-asserted-by":"publisher","first-page":"490","DOI":"10.1287\/opre.1070.0392","volume":"55","author":"A. Federgruen","year":"2007","unstructured":"Federgruen, A., Meissner, J., Tzur, M.: Progressive interval heuristics for multi-item capacitated lot sizing problems. Operations Research\u00a055(3), 490 (2007)","journal-title":"Operations Research"},{"issue":"2","key":"7_CR43","doi-asserted-by":"publisher","first-page":"396","DOI":"10.1016\/j.ejor.2007.11.033","volume":"193","author":"K. Akartunal\u0131","year":"2009","unstructured":"Akartunal\u0131, K., Miller, A.J.: A heuristic approach for big bucket multi-level production planning problems. European Journal of Operational Research\u00a0193(2), 396\u2013411 (2009)","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"7_CR44","doi-asserted-by":"publisher","first-page":"909","DOI":"10.1287\/opre.1070.0404","volume":"55","author":"Z. Degraeve","year":"2007","unstructured":"Degraeve, Z., Jans, R.: A new Dantzig-Wolfe reformulation and branch-and-price algorithm for the capacitated lot-sizing problem with setup times. Operations Research\u00a055(5), 909\u2013920 (2007)","journal-title":"Operations Research"},{"issue":"1","key":"7_CR45","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1007\/s11518-006-0123-9","volume":"12","author":"H. Chen","year":"2003","unstructured":"Chen, H., Chu, C.: A Lagrangian relaxation approach for supply chain planning with order\/setup costs and capacity constraints. Journal of Systems Science and Systems Engineering\u00a012(1), 98\u2013110 (2003)","journal-title":"Journal of Systems Science and Systems Engineering"},{"issue":"3","key":"7_CR46","doi-asserted-by":"publisher","first-page":"1855","DOI":"10.1016\/j.ejor.2005.12.008","volume":"177","author":"R. Jans","year":"2007","unstructured":"Jans, R., Degraeve, Z.: Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches. European Journal of Operational Research\u00a0177(3), 1855\u20131875 (2007)","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"7_CR47","doi-asserted-by":"publisher","first-page":"895","DOI":"10.1016\/S0305-0548(99)00064-7","volume":"27","author":"G. Barbarosoglu","year":"2000","unstructured":"Barbarosoglu, G., \u00d6zdamar, L.: Analysis of solution space-dependent performance of simulated annealing: the case of the multi-level capacitated lot sizing problem. Computers & Operations Research\u00a027(9), 895\u2013903 (2000)","journal-title":"Computers & Operations Research"},{"issue":"3","key":"7_CR48","doi-asserted-by":"publisher","first-page":"319","DOI":"10.1016\/S0925-5273(99)00100-0","volume":"68","author":"L. \u00d6zdamar","year":"2000","unstructured":"\u00d6zdamar, L., Barbarosoglu, G.: An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem. International Journal of Production Economics\u00a068(3), 319\u2013331 (2000)","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"7_CR49","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1142\/S0217595905000510","volume":"22","author":"R. Berretta","year":"2005","unstructured":"Berretta, R., Franca, P.M., Armentano, V.A.: Metaheuristic approaches for the multi-level resource-constrained lot-sizing problem with setup and lead times. Asia-Pacific Journal of Operational Research\u00a022(2), 261\u2013286 (2005)","journal-title":"Asia-Pacific Journal of Operational Research"},{"key":"7_CR50","doi-asserted-by":"crossref","unstructured":"Karimi, B., Ghomi, S.M.T.F., Wilson, J.M.: A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. Journal of the Operational Research Society (March 2005)","DOI":"10.1057\/palgrave.jors.2601968"},{"key":"7_CR51","doi-asserted-by":"crossref","unstructured":"Hung, Y.-F., Chien, K.-L., et al.: A multi-class multi-level capacitated lot sizing model (November 2000)","DOI":"10.2307\/254215"},{"issue":"1-2","key":"7_CR52","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1016\/S0898-1221(02)00146-3","volume":"44","author":"J. Xie","year":"2002","unstructured":"Xie, J., Dong, J.: Heuristic genetic algorithms for general capacitated lot-sizing problems. Computers & Mathematics with Applications\u00a044(1-2), 263\u2013276 (2002)","journal-title":"Computers & Mathematics with Applications"},{"issue":"5","key":"7_CR53","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1007\/s00170-005-0347-8","volume":"32","author":"H. Jung","year":"2007","unstructured":"Jung, H., Song, I., Jeong, B.: Genetic algorithm-based integrated production planning considering manufacturing partners. The International Journal of Advanced Manufacturing Technology\u00a032(5), 547\u2013556 (2007)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"7_CR54","doi-asserted-by":"publisher","first-page":"204","DOI":"10.1016\/j.ijpe.2004.05.025","volume":"98","author":"W.S. Lee","year":"2005","unstructured":"Lee, W.S., Han, J.H., Cho, S.J.: A heuristic algorithm for a multi-product dynamic lot-sizing and shipping problem. International Journal of Production Economics\u00a098(2), 204\u2013214 (2005)","journal-title":"International Journal of Production Economics"},{"key":"7_CR55","doi-asserted-by":"crossref","unstructured":"Garcia-Sabater, J.P., Maheut, J., Garcia-Sabater, J.J.: A capacitated material require-ments planning model considering delivery constraints: A case study from the automotive industry. In: International Conference on Computers & Industrial Engineering, CIE 2009, pp. 378\u2013383 (2009)","DOI":"10.1109\/ICCIE.2009.5223806"},{"issue":"2","key":"7_CR56","doi-asserted-by":"publisher","first-page":"428","DOI":"10.1287\/opre.1090.0727","volume":"58","author":"H.C. Hwang","year":"2010","unstructured":"Hwang, H.C.: Economic lot-sizing for integrated production and transportation. Operations Research\u00a058(2), 428\u2013444 (2010)","journal-title":"Operations Research"},{"issue":"1","key":"7_CR57","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1016\/j.ejor.2007.08.025","volume":"191","author":"K. Ertogral","year":"2008","unstructured":"Ertogral, K.: Multi-item single source ordering problem with transportation cost: A Lagrangian decomposition approach. European Journal of Operational Research\u00a0191(1), 156\u2013165 (2008)","journal-title":"European Journal of Operational Research"},{"key":"7_CR58","doi-asserted-by":"crossref","unstructured":"Sancak, E., Sibel Salman, F.: Multi-item dynamic lot-sizing with delayed transportation policy. International Journal of Production Economics (2011)","DOI":"10.1016\/j.ijpe.2011.02.004"}],"container-title":["IFIP Advances in Information and Communication Technology","Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-33980-6_7.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T12:39:37Z","timestamp":1620131977000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-33980-6_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642339790","9783642339806"],"references-count":58,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-33980-6_7","relation":{},"ISSN":["1868-4238","1861-2288"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1861-2288"}],"subject":[],"published":{"date-parts":[[2012]]}}}