{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,29]],"date-time":"2025-10-29T19:51:20Z","timestamp":1761767480732},"publisher-location":"Berlin, Heidelberg","reference-count":10,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642340406"},{"type":"electronic","value":"9783642340413"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012]]},"DOI":"10.1007\/978-3-642-34041-3_98","type":"book-chapter","created":{"date-parts":[[2012,9,7]],"date-time":"2012-09-07T01:19:34Z","timestamp":1346980774000},"page":"709-716","source":"Crossref","is-referenced-by-count":0,"title":["Abhesion Mechanics Model of Horizontal Well Cement-Formation Interface"],"prefix":"10.1007","author":[{"given":"Zhang","family":"Jinan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wang","family":"Yinlong","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ai","family":"Chi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yin","family":"Jindan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Feng","family":"Fuping","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"2","key":"98_CR1","first-page":"7","volume":"22","author":"J. Gu","year":"2005","unstructured":"Gu, J., Gao, D., Shi, F.: The two contacts cementing system in cementing job and its importance. Driuing Fluid and Completion Fluld\u00a022(2), 7\u201310 (2005)","journal-title":"Driuing Fluid and Completion Fluld"},{"key":"98_CR2","unstructured":"Gu, J., Gao, D., Shi, F.: The two contacts cementing system in cementing job and research status"},{"issue":"12","key":"98_CR3","doi-asserted-by":"crossref","first-page":"52","DOI":"10.3901\/JME.2009.08.052","volume":"26","author":"L. Li","year":"2009","unstructured":"Li, L., Zheng, S., Wang, B.: Application of the fracture mechanics on interfacial bond between steel and concrete. Engineering Mechanics\u00a026(12), 52\u201357 (2009)","journal-title":"Engineering Mechanics"},{"key":"98_CR4","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1016\/j.petrol.2006.04.021","volume":"55","author":"M.A. Mohiuddin","year":"2007","unstructured":"Mohiuddin, M.A., Khan, K., Abdulraheem, A.: Analysis of wellbore instability in vertical, directional, and horizontal wells using field data. Journal of Petroleum Science and Engineering\u00a055, 83\u201392 (2007)","journal-title":"Journal of Petroleum Science and Engineering"},{"issue":"12","key":"98_CR5","first-page":"92","volume":"26","author":"M. Cui","year":"2006","unstructured":"Cui, M., Ma, Y.: A new method for evaluating the effects of drilling fluid filter cake on bond quality of the second cementing interface. Natural Gas Industry\u00a026(12), 92\u201393, 96 (2006)","journal-title":"Natural Gas Industry"},{"key":"98_CR6","unstructured":"Nelson, E.B.: Dominique Guillot Well cementing. Schlumberger, 219\u2013231 (2006)"},{"key":"98_CR7","first-page":"73","volume":"19","author":"D. Hu","year":"2011","unstructured":"Hu, D.: Cementing Quality Analysis of Cement Interface. Journal of Inner Mongolia Petroleum Chemical Industry\u00a0(19), 73\u201375 (2011)","journal-title":"Journal of Inner Mongolia Petroleum Chemical Industry"},{"issue":"3","key":"98_CR8","first-page":"79","volume":"35","author":"X. Guo","year":"2011","unstructured":"Guo, X., Bu, Y., et al.: Initial Acting Force and Its Influence of Cementing System. Journal of China\u2019s Petroleum university (natural science edition)\u00a035(3), 79\u201383 (2011)","journal-title":"Journal of China\u2019s Petroleum university (natural science edition)"},{"issue":"1\/4","key":"98_CR9","doi-asserted-by":"publisher","first-page":"142","DOI":"10.1016\/j.matcom.2006.06.020","volume":"73","author":"P.R.B. Devloo","year":"2006","unstructured":"Devloo, P.R.B., Femandes, P.D., Gomes, S.M., et al.: A finite element model for three dimensional hydraulic fracturing. Mathematics and Computers in Simulation\u00a073(1\/4), 142\u2013155 (2006)","journal-title":"Mathematics and Computers in Simulation"},{"key":"98_CR10","doi-asserted-by":"crossref","unstructured":"Ladva, H.K.J., Craster, B., Jones, T.G.J.: The cement-to-formation interface in zonal isolation. SPE88016 (2004)","DOI":"10.2118\/88016-MS"}],"container-title":["Communications in Computer and Information Science","Information Computing and Applications"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-34041-3_98.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,5,4]],"date-time":"2021-05-04T08:42:42Z","timestamp":1620117762000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-34041-3_98"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012]]},"ISBN":["9783642340406","9783642340413"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-34041-3_98","relation":{},"ISSN":["1865-0929","1865-0937"],"issn-type":[{"type":"print","value":"1865-0929"},{"type":"electronic","value":"1865-0937"}],"subject":[],"published":{"date-parts":[[2012]]}}}