{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T03:19:58Z","timestamp":1743045598849,"version":"3.40.3"},"publisher-location":"Berlin, Heidelberg","reference-count":14,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642343353"},{"type":"electronic","value":"9783642343360"}],"license":[{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-3-642-34336-0_3","type":"book-chapter","created":{"date-parts":[[2012,10,11]],"date-time":"2012-10-11T14:49:43Z","timestamp":1349966983000},"page":"39-55","source":"Crossref","is-referenced-by-count":1,"title":["The Stability Box for Minimizing Total Weighted Flow Time under Uncertain Data"],"prefix":"10.1007","author":[{"given":"Yuri N.","family":"Sotskov","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tsung-Chyan","family":"Lai","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Frank","family":"Werner","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"issue":"2","key":"3_CR1","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1287\/mnsc.41.2.363","volume":"41","author":"R. Daniels","year":"1995","unstructured":"Daniels, R., Kouvelis, P.: Robust scheduling to hedge against processing time uncertainty in single stage production. Management Science\u00a041(2), 363\u2013376 (1995)","journal-title":"Management Science"},{"key":"3_CR2","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1016\/j.orl.2004.07.004","volume":"33","author":"A. Kasperski","year":"2005","unstructured":"Kasperski, A.: Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion. Operations Research Letters\u00a033, 431\u2013436 (2005)","journal-title":"Operations Research Letters"},{"key":"3_CR3","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1016\/j.orl.2007.11.004","volume":"36","author":"A. Kasperski","year":"2008","unstructured":"Kasperski, A., Zelinski, P.: A 2-approximation algorithm for interval data minmax regret sequencing problem with total flow time criterion. Operations Research Letters\u00a036, 343\u2013344 (2008)","journal-title":"Operations Research Letters"},{"key":"3_CR4","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1057\/palgrave.jors.2600690","volume":"50","author":"T.-C. Lai","year":"1999","unstructured":"Lai, T.-C., Sotskov, Y.: Sequencing with uncertain numerical data for makespan minimization. Journal of the Operations Research Society\u00a050, 230\u2013243 (1999)","journal-title":"Journal of the Operations Research Society"},{"issue":"3","key":"3_CR5","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1016\/S0895-7177(97)00132-5","volume":"26","author":"T.-C. Lai","year":"1997","unstructured":"Lai, T.-C., Sotskov, Y., Sotskova, N., Werner, F.: Optimal makespan scheduling with given bounds of processing times. Mathematical and Computer Modelling\u00a026(3), 67\u201386 (1997)","journal-title":"Mathematical and Computer Modelling"},{"key":"3_CR6","volume-title":"Scheduling: Theory, Algorithms, and Systems","author":"M. Pinedo","year":"2002","unstructured":"Pinedo, M.: Scheduling: Theory, Algorithms, and Systems. Prentice-Hall, Englewood Cliffs (2002)"},{"issue":"2","key":"3_CR7","doi-asserted-by":"publisher","first-page":"138","DOI":"10.1080\/09511920802209033","volume":"22","author":"I. Sabuncuoglu","year":"2009","unstructured":"Sabuncuoglu, I., Goren, S.: Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing\u00a022(2), 138\u2013157 (2009)","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"3_CR8","volume-title":"Scheduling under Fuzziness","author":"R. Slowinski","year":"1999","unstructured":"Slowinski, R., Hapke, M.: Scheduling under Fuzziness. Physica-Verlag, Heidelberg (1999)"},{"issue":"1","key":"3_CR9","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1002\/nav.3800030106","volume":"3","author":"W. Smith","year":"1956","unstructured":"Smith, W.: Various optimizers for single-stage production. Naval Research Logistics Quarterly\u00a03(1), 59\u201366 (1956)","journal-title":"Naval Research Logistics Quarterly"},{"key":"3_CR10","doi-asserted-by":"publisher","first-page":"556","DOI":"10.1016\/j.mcm.2009.03.006","volume":"50","author":"Y. Sotskov","year":"2009","unstructured":"Sotskov, Y., Egorova, N., Lai, T.-C.: Minimizing total weighted flow time of a set of jobs with interval processing times. Mathematical and Computer Modelling\u00a050, 556\u2013573 (2009)","journal-title":"Mathematical and Computer Modelling"},{"issue":"10","key":"3_CR11","doi-asserted-by":"publisher","first-page":"2038","DOI":"10.1134\/S0005117910100048","volume":"71","author":"Y. Sotskov","year":"2010","unstructured":"Sotskov, Y., Egorova, N., Werner, F.: Minimizing total weighted completion time with uncertain data: A stability approach. Automation and Remote Control\u00a071(10), 2038\u20132057 (2010)","journal-title":"Automation and Remote Control"},{"key":"3_CR12","doi-asserted-by":"publisher","first-page":"1271","DOI":"10.1016\/j.cor.2011.02.001","volume":"39","author":"Y. Sotskov","year":"2012","unstructured":"Sotskov, Y., Lai, T.-C.: Minimizing total weighted flow time under uncertainty using dominance and a stability box. Computers & Operations Research\u00a039, 1271\u20131289 (2012)","journal-title":"Computers & Operations Research"},{"key":"3_CR13","series-title":"Theory and Algorithms","volume-title":"Scheduling under Uncertainty","author":"Y. Sotskov","year":"2010","unstructured":"Sotskov, Y., Sotskova, N., Lai, T.-C., Werner, F.: Scheduling under Uncertainty. Theory and Algorithms. Belorusskaya nauka, Minsk (2010)"},{"key":"3_CR14","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1023\/A:1018960030420","volume":"83","author":"Y. Sotskov","year":"1998","unstructured":"Sotskov, Y., Wagelmans, A., Werner, F.: On the calculation of the stability radius of an optimal or an approximate schedule. Annals of Operations Research\u00a083, 213\u2013252 (1998)","journal-title":"Annals of Operations Research"}],"container-title":["Advances in Intelligent Systems and Computing","Simulation and Modeling Methodologies, Technologies and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-34336-0_3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,19]],"date-time":"2023-02-19T04:06:32Z","timestamp":1676779592000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-642-34336-0_3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013]]},"ISBN":["9783642343353","9783642343360"],"references-count":14,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-34336-0_3","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2013]]}}}